TRB’s Transit Cooperative Research Program (TCRP) Legal Research Digest 39: Competition Requirements of the Design/Build, Construction Manager at Risk, and Public-Private Partnership Contracts—Seven Case Studies explores the use of various project delivery methods, including design-build, construction management at risk, and a number of options considered public-private partnerships, through the examination of seven separate construction projects in various parts of the United States.

The examinations of the seven selected projects are designed to show how particular, and often unique, problems were addressed in each project by utilizing a wide variety of procurement and delivery methods.

Suggested Citation

National Academies of Sciences, Engineering, and Medicine. 2012. Competition Requirements of the Design/Build, Construction Manager at Risk, and Public-Private Partnership Contracts—Seven Case Studies. Washington, DC: The National Academies Press. https://doi.org/10.17226/14639.

Import this citation to:

Publication Info

53 pages |  8.5 x 11 |  DOI: https://doi.org/10.17226/14639
loading iconLoading stats for Competition Requirements of the Design/Build, Construction Manager at Risk, and Public-Private Partnership Contracts—Seven Case Studies...