| Copyright © 2009. National Academy of Sciences. All rights reserved. Terms of Use and Privacy Statement |
Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter.
Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.
OCR for page 73
Appendixes
OCR for page 74
Prepublication Copy—Subject to Further Editorial Correction
Engineering Technology Complex Upgrade (ETCU)
Pro grappling and Engineenng Design (Cant) and Construction (CD-3)
Project Execution Plan
Conceptual Design Report Supplement
Safety Question Review
Categoncal Exclusion Under National Environmental Policy Act (NEPA) Regulations
Risk Analysis / Management Plan
Lawrence Berkeley National Laboratory ABEL)
LBNE Institutional Plan FY 2002-2006
LBNE Research Review
Director's Action Committee Note on Project Management and Integration Officer (PIMO)
LBNE Strategic Facilities Plan, February 2001
Large Hadron Collider (LHC), The neutral beam absorbers (TAN)
Design/Manufacturing Review
EHC Monthly Report, December 2001
Solenoic! Tracker at Relativistic Heavy Ion Collider (RHIC) (STAR) experiment
Risk Assessment Contingency Mode}
Supernova/Acceleration Probe (SNAP)
Mission Definition and Requirements
SNAP Research and Development Plan
SNAP Top-Leve! Science and Systems Requirements
SNAP Optical Telescope Assembly Definition and Requirements
SNAP Spacecraft Bus Evaluation Fonn
SNAP Management Plan
Molecular Foundry
Proposal for Preconceptual Design*
Proposal for Conceptual Design Funds*
Approve Mission Need (CD-0) *
Filed Budget and Schedule*
Infrastructure Projects
Sitewide Water Distnbution Phase
Baseline Change Proposal
Building 77 Rehab, Quarterly Report
LBNE infrastructure projects, PARS List
DOE 4320.2A Capital Asset Management Process Pnontization
DOE Risk-Based Pnonty Model
Building 62 Upgrade, Mission Need Justification
* Updated CD-O and project planning information provided in July.
Appendix C Page 7
OCR for page 75
APPENDIX A
Statement of Task
In response to a congressional directive, the National Research Council has
appointed a committee to review and assess the progress made by the U.S. De-
partment of Energy (DOE) in improving its project management practices. This
study includes evaluation of the implementation of recommendations in the 1999
NRC report Improving Project Management in the Department of Energy. The
principal goal of this effort is to assess DOE's efforts to improve project manage-
ment practices, including: (1) specific changes in organization, management prac-
tices, personnel training, and project reviews and reporting; (2) an assessment of
the progress made in achieving improvement; and (3) the likelihood that im-
provements will be permanent. These tasks will also require development of a
framework for evaluation and performance measures specifically tied to DOE's
project management process.
75
Representative terms from entire chapter:
project management