| Copyright © 2009. National Academy of Sciences. All rights reserved. Terms of Use and Privacy Statement |
Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter.
Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.
OCR for page 66
66
NOTES ON TEXT
Chapter 1
1. For a summary of the legislation concerning-the FTS see:
September 19, 1975, "Authority for' Communication Activity," Project
LX-100, Office of General Counsel, General Services Administration
2. Quoted in Public Utilities Fortnightly, April 1963. ?
3. Access Lines, Switches, and Circuits: Telecommunications
networks (phone networks in the days before data transmission) consist
of three main types of components: access lines, which are electrical
connections from the building to the local phone company's office;
switches, which route calls according to the number dialed; and
long-distance electrical connections between the switches. All these
electrical connections are usually-termed circuits (they go to and from
a pair of locations). Hence, access lines are circuits but are usually
termed access lines. The long-distance electrical connections are
usually termed intermachine circuits or network trunks. There are many
other kinds of circuits giving access to other services or locations,
but these terms should be sufficient to give an understanding of the
text. - - -
4. AT&T Long Lines Department, 1966. Federal Telecommunications
System: Network Plan 1965-1971. Washington, D.C.:- AT&T. - ' '
5. Growth and size of the FTS: Figure 1-1 shows the growth in call
minutes from inception of the system in 1963 to 1988. There was
constant demand driven growth until escalating costs forced agencies
who could to leave the system beginning in 1984. The U.S. Postal ~
Service was first, and then in the subsequent years the departments of
the Army and Navy and the U.S. Army Corps of Engineers left.
Figure 1-2 shows the annual cost over the same period of time. The
major increase due to the'demise in 1981 of the Telpak tariffs is
clearly seen. This event marked the beginning of the end of 'tine ' old
FTS. ' '
Figure 1-3 shows the resultant cost-per-minute average for the
system. During the stable decades of the 1960s and 1970s, the average
cost per minute was about half that available on the public system
saving approximately $1.25 billion during the 1970s alone. The
increase due to Telpak in 1981 is clearly seen. Cost cutting
maintained the new level for a while, but then access charge increases
after divestiture (plus adverse impacts on economies of scale as
agencies left the system) caused a constant upward trend in the cost
per minute. This continues to the projected time of transition to
FTS2000 shown beginning in 1989.
6. See Chapter 5, Networks, in the main report for more detail of
deregulation.
7. Cut FTS costs through competition: In 1982 Administrator Carmen
formed a private sector task force to examine the FTS and-GSA's
management of it. The task force included the senior
telecommunications managers from Westinghouse Electric Corporation,
OCR for page 67
67
1 600
1400
1 200
1000
z
J
800
600
400
200
~ .
.
/
1962 1964 1966 1968 1970 1-972 1974 1976 1978 1-980 1982 1984 1986 1988
,. ..
FISCAL YEAR
FIGURE 1-1 -Growth of'the FTS recall minutes'. SOURCE: Information
Resources Management Servic'e', General Servic-es Administration, internal
presentation materials, 1987. '
OCR for page 68
68
500
450
400
350
300
250
200
150
100
50
r
~_,
/
/
/
l
O ~ , ., . , . , , , , , , i, . . . .
1962 1964 1966 1968 1970 1972 1974 1976 1978 1980 1982 1984 1986 1988
FISCAL YEAR
FIGURE I-2 Annual cost of the FTS. SOURCE: Information Resources
Management- Service, General Services Administration, internal presentation
materials, 1987.
OCR for page 69
69
it,
40
35
30
Z~ 25
cn
By
llJ
10
20
5
O ~ . ,1 , l, ,,1 1. I I I
1963 196S 1967 1969 1971 1973 1975 1977 1979 1981 1983 1985 1987 1989 1991
/- /
l
J
FISCAL YEAR
FIGURE 1 3 Cost per minute averages for the FTS. SOURCE: Information
Resources Management Service, General Services Administration, internal
presentation materials, 1987.
OCR for page 70
' 70
General Electric, Sears and Roebuck, Xerox Corporation, and North
American Philips. All of these companies had been users of large
private AT&T supplied networks similar to (though much smaller than)
the FTS. Each company was pursuing strategies to cut costs and take
advantage of deregulation and growing competition GSA was able to '
share information with them, and through them, share information with
other corporations such as General Motors. The strategies followed
varied considerably, for example, Westinghouse and General Electric
built on their engineering strength to engineer new networks; Sears had
not chosen the engineering route but had moved to service pricing
provided by Satellite Business Systems; and General Motors bought EDS
to be its resource to develop a new network future. The only common
thread was one of building upon the organization's strengths in a time
of great uncertainty. ' ; ~
8. Satellite communications to Denver and''Hous ton: In:September
1982, GSA's Network Services organization began cutting over satellite
circuits to Denver. In September, user complaints reported to the GSA
Denver region went from an average of 5 a month to 172. The problem
did not surface at headquarters until late October.
From a network management perspective, the problem was one of
determining which vendor was responsible for the failed component so
GSA could get them to fix it. The telecommunications chain from
Washington,'D.C.,'to Denver was' a complex'one with at least five
different vendor organizations involved, and diagnosis of a single
cause of the problem was difficult.
Of the several vendors in'the chain, GSA focused' on RCA the
satellite vendor As the're'sponsible party' on the basis that tine' system
had worked until their circuits were implemented and, ruling out ' '
sabotage, it had to be some effect of integrating their plant. Major
escalation took place with RCA in the week before Christmas 1982. An
examination of the business arrangements, which were standard public
tariffs--the only arrangement available--gave full benefit of '
protection to the vendor rather than the user. GSA therefore had
little leverage over the vendor. It became obvious that all the
resources RCA could muster were already working on the problem. In
essence, GSA's problem was stretching the ability of a major
corporation.
In retrospect, this was typical of the time, with major companies
extending into new areas, using untried technology, and doing so in an
industry that was undergoing major organizational upheavals.
9. Relationships with AT&T: Although RCA had the main
responsibility for the Denver difficulties, their facilities were not
the only problem. The Bell system switch in Denver provided by the
local company was a problem and contributed to the difficulties of
diagnosis. GSA came out of the Denver exercise with two
thoughts--first, that RCA had really done its best and done so
willingly, and second, that AT&T, the largest single supplier in the
network, with GSA representing its largest single customer nationwide,
had done little to help. Before Denver was properly resolved, an
equally severe degradation of service to and from Houston took place.
OCR for page 71
71
It looked as if the network was falling apart and GSA was in a position
of not knowing what was going to happen next. Frustration on GSA's
part led to the letter in Figure 1-4. AT&T reacted swiftly, assigning
substantial resources to solve the problems and a new team to deal with
GSA. This event is important as it foreshadowed later activities.
10. GSA is not a cabinet agency and is headed by an administrator
who is a political appointee reporting to the White House. GSA is
divided into several separate services each headed by a commissioner,
who is also a political appointee. Other management roles in the
services are usually filled with permanent civil servants. The three
major services are the Public Building Service ((PBS), the government's
landlord; the Federal Supply Service (FSS), the government's supplies
buyer; and the Information Resources Management Service (IRMS), the
government's computer and telecommunications manager. IRMS has several
operations headed by deputy commissioners, the largest of which is the
Office of Telecommunications Services, which is responsible for
long-distance and local telecommunications services and management of
the FTS. Within that office, the Network Services organization is
responsible for engineering and operating the long-distance service of
the FTS.
11. The Advanced Record System (ARS): The ARS project provided a
learning situation about the strengths and weaknesses of the FTS
organization. The ARS was an old, out-of-date message system for text
messages operated by GSA. It was used mainly for the Social Security
Administration, the Veterans Administration, and GSA's own Federal
Supply Service. It was a slow-speed, store-and-forward system serving
about 400 locations. It had been a sole source contract with Western
Union in the monopolistic days of telecommunications and the project to
competitively replace the system had been under way since 1977. The
replacement strategy suffered from many problems including: split
procurements leaving GSA with integration responsibility yet no
experience in that sphere, little GSA infrastructure or experience in
project management and engineering, and a specification keying payments
to delivered components rather than to working systems. The contract
with the terminal vendor was eventually terminated and the whole system
transferred to the Veterans Administration who successfully implemented
it. The system became the basis for their VADATS system.
12. The Telecommunications plan of GSA: See Office of Information
Resources Management, 1985, "The Telecommunications Program Plan of the
GSA--Volumes I, II, and III," Washington, D.C.: U.S. General Services
Administration.
13. This first support contract was called the SETAMS I
contract--Systems Engineering, Technical Assistance, and Management
Services: Phase One--and was awarded to Telesynetics Corporation.
14. For more information on the interim cost and quality control
initiatives, see internal GSA document, 1986, "Presentation to FTS2000
Interagency Steering Committee on Cost and Quality Control Programs,"
Office of Telecommunications Services, General Services Administration.
OCR for page 72
72
~~ Administration
Cff'ce of
Information Resources
Management Washington. DC 20405
AUG 19 1983
Mr. Robert E. Grad le
Vice President, Government Communications
American Telephone ant Telegraph Company
1120 20th Street, NW
Washington, DC 20036
Dea r M - e:
Thank you for your prompt reply to my letter. Bowever, I must tell you
in all frankness I do not feel at all comfortable with your response.
Bob, you do not seem to be Informed of the severity of the situation ant,
hence, are not on top of it. For example, you stated at the start of
your letter that "the Bell provided services and equipment have been
completely tested during June and July.- Yet, in only two hours of
testing from Congressman Pauls' office Ire Washington on August 4, 28
bad/weak lines had been identified and all were in the same access group-
GP 63307-001 through 28. I need not point out to you that the GP
indicates Bell system circuits.
You go on to state that, Since March of this year, the Houston CCSA has
been under the supervision of Long Lines" and that the service
maintenance of the switch at Houston is well within the Bell System
performance limits. I do not know whether I should be comforted or
alarmed since you then any that "there is no history of service af fecting
troubles. The fact is that the Houston CCSA and the Denver CCSA have
historically been the two worst actors on the FTS. This sounta like the
same run around your staff gave us for many months on your Denver switch
saying there were no problems. Only our pressure brought you to
acknowledge the management deficiency and to bring in another manager
f ram Phoenix.
The truth is your people are not informed or cooperative, their attitudes
lying somewhere between disinterest and arrogant adherence to
bureaucratic procedure. This is somehow summed up by your trouble desk
in Houston as recently as two weeks ago telling our regional staff to "go
and get f et" when requesting tracing of a held line; and by your
Houston staff refusing to respond to any request without say so from your
Mr. Iloake. Mr. Boake' a constant, arrogant stance at the monthly meetings
that he is right and our concerns are of no consequence give us no
confidence in this organization. IS this regard, however, he only
reflects the general attitude of all ATST staff at the meeting. You
should be aware that this kind of behaviour is peculiar to ATST and we
receive great cooperation from all of our other vendors.
From an organizational point of view, just who is it in AT&T whose job is
in jeopardy if Satisfactory FTS service to Bouaton is not restored? It
doesn't seem to be Mike Becnel or Ken Masters. They, in fact, are less
informed about the details of what is occurring in Houston than I am.
Your people In Houston don't understand the urgency, your people in D. C.
don't know what's going on, and your technical ant operations people
reflect unconcern or an attitude of drawing lines and to hell with the
customer.
By way of conclusion, Bob, I suggest you get personally informed and
involved or 50 percent of your livelihood is going to walk away, as I
have no intention of moving into the future FTS with companies that will
not cooperate, are incapable of providing proper service, arid who ignore
the legitimate concerns of major clients. Be assured this will not stop
here .
Sincerely,
FRANK J. CARR
Assistant Administrator
FIGURE 1-4 Letter from Carr, GSA, to Gradle, AT&T, August 19, 1983
.
OCR for page 73
73
Chapter 2
1. System life cycle: Slavish adherence to the classical system
life cycle probably holds back more innovative efforts than any other
procedural aspect of engineering. People forget that the life cycle
(e.g., feasibility study, requirements study, preliminary design,
detailed design) was invented as a convenient way of segmenting the
continuous development process so that it could be more easily
managed. In many ways the model is erroneous as the milestones
described are entirely artificial and, as it was developed in the 1960s
when activity was devoted to building new systems from scratch, it
presents a limited viewpoint.
The life cycle is weak in dealing with the most difficult and
costly aspects of systems--their maintenance and replacement. Today
most activities involve some measure of replacing systems, and these
systems are entirely insinuated throughout the fabric of day-to-day
operation of important organizations. Unfortunately, although the
classical life cycle does not deal well with these situations, it has
been institutionalized into Good management" processes and has been
reflected in procurement methods and regulations. Because of this it
can become a barrier to innovation by forcing rigorous, though
irrelevant, structure on new problems. Such was the case in point.
2. Shutting down or transition to a network: Almost every issue
that arises on the FTS is complicated by the unique size of the system
and has to be examined for its own peculiar attributes. Shutting down
or transition to a network is such an example. Figure 2-1 shows
conceptually the economic dynamics of the FTS with the average cost of
a minute of calling rising sharply as the volume goes down (later
modeling showed this to occur at approximately 40 percent of the
volume). One curve shows taking traffic off and not downsizing the
network, the second shows an orderly reduction of traffic with
carefully planned downsizing to minimize cost. The FTS was operating
at 1.5 billion call minutes, that is, at an average of 30 cents/minute.
Figure 2-2 shows that as a major user leaves the network the cost
per minute goes up for the remaining users and that, in fact, the U.S.
Postal Service pull out cost the remaining users $4 million a year.
This principle would extend as the traffic reduces, giving increasingly
poor costs per unit as the economy of scale disappeared.
Figure 2-3 shows that the area above the average cost per minute at
the current operating point is a real cost to be borne by the users as
the system shuts down. As Figure 2-4 and 2-5 show, users can either
pay for it inequitably with the first agency off paying least, then the
last off paying most (the so-called $5 million per minute phone call),
or equitably by levying an equal portion of the total amount on all
users irrespective of when they leave. Inequitable shutdown would of
course cause disruption and inequities in the rush to get off the
system as early as possible, which would mean that any chances of
minimizing the total cost would be out of the question.
There are other aspects of shutting down the network. For example,
if each user was allowed to determine when it left, the organization
OCR for page 74
74
180
160
140
120
100
80
60
40
20
o
\
\
\
\
\ \No Downsizing
Downsizing
-
, 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
0 0.2 0.4 0.6 0.8 1.0 1.2 1.4
CALL MINUTES (Billions/Year)
FIGURE 2-1 The economic dynamics of the old FTS: Its shutdown curves.
SOURCE: Information Resources Management Service, General Services
Administration, internal presentation materials, 1986.
OCR for page 75
75
180
160
140
120
100
80
6Q
40
20
a
~ :
I~llilIiI+'IIi--
Q 0.2 0.4 0.6 08 1.0 1.2 1~4
C^1L ~INUlES ~ ~~ ~
U.S. Postal
Serge
U.S. Postal Seance = $4.0 minion
FIGURE 232 As a major user leaves, the average cost per minute goes up
SOURCE: Information Resources Management Service, General Services
Administration, internal presentation materials, 1987.
OCR for page 76
76
180
160
140
~1~ 1 20
z 100
-
cn
it 80
to
60
4~
O-
~ 1 1 1 1 1 1 1 1 1 1 1
0 0.2 0.4 0.6 0.8 1.0 1.2 1.4
CALL MINUTES (Billions/Year)
FIGURE 2-3 The difference is a real cost borne by the users. SOURCE:
Information Resources Management Service, General Services Administration,
internal presentation materials, 1987.
OCR for page 84
84
(1~ Services
MAY 10 t984
Honorable David A. Stockman
Director
Office of Management and Budget
Washington, D.C. 20503
Dear Mr. Stockman:
Washington, DC 20405
I would like to bring to your attention a matter that is causing apprehension in this
agency. Recently, Mrs. Homer's office published a notice in the Federal Register
relating to individual agencies' procurements of long distance telecommunications
services. As the attached correspondence indicates, GSA has serious reservations
that the course of action outlined in the notice win best serve the overall
government-wide interests of the Federal Government, or is appropriate in light of
this agency's responsibilities.
During the OMB budget review, GSA objected strenuously to the proposed plan of
action. ~ Light of the potential disruption to agencies' future plans for
communications services, we believe it is incumbent upon the proposers of the plan
to adequately justify this course of action.
Under the circumstances, ~ wanted you to be aware of our concerns in this matter.
^Ily,1
1~7
Ray/~1ine - ~ .
AcUng Admit
Enclosures
cc: Mrs. Constance Homer
FIGURE 4- 2
Letter from Kline, GSA, to Stoc~nan, OMB, May 10, 1984.
OCR for page 85
85
Electric Corporation.
7. See letter from Selwyn, ETI, and Vivian, Kalba Bowen, to
Hubbard, GSA, May 30, 1986.
8. Ensuring ongoing competition: GSA management believed that
centralized monopoly was bad. It had been bad, but inevitable, priorto
deregulation. However, to continue the monopoly in a deregulated world
where there now was sufficient competition appeared to make little
sense. Consequently, GSA relied on a model whereby it would be one
possible provider of telecommunications (through FTS2000) to agencies
in competition with the rest of the common-carrier industry. Hence
agencies were to be given free choice about participation in the
contract.
FIRMR Bulletin 29, Changes to Federal Telecommunications System
(FTS) Inter-City Services--Advanced Notification and Request For
Comments, October 15, 1985, was developed to relay this process and to
notify all agencies using the old system of the intention to transition
to FTS2000. It offered them the opportunity to take part or go their
own way. Those that did not wish to subscribe--Army and Navy
mainly--were moved off the system with costs assessed to avoid harm to
the remaining agencies. The remaining agencies all signed up for the
new service voluntarily. A draft agreement for service was developed
by GSA and the steering committee (Service Agreement for FTS2000
Services-Draft FIRMR Bulletin, April 28, 1987~. This approach was
later terminated by Rep. Brooks-.
One major benefit seen to allowing voluntary participation was that
there would be no cause for discord between parties during the upcoming
transition, which would be difficult enough even with everyone on the
same team.
9. For communications between OMB and GSA leading up to agreement
see: Letter from Bedell, OMB, to Golden, GSA, June 20, 1986; Letter
from Golden, GSA, to Bedell, OMB, July 30, 1986; Letter from Golden,
GSA, to Gramm, OMB, September 2, 1986; Letter from Gramm, OMB, to
Golden, GSA, September 26, 1986; Letter from Golden, GSA, to Gramm,
OMB, October 30, 1986; Memo from Kowalczyk, GSA, to Golden, GSA,
November 13, 1986; and Letter from Golden, GSA, to Gramm, OMB, December
22, 1986.
10. For the nongovernment reader two books worth reading concerning
politics at large and the government's acquisition process are: Smith,
Hedrick, 1988. The Power Game: How Washington Works. New York: Random
House. A very readable, insider's view of how Washington really works,
who the players are, what motivates them, and how politics has changed
since the 1970s. Fox, Ronald J., 1988. The Defense Management
Challenge: Weapons Acquisition. Boston: Harvard Business School Press.
Though oriented towards defense and weapons systems this is one of the
most complete yet readable reviews of the acquisition process. The
civilian agencies have parallels for everything mentioned in the book.
OCR for page 86
86
Chapter 5
1. Martin-Marietta announcement: Shrage, Michael, 1986, "Marietta
seeks golden federal phone contract," Washington Post, March 24;
Roberts, John L., Janet Guyon, and Francine Schwadel, 1986,
"Martin-Marietta, regional firms to bid against AT&T for big U.S. job,
Wall Street Journal, July 16; Shelsby, Ted, 1986, "Martin bids
for 10-year U.S. pact," The Baltimore Sun, July 16; Time, July
28, 1986, "Ganging up on old Ma Bell."
2. Martin-Marietta and MCI teem up: Washington Post, September
18, 1986, "Martin-Marietta to use MCI in phone bid"; Outerbridge,
Laura, 1986, "Marietta, MCI to bid for federal phone service, n The
Washington Times, September 18.
3. Boeing-AT&T announcement: White, Eileen, 1986, "Boeing venture
will seek U.S. contract for phone system valued at $4.5 billion,"
Call Street Journal, July 25 ; Washington Post, December 10 ,
1986, "AT&T, Boeing join forces on phone contract bid"; The New York
Times, December 10, 1986, "AT&T to join Boeing in bid."
4. The final draft REP released for comment was: Information
Resources Management Service, 1986. FTS2000 Services: A Request for
Proposals to Replace the Federal Telecommunications System (FTS) --
Second Draft, Washington, D.C.: U.S. General Services Administration.
5. National security and emergency preparedness (NSEP): Dealing
with NSEP requirements and the NSEP community presented one of the more
subtle and difficult obstacles to overcome in replacing the network.
There was no doubt that GSA had, as part of its mission, the provision
of telecommunications in times of national emergencies. This in fact
had been a stimulus for developing the FTS in 1962. However, there was
no consensus in written law, regulation, or policy as to what that
mission meant in engineering terms. In fact, GSA's role in emergency
services had lost importance over the decades as other events
transferred some responsibility to other bodies.
Reaching agreement on GSA's role in telecommunications for
emergencies was a difficult situation. The NSEP community is very
fragmented with many interests varying from those of the NCS to the
Federal Emergency Management Administration (FEMA) and the National
Security Council (NSC). Even within the NCS there is fragmentation
among both the agency interests represented and the NCS staff. In the
case of the FTS and its role in NSEP, events were further complicated
by other issues. For example, the SCAN switches in hardened sites were
very expensive, yet if GSA abandoned them the cost of the hardened
sites would probably be borne by the military AUTOVON system.
The way the issue of national security and emergency preparedness
was negotiated and solved could be a case history in itself and one of
the many significant activities undertaken that never received public
attention. Documents of interest are: "Assignment of NSEP
Telecommunications Functions," Executive Order 12472, April 1984;
"Implementing GSA's NSEP and COMSEC Responsibilities in Replacing the
FTS Intercity and Local Services," GSA, 1984; "TaskO005, FTS2000 NSEP
Requirements, Subtasks 1, 2, and 3," Telesynetics for GSA, November,
1985.
OCR for page 87
87
6. The final REP was: Information Resources Management Service,
1986, FTS2000 Services: A Request for Proposals to Replace the Federal
Telecommunications System (FTS), Washington, D.C.: U.S. General
Services Administration.
Chapter 6
1. All of the articles in question were from the Washington
Times as was much of the initial press coverage in this phase. See:
Vickery, Hugh, 1987, "Federal offices to get police state phones,"
Washington Times , January 8; Washington Times , January 9, 1987,
"That you Ivan?"; Vickery, 1987, "Rights panel chairman blasts U.S.
phone plan," Washington Times, January 9.
2. For Army and Navy leaving see Bonafield, Christine, 1987, "U.S.
military branches drop from government's FTS2000 project,"
Communications Week, April 6. For discussion of HHS and Treasury
decisions see Bonafield, 1987, "Treasury chooses FTS2000,"
Communications Week, May 4.
3. Communications Reek, March 21, 1988, "Perspective."
4. A good article describing the views of the financia:
concerning AT&T's need to win FTS2000 is contained in M.J.
June 15 1987, "AT&T Beyond FTS2000," Federal Computer Reek.
5. Wall Street Journal, August 25, 1987, "Ma Bell wants
room to wheel and deal."
6. Gladwell, Malcom, 1987, "Change in U.S. phone contract may hurt
Marietta," Washington Post, November 2.
7. Bonafield, 1987, "Growth a major challenge for one-year-old US
Sprint," Communications Week, June 29.
8. McCloskey, Paul, 1987, "Sprint to join EDS in fed bid," MIS
Week, January 12.
9 . Tel ecommunications Reports , June 15, 1987, "EDS says it will
not bid on FTS2000."
10. Telecommunications Reports, July 13, 1987, "US Sprint will
not bid FTS2000 project."
11. The initial REP stated only, "The ~ ~ ~ ~ _-
of an indefinite quantity fixed price with economic price adjustments
type of contract resulting from this solicitation."
Amendment 1, March 31, 1987, clarified GSA's intentions and created
clause L.7.d as follows:
1 community
Richter,
more
government contemplates award
with economic price adjustments
Each offeror, at the time it submits its offer, must certify that
its proposal does not constitute a common carrier service subject
to the Federal Communications Commission (FCC) Title II regulation,
and shall certify that the offeror is able to enter into a binding
and enforceable fixed price contract not subject to tariff
precedence, tariff revision, or tariff pass throughs.
Alternatively, at the time it submits its offer, an offeror shall
certify that it has filed an application or request with the FCC to
obtain a determination that the offeror's FTS2000 proposal
OCR for page 88
88
represents a non-common carrier service not subject to Title II
regulation, thereby allowing the offeror to enter into a binding
and enforceable fixed price contract not subject to tariff
precedence, tariff revision, or tariff pass throughs.
12. An explanation of AT&T's position and the use of a DCTN type of
tariff is contained in a letter from AT&T to GSA, "Follow-Up to
Submission of Questions, Letter No. 87-06," from Van Atta, AT&T, to
Williams, GSA, May 6, 1987.
13. Previous notes have mentioned the deliberate separation in
government procurements of the contracting function from the
programmatic. Once an REP is issued (and frequently at some point
prior to that), all communication between a vendor and an agency must
be formally through the contracting officer. Failure to do so can
result in a flawed or illegal procurement.
14. Cauley, Leslie, 1987, "AT&T contends U.S. bars it from
bidding, n Washington Times, May 13.
15. General Accounting Office, 1987. Information Management:
Leadership Needed in Managing Federal Telecommunications, Report Number
GAO/IMTEC-87-9. Washington, D.C.: General Accounting Office.
16. Cauley, 1987, "Brooks blasts GSA over phone purchase,"
Washington Times, May 15.
17. The chairman of the Senate Committee on Government Affairs is
Sen. John Glenn (Democrat, Ohio). Discussions by GSA with his chief of
staff concerning the technical and business issues seemed to leave him
neutral concerning the alternatives that were being presented to GSA's
approach. As a result Government Affairs remained neutral, leaving
congressional interests to be represented by Brooks, until later
concerns arose about illegality in contract procedures. During the
protest concerning the award of switches in a procurement outside of
FTS2000, Government Affairs took the leadership role and Government
Operations remained neutral. See Cauley, 1987, "Senate probing GSA
phone contract," Washington Times , July 15; and Bonafield, "Senate
revisits FTS plan," Communications Week, June 20.
18. For a variety of press versions of the same story and a sample
of different perspectives, see Tucker, Elizabeth, 1987, "GSA delays
deadline for phone bids," Washington Post, May 19; Sims, Calvin,
1987, "U.S. delays phone unit bidding," The New York Times, May 19;
Cauley, 1987, "AT&T wins FTS bidding suspension," Washington Times,
May 19.
19. For a good summary of this issue see Tel ecommunications
Reports, June 29, 1987, "FCC urged to address GSA declaratory ruling
request in streamlined regulation docket."
20. For a good summary of this issue and actions see
Telecommunications Reports, June 22, 1987, "AT&T presses earlier
complaint about U.S. West switching services for FTS in Denver."
21. Cauley, 1987, "AT&T accused of going for the jugular,"
Washington Times, July 21.
22. Bonafield, 1987, "AT&T and Regional Bells tangle over words,
deeds and FTS2000," Communications Week, July 27.
OCR for page 89
89
23. One of the best descriptions of various points of views and
submissions on this issue is found in Tel ecommunications Reports,
August 10, 1987, "Responding to AT&T emergency motion. n
24. Cauley, 1987, "Justice says AT&T errs in FTS case",
Washington Times, August 11. See also Killette, Kathleen, 1987,
"Justice supports Martin Marietta in dispute over FTS2000 bidding,"
Communications Seek, August 17.
25 . Washington Post, September 1, 1987, "Judge requests data on
phone bids."
26. Davis, Bob, "Martin Marietta wins court ruling on using Bell
lines," Cal l Street Journal , November 9.
27. Iehnowski, Tom, "Cigar-toting Capitol Hill curmudgeon calls the
tune for FTS2000, n Data Communications, November 1987.
28. For a description of AT&T lobbying activities see Report on
AT&T, October 5, 1987, "Govern~ent-wide, two-vendor contract for
FTS2000 now in the works,n; and Call, Steve, and Judith Havemann, 1987,
"Dispute threatens USA phone contract," Washington Post, July 31.
29. For a description of US Sprint lobbying activities see Davis,
1987, "Texan wants last word on U.S. contract," Cal l Street
Journal, September 4.
30. For the free-marketer theory, see Epstein, Keith C., "Bribery
suspected in U.S. phone contract," Cleveland Plain Dealer, December
4, 1987.
31. Havemann, 1987, "Marietta: don't split phone work," -
Washington Post, August 6.
32. Davis, 1987, "Texan wants last word on U.S. contract," Wall
Street Journal , September 4.
33. The reasons why Sprint and AT&T wanted the contract split and
Martin-Marietta did not are as follows:
A. Sprint's reason: If GSA acceded to Brooks's demands for two
network winners, US Sprint would have time to find a partner and submit
a bid. See Davis and Jeanne Saddler, 1987, "GSA reversal on phone pact
revives bidding chances for EDS, US Sprint," Call Street Journal ,
September 28, which says "Sprint, which started as a Dallas based
company, has been lobbying Rep. Brooks to get back into the bidding
even before it formally withdrew."
B. AT&T's reason: One view was that AT&T had resigned itself to
Rep. Brooks prevailing and now supported his views. This would be
undeniably a practical viewpoint, but also AT&T was concerned with
public image in Washington and wanted to be seen to be favoring
competition. In separate proceedings with AT&T at that time, the FCC
was proposing to scrap rate-of-return regulation and AT&T wanted that
to happen badly. Because of this, they did not want to have adverse
opinion building up in Congress. A third reason, entirely practical,
was that with a split they would almost certainly get some of the
business, with the opportunity to make it up later, in later
competition with the FTS2000 contracts. Relevant quotes are: AT&T
"brought out the guns . . . shipped in liaison specialists from the
home states of several congressmen to help drive home the company's
OCR for page 90
go
message. n And, "AT&T has also been lobbying fiercely against the
original winner-take-all proposal. AT&T has been considering
petitioning a GSA hearing Board to suspend the bid if the agency didn't
change its plans." As well as, "William Rich . . . said AT&T wanted to
delay the bid in hopes that the GSA will-eventually scrap it. n For
these quotes see Report on AT&T, October 5, 1987, "Government-wide,
two-vendor contract for FTS2000 now in the works~; Davis and Saddler,
1987, "Reversal on phone pact revives bidding chances for EDS, Sprint,"
Call Street Journal, September 28.
C. Martin-Marietta's reason: Martin-Marietta's reason to oppose the
split was based on the economics of building a network especially to
meet the FTS2000 requirements in a company with no common-carrier
infrastructure. They needed as much traffic as possible to be able to
produce competitive prices against AT&T or Sprint. Two aspects of this
were, first, network economy of scale factors, and, secondly,
implementation overhead. Regarding the former, Figure 6-1 shows actual
cost model of the economy of scale of the FTS traffic. Differences, no
matter how large the network, tail off at about half the total FTS
traffic. At reduced amounts, such as might occur winning only 40
percent and having that reduced in later internal competitions, costs
would be a severe disadvantage. Concerning the second, as a rough
approximation, in networks of this size the cost to set up half a
network is essentially the same as a full one.
34. For a good survey of the various points of view of all parties
on splitting the network see Telecommunications Reports, August 10,
1987, "Brooks advocacy of split contract." For a good survey of the
difference between Brooks' and Golden's positions see Havemann, 1987,
"For phone contractors a busy signal," Washington Post, August 26.
For a good survey of the disagreement between them see Davis, 1987,
"Texan wants last word on U.S. contract," Wall Street Journal,
September 4.
35. Call, Steve, 1987, "GSA delays bidding on phone pact,"
Bus Anus, Washington Post, August 25.
36. After the release of the first GAO report, seven sessions were
held between GSA and GAO between June 16 and July 28, 1987, to cover
later materials that GAO had missed in its audit. These were
documented in: Sessions Conducted By the General Services
Administration for the General Accounting Office Concerning GSA's
Telecommunications Program, IRMS, GSA. The formal reply to the GAO
report was not transmitted until December in a letter from Golden, GSA,
to Bowsher, GAO, December 21, 1987.
As a result of these deliberations, GAO issued a second report,
Information Management: Status of GSA's FTS2000 Procurement,
GAO/IMTEC-87-42, Washington, D.C.: General Accounting Office. This was
released by Sen. Glenn in a press statement on August 25, 1987. For
comments see Sussman, Edward, 1987, "GSA amends plan for federal phone
project," Wall Street Journal , August 25, who saw it as critical of
GSA. The report itself said, "current FTS2000 approach is reasonable
as an interim solution" without specifying how long "interim" was.
Specifically the report recommended, and Glenn reinforced, that GSA
OCR for page 91
91
24
23
22
21
IIJ
by 20
he
, 1 8
19
17
16
15
14
O Standard Tariff
§. · Cost Based
\
- \_
_N
3%
-
10
30
50
TRAFFIC PERCENT
70
90
FIGURE 6-1 FTS2000 networks designs: Unit cost versus volume. SOURCE:
SRA Corporation for General Services Administration, internal modelling
results, 1987
.
OCR for page 92
92
should clarify the government's ability to purchase all or part of the
FTS2000 services from less expensive alternate sources without penalty
after the minimum contractual guarantees are met. In essence, this new
report gave GSA permission to proceed with FTS2000.
37. The following letters are examples of some of the
correspondence from Congress, other than from Brooks, concerning
FTS2000 during the summer of 1987:
Letter Collins (Democrat, Illinois) to Golden, GSA, July,
1987;
Letter Collins, (Democrat, Illinois) to Golden, September 24,
1987;
Letter Dixon, (Democrat, Illinois) to Golden, July 8, 1987;
Letter English, (Democrat, Oklahoma), to Golden, GSA,
September 23, 1987;
Letter Pryor, (Democrat, Arkansas) to Golden, GSA, August 17,
1987; and
· Letter Rose, (Democrat, North Carolina) to Bowsher, GAO,
August 13, 1987.
38. See August 6, 1987, "GSA is urged to change bid proposal for
multibillion dollar U.S. phone pact," Call Street Journal .
39. As mentioned earlier, a withdrawal by a vendor could be serious
leverage for GSA to change their approach. However, Martin-Marietta's
threat to withdraw was seen as hollow as it consistently indicated the
huge investment it had made in the bidding process (hard to walk away
from) and also had no current revenues in the existing system to
fortify it. GSA kept expecting Martin-Marietta to organize effective
counter-lobbying to the lobbying of US Sprint and AT&T since it was a
major company in the defense industry and thus must have had major
lobbying resources. Either its contacts did not wish to take on Brooks
or their FTS2000 program organization was not able to marshal its
corporate resources. There were only a few letters from Congress
generated in its favor. See: Rahill, (Republican, West Virginia) to
Golden, GSA, August 17, 1987; Wirth, (Democrat, Colorado) to Golden,
GSA August 6, 1987.
40. See letter, English (Democrat, Oklahoma) to Golden, GSA,
September 23, 1987; and see Saddler, Jeanne, 1987, "GSA pressured to
clarify plan for phone bids," Wall Street Journal , September 23.
41. GSA was fortunate in already having a contract with a company
to model the existing FTS. This model was already loaded with the most
recent traffic data, thus allowing GSA to get a quick start modeling
different alternatives for splitting up the requirements. Various
criteria were used, such as how much interagency traffic there was (in
order to minimize internetwork traffic) and how many customers shared
office facilities (and so were served by the same local switch,
requiring provision of two sets of access lines).
For a list of agencies in each system see, Miles, J. B., "GSA
OCR for page 93
93
releases draft amendments to FTS2000 plan, n Government Computer
News, January 8, 1988.
42. Martin-Marietta's feeling disadvantaged and Brooks desire to
make the system mandatory were related. As stated above,
Martin-Marietta was adversely affected in terms of ability to price
competitively by breaking up the network. It complained orally to GSA
and told GSA it had visited Brooks to indicate that it could not
compete effectively even with 60 per cent of one million lines and that
it needed Defense Department traffic added to the system as a minimum.
It also requested guarantees. For a summary of how it was impacted see
Gladwell, 1987, Change in U.S. phone contract may hurt Marietta,"
Washington Pos c , November 2.
43. See Davis and Saddler, 1987, "GSA reversal on phone pact
revives bidding chances for EDS, Sprint," Sal l Street Journal ,
September 28; and Menninger, Bonar, "US Sprint, EDS rejoin the fray for
big contract," Washington Business Journal, November 23.
44. See Telecommunications Reports, November 2, 1987, "New REP
due out on Jan. 31. n
45. As described earlier under the section entitled "The Importance
of Winning" and as described above, the split had met many AT&T goals
and weakened its most obvious competitor, Martin-Marietta.
46. Foley, John, "GSA awards switching contracts to Bells and AT&T
while it thinks about FTS2000," Communications Week, October 26.
47. Foley, 1987, "AT&T protests GSA award of FTS contracts to
BOCs," Communications Reek, November 9; and Washington Post,
November 20, 1987, "GSA sets stage for probe into phone equipment."
48. Sources of quotes in order, see: Cauley, 1987, "GSA granted
delay in bid protest," Washington Times, November 24; Epstein,
1987, "Bribery suspected in U.S. phone contract," Cleveland Plain
Dealer, December 4; Sims, 1987, "Federal investigators looking into
charges of corruption: U.S. inquiry on phone bids said to look at top
officials, n New York Times, December 14; Cauley, 1988, "High GSA
official vows to use Fifth Amendment," Washington Times , January
15; Davis, 1988, '' . . . Bell Atlantic, BellSouth admitted to getting
secret bidding data," Wall Street Journal , January 19; Rockwell,
Mark, 1988, "GSA contracts: AT&T also obtained confidential info,"
MIS Week, February 8; and Cauley, 1988, "Grand jury to sift
evidence of wrongdoing within GSA," Washington Times, January 20.
49. Hays, Laurie, and Mary Lu Carnevale, 1988, "Battling Bells,"
Hal l Street Journal, March 9 .
50. One of AT&T's objectives was to remove all managers who
participated in the ETN procurement from FTS2000. See Sims, 1988,
"AT&T has doubts about phone project," New York Times, January 25.
51. See Tel ecommunications Reports , February 22, 1988, "With
pointed opening statements by AT&T and GSA counsel, ETN protest trial
commences."
OCR for page 94
94
Chapter 7
1. The material on the source selection plan is taken from April 6,
1988, "Roles and Responsibilities of the FTS2000 Source Selection
Organization," General Services Administration; August 14, 1987,
"FTS2000 Source Selection Plan: Briefing," MITRE Corporation; March 14,
1988, "FTS2000 Procurement Advisory Committee Named by Golden," General
Services Administration, News Release; and April 22, 1988, "Major
Responsibilities of the Source Selection Evaluation Board: Presentation
to the Advisory Committee," General Services Administration. The
section on security is based on Taylor, Robert, March, 1988, "Security
Procedures GSA Project FTS2000" (presentation), McLean, Va.: MITRE
Corporation.
2. AT&T questioning security: Cauley, Leslie, 1988, "AT&T questions
safeguards on bids," Washington Times, April 15;
Telecommunications Reports, April 18, 1988, "AT&T representatives
continuing concern about FTS2000 security procedures."
3. See: Telecommunications Reports, May 2, 1988, "Voluminous
proposals filed by three contenders:"; Brooks, Rep. Jack, April 29,
1988, "FTS2000 Telecommunication Procurement," Washington, D.C.
4. May 7, 1989, Session Fed-03 presentations by AT&T and US Sprint,
Eastern Communications Forum, Washington D.C.
5. See, Davis, Bob, 1988, "U.S. divides huge contract for FTS2000,"
Call Street Journal, December 8; Burgess, John, 1988, "US Sprint,
AT&T win phone deal," Washington Post, December 8;
Telecommunications Reports, December 12, 1988, "AT&T team, US
Sprint sign record contracts for FTS2000 networks"; Jackson, Kelly,
1988, "AT&T, Sprint victors in FTS2000 contest," Communications
Seek, December 12; Rivenbark, Leigh, 1988, "Sprint, AT&T win
FTS2000," Federal Computer Week, December 12; Taff, Anita, 1988,
"AT&T, US Sprint win coveted fed net deal," Network World, December
12.
6. For explanation of the mandatory use issue see: Conference
Report on Public Law 100-202, December 22, 1987, House No. 100-498, p.
1166; Telecommunications Reports, April 11, 1988, "Carlucci tells
Brooks that decision on plans to use FTS2000 network would be
premature"; Federal Register, Vol. 53, No. 146, "Mandatory Federal
Telecommunications System (FTS) 2000 Network."
7. For description of the revealing of prices see: Grimm, Vanessa,
1988, "FTS costs may be kept under wraps,'' Government Computer
News, May 13.
l
Representative terms from entire chapter:
washington times