TRB's National Cooperative Highway Research Program (NCHRP) Report 658: Guidebook on Risk Analysis Tools and Management Practices to Control Transportation Project Costs explores specific, practical, and risk-related management practices and analysis tools designed to help manage and control transportation project costs.

Topics

Publication Info

132 pages | 8.5 x 11
Contents

Table of Contents

skim chapter
Front Matter i-xii
Risk Management Framework 1-1
Keys to Success 2-2
1.1 Introduction 3-4
1.3 Guidebook Organization 5-5
1.6 Summary 6-6
2.3 Cost Estimating and Cost Management Definitions 7-8
2.4 Timeline of Cost Estimating and Cost Management 9-10
2.6 Cost Management Process 11-11
2.7 Project Complexity and Impact on Estimation and Risk Management Process 12-13
2.8 A Strategic Approach 14-14
2.10 Summary 15-15
3.1 Introduction 16-16
3.2 Risk Management in Support of Cost Estimating and Cost Management 17-20
3.3 Risk Management Definitions 21-21
3.4 Risk Management Framework 22-35
3.5 Risk Management Policies and Performance Measures 36-38
3.6 Summary 39-39
4.2 Guidebook Structure and Layout 40-41
4.4 Summary 42-43
5.1 Introduction 44-44
5.2 Planning Phase Risk Identification 45-45
5.3 Planning Phase Risk Assessment and Analysis 46-47
5.4 Planning Phase Risk Mitigation and Planning 48-48
5.6 Planning Phase Risk Monitoring and Control 49-49
5.7 Conclusions 50-50
6.1 Introduction 51-51
6.2 Programming Phase Risk Identification 52-53
6.3 Programming Phase Risk Assessment and Analysis 54-55
6.4 Programming Phase Risk Mitigation and Planning 56-56
6.5 Programming Phase Risk Allocation 57-57
6.6 Programming Phase Risk Monitoring and Control 58-58
6.7 Conclusions 59-59
7.1 Introduction 60-60
7.2 Design Phase Risk Identification 61-62
7.3 Design Phase Risk Assessment and Analysis 63-64
7.4 Design Phase Risk Mitigation and Planning 65-66
7.5 Design Phase Risk Allocation 67-67
7.6 Design Phase Risk Monitoring and Control 68-68
7.7 Conclusions 69-69
8.2 Step One Implementation of Risk Strategy: Organizational Change 70-71
8.3 Step Two Implementation of Methods: Programmatic Change 72-72
8.4 Step Three Implementation of Tools: Project Change 73-73
8.5 Step Four Integrating the System: A Strategic Plan 74-74
8.6 Summary 75-75
9.2 Guidebook Development 76-76
9.4 Challenges and Keys to Success 77-78
References 79-79
D1.1 Contract Packaging 80-81
D1.2 Delivery Decision Support 82-84
I2.1 Red Flag Items 85-85
I2.3 Risk Checklists 86-89
I2.4 Assumption Analysis 90-90
I2.6 Crawford Slip Method 91-91
I2.7 SWOT Analysis 92-93
R3.1 Risk Management Plan 94-95
R3.2 Contingency - Percentage 96-100
R3.3 Contingency - Identified 101-101
R3.4 Estimate Ranges - Three-Point Estimates 102-102
R3.5 Estimate Ranges - Monte Carlo Analysis 103-105
R3.6 Risk Workshops 106-106
R3.7 Risk Priority Ranking 107-108
R3.8 Probability x Impact Matrix (P x I) 109-109
R3.9 Risk Comparison Table 110-110
R3.10 Risk Map 111-112
R3.12 Risk Register 113-116
R3.14 Self Modeling Worksheet 117-119
Abbreviations used without definitions in TRB publications 120-120