| Copyright © 2010. National Academy of Sciences. All rights reserved. Terms of Use and Privacy Statement |
Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter.
Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.
OCR for page R1
Inspection and Other Strategies for Assuring Quality in Government Construction
INSPECTION AND OTHER STRATEGIES FOR ASSURING QUALITY IN GOVERNMENT CONSTRUCTION
COMMITTEE ON INSPECTION FOR QUALITY CONTROL ON FEDERAL CONSTRUCTION PROJECTS
BUILDING RESEARCH BOARD
COMMISSION ON ENGINEERING AND TECHNICAL SYSTEMS
NATIONAL RESEARCH COUNCIL
William B. Ledbetter
Andrew C. Lemer
Editors
NATIONAL ACADEMY PRESS
Washington, D.C.
1991
OCR for page R2
Inspection and Other Strategies for Assuring Quality in Government Construction
NOTICE: The project that is the subject of this report was approved by the Governing Board of the National Research Council, whose members are drawn from the councils of the National Academy of Sciences, the National Academy of Engineering, and the Institute of Medicine. The members of the committee responsible for the report were chosen for their special competences and with regard for appropriate balance.
This report has been reviewed by a group other than the authors according to procedures approved by a Report Review Committee consisting of members of the National Academy of Sciences, the National Academy of Engineering, and the Institute of Medicine.
The National Academy of Sciences is a private, nonprofit, self-perpetuating society of distinguished scholars engaged in scientific and engineering research, dedicated to the furtherance of science and technology and to their use for the general welfare. Upon the authority of the charter granted to it by the Congress in 1863, the Academy has a mandate that requires it to advise the federal government on scientific and technical matters. Dr. Frank Press is president of the National Academy of Sciences.
The National Academy of Engineering was established in 1964, under the charter of the National Academy of Sciences, as a parallel organization of outstanding engineers. It is autonomous in its administration and in the selection of its members, sharing with the National Academy of Sciences the responsibility for advising the federal government. The National Academy of Engineering also sponsors engineering programs aimed at meeting national needs, encourages education and research, and recognizes the superior achievements of engineers. Dr. Robert M. White is president of the National Academy of Engineering.
The Institute of Medicine was established in 1970 by the National Academy of Sciences to secure the services of eminent members of appropriate professions in the examination of policy matters pertaining to the health of the public. The Institute acts under the responsibility given to the National Academy of Sciences by its congressional charter to be an adviser to the federal government, and upon its own initiative, to identify issues of medical care, research, and education. Dr. Samuel O. Thier is president of the Institute of Medicine.
The National Research Council was established by the National Academy of Sciences in 1916 to associate the broad community of science and technology with the Academy's purposes of furthering knowledge and of advising the federal government. Functioning in accordance with general policies determined by the Academy, the Council has become the principal operating agency of both the National Academy of Sciences and the National Academy of Engineering in providing services to the government, the public, and the scientific and engineering communities. The Council is administered jointly by both Academies and the Institute of Medicine. Dr. Frank Press and Dr. Robert M. White are chairman and vice chairman, respectively, of the National Research Council.
This report was prepared as part of the technical program of the Federal Construction Council (FCC). The FCC is a continuing activity of the Building Research Board, which is a unit of the Commission on Engineering and Technical Systems of the National Research Council. The purpose of the FCC is to promote cooperation among federal construction agencies and between such agencies and other elements of the building community in addressing technical issues of mutual concern. The FCC program is supported by 14 federal agencies: the Department of the Air Force, the Department of the Army, the Department of Commerce, the Department of Energy, the Department of the Navy, the Department of State, the General Services Administration, the National Aeronautics and Space Administration, the National Endowment for the Arts, the National Science Foundation, the U.S. Postal Service, the U.S. Public Health Service, the Smithsonian Institution, and the Department of Veterans Affairs.
Funding for the FCC program was provided through the following agreements between the indicated federal agency and the National Academy of Sciences: Department of State Contract No. 1030-621218; National Science Foundation Grant No. MSM-8902669, under master agreement 8618641; and U.S. Postal Service grant, unnumbered.
Library of Congress Catalog Card No. 91-62333
International Standard Book Number 0-309-04547-9
Additional copies of this report are available from:
National Academy Press
2101 Constitution Avenue, NW Washington, DC 20418
S 409
Printed in the United States of America
OCR for page R3
Inspection and Other Strategies for Assuring Quality in Government Construction
COMMITTEE ON INSPECTION FOR QUALITY CONTROL ON FEDERAL CONSTRUCTION PROJECTS
Chairman
WILLIAM B. LEDBETTER, PE, Consultant,
Pendleton, S.C.
Members
MERRILL R. COTTEN, Chief,
Construction Management, De Leuw, Cather & Company, Chicago, Illinois
F. H. (BUD) GRIFFIS, Professor of Civil Engineering,
Columbia University, New York, New York
C. RAYMOND HAYS, Director Safety/Quality,
RUST International, Birmingham, Alabama
ARTHUR T. KORNBLUT,
Kornblut & Sokolove, Cheve Chase, Maryland
JOHN W. MORRIS, USA Retired, Engineer Advisor,
Zorc, Rissetto, Weaver & Rosen, Washington, D.C.
DONALD W. PFEIFER, Vice President,
Wiss, Janney, Elstner Associates, Northbrook, Illinois
ROBERT ULREY, Manager of Technical Services,
Houston Lighting and Power Company, Houston, Texas
DAVID J. WICKERSHEIMER, President,
Wickersheimer Engineers, Inc., Champaign, Illinois
PAUL ZIA, Distinguished University Professor,
Civil Engineering Department, North Carolina State University, Raleigh
OCR for page R4
Inspection and Other Strategies for Assuring Quality in Government Construction
Federal Construction Counsil Liaison Representatives
KNOX BURCHETT,
Office of Foreign Building Operations, Department of State
WILLIAM DUNCAN, P.E.,
Division of Health Facilities Planning, Public Health Service
JAMES D. DURHAM,
Office of Environmental Health and Engineering, Indian Health Service
ROBERT EIDSON,
Office of Facilities, Department of Veterans Affairs
IRVIN HAMBURGER, P.E./C.P.E.,
Office of the Air Force Civil Engineer
JAMES R. JONES, Directorate of Military Programs,
U.S. Army Corps of Engineers
WILLIAM J. KEHEW, P.E.,
Chicago Operations Office, U.S. Department of Energy
ALEX LINCOLN,
Public Buildings Service, General Services Administration
MIGUEL LOPEZ,
Naval Facilities Engineering Command, Department of the Navy
WILLIAM POUNDS,
Office of Foreign Buildings Operations, Department of State
Public Facilities Council Liaison Representatives
ROBERT KELLER,
Division of Design and Construction, Office of Administration, State of Missouri
FRANCIS W. KUCHTA,
Department of General Services, State of Maryland
Project Staff
ANDREW C. LEMER, Director
PETER H. SMEALLIE, Senior Program Officer
PATRICIA M. WHOLEY, Staff Associate
SUZETTE CODY, Project Assistant
JOANN V. CURRY, Senior Secretary
OCR for page R5
Inspection and Other Strategies for Assuring Quality in Government Construction
BUILDING RESEARCH BOARD (1990–1991)
Chairman
RICHARD T. BAUM, (Retired) Partner,
Jaros, Baum and Bolles, New York, New York
Members
LYNN S. BEEDLE, University Distinguished Professor of Civil Engineering and Director,
Institute for the Study of High-Rise Habitat, Lehigh University, Bethlehem, Pennsylvania
GERALD L. CARLISLE, Secretary-Treasurer,
International Union of Bricklayers & Allied Craftsmen, Washington, D.C.
NANCY RUTLEDGE CONNERY, Consultant,
Woolwich, Maine
C. CHRISTOPHER DEGENHARDT, President,
EDAW, Inc., San Francisco, California
ELISHA C. FREEDMAN, Regional Manager,
The Par-Group—Paul A. Reaume, Ltd., and
Executive-in-Residence,
University of Hartford, Connecticut
DONALD G. ISELIN, USN, Retired, Consultant,
Santa Barbara, California
FREDERICK KRIMGOLD, Associate Dean for Research and Extension,
Virginia Polytechnic Institute and State University, Alexandria, Virginia
J. W. MORRIS, USA Retired, Engineer Advisor,
Zorc, Rissetto, Weaver & Rosen, Washington, D.C.
OCR for page R6
Inspection and Other Strategies for Assuring Quality in Government Construction
HAROLD J. PARMELEE, President,
Turner Construction Company, New York, New York
LESLIE E. ROBERTSON, Director,
Design and Construction, Leslie E. Robertson Associates, New York, New York
JAMES E. WOODS, William E. Jamerson Professor of Building Construction,
College of Architecture and Urban Studies, Virginia Polytechnic Institute and State University, Blacksburg, Virginia
APRIL L. YOUNG, CRA Coordinator,
First American Metro Corporation, McLean, Virginia
Staff
ANDREW C. LEMER, Director
HENRY A. BORGER, Executive Secretary,
Federal Construction Council
PETER H. SMEALLIE, Senior Program Officer (to June 1990)
PATRICIA M. WHOLEY, Staff Associate
SUZETTE CODY, Project Assistant
JOANN V. CURRY, Senior Secretary
LENA B. GRAYSON, Program Assistant
OCR for page R7
Inspection and Other Strategies for Assuring Quality in Government Construction
PREFACE
Quality is not an act. It is a habit.
Aristotle
Much has been said and written in recent years about the nation's declining commitment to the principles of quality that marked our rise as the world's leading industrial power and about our need as a nation to renew that commitment. President Bush has stated that ". . . our work to build quality products will be a crucial link to the long-term success of the United States in the global marketplace."
The U. S. construction industry has not been immune to the problem. Our share of world construction markets has shrunk. Foreign competitors are gaining increasing strength in our domestic markets. Many people in the industry point to quality—in our materials and equipment, our design and workmanship, in the private and public sectors—as significant causes.
OCR for page R8
Inspection and Other Strategies for Assuring Quality in Government Construction
When the agencies of the Federal Construction Council requested the Building Research Board to advise them on construction inspection practices that would help to improve the quality of their constructed facilities, they referred only to the tip of this massive iceberg of a problem confronting the entire industry. We and the committee invited to provide this advice found it difficult to restrict our attention to this one small aspect of the major challenge of moving the industry back to building quality facilities.
However, we recognize that habits are persistent and, once formed badly, can be changed only through constant attention and perseverance. Inspection is an important and long-accepted means to achieving quality and one that is well suited to the task of changing bad habits. We hope that our work and this report will contribute to a change in habits and thereby to the broader goals of quality to which we all must aspire.
William B. Ledbetter, Chairman
Committee on Inspection for Quality Control on Federal Construction Projects
Andrew C. Lemer, Director
Building Research Board
OCR for page R9
Inspection and Other Strategies for Assuring Quality in Government Construction
EXECUTIVE SUMMARY
Quality facilities enhance the safety, productivity, and environment of the people and economic activities they serve, and are achieved through a process of planning, design, construction, operation, and maintenance that must work effectively at all stages. In construction, quality is obtained through conformance to adequately developed requirements, requirements clearly stated to set forth the characteristics which the constructed facility must have to serve its users well.
An essential precondition for assuring construction quality is getting the requirements right and stating them clearly and accurately in the drawings and specifications to be followed by the constructor. Construction costs that exceed design estimates are an important indicator of failure to achieve quality. If the requirements are right and the estimating effective, then cost growth is attributed to construction problems, but in practice the growth is largely attributable to design inadequacies. However, achieving quality in construction remains a substantial
OCR for page R10
Inspection and Other Strategies for Assuring Quality in Government Construction
challenge after planning and design have produced an appropriate and clear statement of requirements.
The constructor has a responsibility to control quality and conform to requirements by managing labor, equipment, and materials to produce a facility that meets these requirements. The purchasers of construction—the owner and users of the facility—seek to assure that quality by participating in the monitoring of the constructor's quality control activities. Inspection—the specific examination, testing, and overall appraisal of a process, product or service to ascertain if it conforms to established requirements—is an essential tool for construction quality control and assurance.
Federal agencies follow a variety of practices in using inspection to assure quality. Some agencies assign inspection responsibilities to their own staff. Others depend on the design architect or engineer or an independent firm to conduct inspection. Some agencies rely almost entirely on the constructor's quality control system and conduct few inspections of their own. All of these various practices have produced comparable and generally adequate construction quality, but the U. S. Army Corps of Engineers' contractor evaluation procedures are exemplary. In general, quality could be improved by reducing this unnecessary variety in practices, by making inspection more efficient, and by avoiding specific practices that foster conflict among owners, designers, and constructors.
The U. S. construction industry and its customers have much to gain from the growing interest in teamwork and long term commitment to quality reflected in the philosophy and practices presented under such titles as Total Quality Management. Owners and users working to enhance their assurance of quality in construction should act within the context of this philosophy and practice. Federal agencies in particular can enhance the quality of their construction by taking action on the following recommendations:
Work to improve the agency's ability to develop quality definitions, facility programs, plans, budgets, guide criteria,
OCR for page R11
Inspection and Other Strategies for Assuring Quality in Government Construction
design drawings, and specifications that convey correct requirements in a clear manner to the constructor.
Avoid adversarial design and construction management practices and adopt defined programs to foster teamwork among users, design and construction managers, designers, and constructors.
Assure that drawings and specifications are complete, clear, and consistent.
Avoid overly frequent or detailed inspections that do not contribute directly to assuring final quality.
Join with other agencies in specific programs to share information and centralize selected inspection activities, for example by participating in the Army's Construction Contractor Appraisal Support System.
Work with designers and users to develop integrated inspection plans for all construction projects, and then with constructors to assure that the plans are effectively executed.
Fund research and demonstration activities required to develop new inspection and other quality assurance technologies.
Adopt systems to measure explicitly the agency's quality management efforts and to relate those efforts to the costs of replacement and repair of faulty construction or of productivity lost through acceptance of faulty construction.
Assert, at senior administrative levels, each agency's commitment to quality in its constructed facilities and establish definite programs for making the commitment effective and lasting.
OCR for page R12
Inspection and Other Strategies for Assuring Quality in Government Construction
This page in the original is blank.
OCR for page R13
Inspection and Other Strategies for Assuring Quality in Government Construction
CONTENTS
1.
Introduction
1
Scope of the Committee's Deliberations
3
Organization of the Report
5
2.
Quality and Practices for Its Assurance
7
Defining Construction Quality, Assurance, and Control
8
Inspection for Quality Control and Assurance
10
The Federal Acquisition Regulations
11
Agency Quality Management Practices
13
Factors That Influence Agency Practices
16
Perspectives from Private Sector Quality Management Practices
19
Legal Distinctions Between Federal and Private Practices
23
Committee Assessment of Agency Practices
25
OCR for page R14
Inspection and Other Strategies for Assuring Quality in Government Construction
3.
Extensions and Alternatives to Inspection
27
Total Quality Management in Construction
27
Teamwork and Quality
29
Contractor Performance Evaluation
30
Bidder Pre-Qualification
31
Incentive Contracting
32
Integrated Inspection Plans
32
Cost and Schedule Protection Plans
33
New Technology for Inspection
35
Quality Measurement Systems
36
4.
Conclusions and Recommendations
39
Getting Quality in Federal Facilities Construction
39
The Designer's Role
40
The Role of Inspection
41
Coordinated Agency Quality Management Programs
41
Effective Inspection
42
Quality Measurement Systems
42
Effective Quality Management
43
Assuring Quality in Construction
43
APPENDIXES
A
Biographical Sketches of Committee Members and Staff
45
B
Glossary of Terms Related to Construction Quality
51
C
Federal Acquisition Regulation and Construction
55
D
Total Quality Management
57
E
Quality Performance Measurement
61
OCR for page R15
Inspection and Other Strategies for Assuring Quality in Government Construction
INSPECTION AND OTHER STRATEGIES FOR ASSURING QUALITY IN GOVERNMENT CONSTRUCTION
OCR for page R16
Inspection and Other Strategies for Assuring Quality in Government Construction
This page in the original is blank.