Report of the Panel on Engineering for Complex Systems
INTRODUCTION
The Engineering for Complex Systems (ECS) pro-
gram is one of three programs under NASA's Pioneer-
ing Revolutionary Technology (PRT) program. The
ECS program, funded at $24 million for FY2002, com-
prises three broad, level 2 projects: System Reasoning
and Risk Management (SRRM); Knowledge Engineer-
ing for Safety and Success (KESS ); and Resilient Sys-
tems and Operations (RSO). The projects are then di-
vided into level 3 elements and, further, into a total of
52 level 4 and level 5 tasks. Program organization and
budget are presented in Table 4-1.
The goal of the ECS program is to "achieve ultra-
high levels of safety and missions success by funda-
mentally advancing NASA's system life-cycle ap-
proach through the infusion of advanced technologies"
(Gawdiak, 2002a). The program's intent is to accom-
plish this goal by addressing areas of need, including
increasing NASA's ability to conduct system and trade-
off analyses and NASA's understanding of organiza-
tional risk and of knowledge acquisition and commu-
nication and improving its system control strategies and
status assessment.
REVIEW PROCESS
The National Research Council's Panel on Engi-
neering for Complex Systems (referred to as the ECS
panel in this report) conducted its review in two phases.
38
TABLE 4-1 Engineering for Complex Systems (ECS)
Program Organization and Budget, FY2002-2003
Budget (million $)
FY2002 FY2003
ECS program, total
Level 2 projects
Knowledge Engineering for
Safety and Success (KESS)
Resilient Systems and
Operations (RSO)
Systems Reasoning and
Risk Management (SRRM)
23.6 27.4
4.9 5.9
1 1.9 13.7
6.8 7.8
SOURCE: Gawdiak (2002b) and Andrucyk (2003~.
The first phase was to gain an understanding of the top-
level objectives of the ECS program as the program
relates to overall NASA needs. This phase was com-
pleted at the first meeting of the ECS panel, June 10-
13, 2002, at NASA Ames Research Center at Moffett
Field, California. The second phase of the review was
aimed at understanding the quality and technical mer-
its of individual tasks being conducted under the aus-
pices of the ECS program. To accomplish this task-
OCR for page 39
PANEL ON ENGINEERING FOR COMPLEX SYSTEMS
level evaluation, the ECS panel gave ECS management
a one-page questionnaire, which the management dis-
tributed to some 52 level 4 and level 5 managers and
principle investigators (PIs). The ECS panel then evalu-
ated the individual tasks, referring to the question-
naires, conducting follow-up site visits, reviewing tech-
nical publications, and talking directly to PIs, as
needed. A copy of the questionnaire can be found in
Appendix E. Subpanels of the main ECS review panel
visited six sites:
Goddard Space Flight Center in Maryland
(June 24, 2002),
Jet Propulsion Lab (JPL) in California (July 1,
2002, and April 17, 2003),
NASA Headquarters in Washington, D.C.
(July 22, 2002),
Glenn Research Center in Ohio (July 23,
2002),
Johnson Space Flight Center in Texas (July 23-
24, 2002), and
Kennedy Space Flight Center in Florida (July
30, 2002~.
The findings and recommendations of the ECS
panel are presented in this chapter. This report section
initially discusses the top-level issues that are relevant
to the ECS program as a whole. Other sections concen-
trate on issues that apply individually to the three
projects within ECS and discuss tasks specific to these
projects. It should be noted that not all tasks within the
ECS program are discussed in this report. If a task is
not discussed, the ECS panel deemed that the effort is
good work and should continue per the current ECS
program plan.
GENERAL OBSERVATIONS
Programmatic Risk Management
The ECS program has been in a state of flux since
the program's formation some 6 months before the start
of this review. At the end of this review process, the
program is still in the early stages of developing a criti-
cal mass a large enough effort to make a difference
within NASA and the external community of re-
search in programmatic risk management with the lim-
ited budget available to it. The programmatic risk man-
agement concept is a comprehensive, probabilistic
process with full development and delineation of un-
39
certainties. For a given operational system, program-
matic risk consists of the probability (with uncertainty
delineated) of achieving each of the following system
requirements:
· System safety (probability of crew survival),
· Reliability (probability of system completing
its designed mission),
Performance (probability of achieving the de-
sign parameters of system performance),
Cost of the program (probability of staying
within the budget), and
Schedule for system delivery (probability of
meeting the schedule).
Such a programmatic risk management concept,
from early design to mission completion, would con-
tribute to the comprehensive programmatic risk man-
agement approach that is under development and being
applied by safety organizations within NASA. Given
the limited resources of the ECS program, it will not be
able to create such a comprehensive plan in the fore-
seeable future. Given the dynamic physical environ-
ments in which NASA operates, and in light of the Mars
robotic exploration failures and the Columbia tragedy,
it is critical for ECS to aggressively contribute to the
development of NASA's programmatic risk as defined
above.
The headquarters group responsible for implement-
ing large-scale safety protocols at NASA is the Office
of Safety and Mission Assurance (Code Q). Code Q
performs research, both in house and by contract, on
the development and application of methods for man-
aging program risk. Code Q also provides guidance to
NASA programs in the application of these methods.
The other groups responsible for safety are located
at the NASA centers. The safety and mission assurance
organizations at the NASA centers assist NASA pro-
grams in the application of programmatic risk technol-
ogy. Improved cooperation between the ECS program
and Code Q in developing and applying risk methods is
strongly encouraged. The panel did see evidence of
varying levels of ECS program involvement at the
NASA centers visited (listed earlier in this chapter).
Finding: NASA has a critical need for a compre-
hensive risk management program that can be
implemented throughout program life cycles. The
ECS program should contribute to the development
and application of such a program for NASA.
OCR for page 40
40
AN ASSESSMENT OF NASA 'S PIONEERING REVOLUTIONARY TECHNOLOGY PROGRAM
Recommendation: In light of the Mars exploration
failures and the Columbia tragedy, the ECS pro-
gram should aggressively contribute to a compre-
hensive programmatic risk management program
that would develop the probability (with uncer-
tainty delineated) of achieving each of the following
system requirements:
System safety (probability of crew survival),
Reliability (probability of system completing
its designed mission),
Performance (probability of achieving the de-
sign parameters of system performance),
Cost of the program (probability of staying
within the budget), and
Schedule for system delivery (probability of
meeting the schedule).
NASA' s efforts to rework the overall ECS program
plan during the course of this review (from June 2002
through April 2003) are appropriate given the
program's central importance to NASA's mission. The
overall ECS effort has the potential to make advances
in complex systems engineering. The ECS program has
succeeded as a role model for NASA by recognizing
the need for and conducting multidisciplinary human
and organization factors research. The goals of the ECS
program are consistent with NASA goals of achieving
safe and reliable systems and missions (Venneri, 2001~.
As such, the mission and work of the ECS program are
critical for NASA.
Finding: The current ECS program, as formulated
and funded, will not by itself develop a comprehen-
sive programmatic risk management program in
the foreseeable future, yet this ECS risk manage-
ment work is important for NASA.
Technical Quality
ECS work in individual tasks is, in general, good.
The ECS program appears to address the right prob-
lems using correct justification (i.e., hypotheses)
through a multidisciplinary research approach. How-
ever, at the start of the review in June 2002, there were
many gaps in the ECS portfolio that weakened the ef-
fectiveness of the program, including the following:
.
.
A need for benchmarks in the ECS program
overall,
Addressing NASA-specific problems in soft-
ware development within Resilient Systems
and Operations (RSO),
Modeling organizational risk under Knowl-
edge Engineering for Safety and Success
(KESS), and
The absence of a coherent roadmap or strategy
for the development of System Reasoning for
Risk Management (SRRM) technology, which
could apply across many NASA programs,
Many, though not all, of these gaps have been ad-
dressed since the start of the review. The remaining
gaps are discussed under the individual projects and in
the section "Challenge Areas."
The tasks have been reasonably distributed among
NASA PIs, academia, and industry, and the balance of
fundamental research versus user-driven research is ap-
propriate, considering the early stage of the ECS pro-
gram. The ECS panel anticipates that the current ECS
program will have small but positive incremental im-
pacts on limited areas or individual missions within
NASA. However, the panel believes that more funda-
mental research should be conducted if the ECS pro-
gram is to have a profound and revolutionary impact
on the NASA culture. Since NASA systems typically
are more dynamic and more complex than other sys-
tems, such as those in the nuclear industry, fundamen-
tal research is required to enable adequate modeling of
the interactions between hybrid-dynamic systems (sys-
tems composed of hardware, software, and human ele-
ments) operating in high-energy and hostile environ-
ments.
To balance the risk of not successfully completing
a task against the payoff when a high-risk task suc-
ceeds the ECS program has an appropriate mix of tasks
(Gawdiak, 2002a, and based on response question-
naires ). The majority are oriented to direct applications
in missions and organization risk mitigation and risk
analysis. A program such as ECS can be said to fail if
no other NASA programs use the tools and methodolo-
gies developed by the program. The payoff, on the other
hand, is a revolutionary change in NASA culture,
whereby mission and organization risk management
become an integral part of the design of spacecraft and
. .
missions.
The panel was also concerned with several tasks in
the ECS program. The ECS panel acknowledges that
NASA has constructed a competent team of in-house
Integration of mission- and organizational-
risk-oriented tasks within the ECS program
overall,
OCR for page 41
PANEL ON ENGINEERING FOR COMPLEX SYSTEMS
and external expertise. Moreover, it agrees with ECS
management that top-down, functional decomposition
to identify research requirements is important, that the
starting point for the ECS program did not permit an
optimal decomposition, and that there is a continuing
challenge to integrate top-level research requirements
with lower-level tasks.
Since the program is still evolving, it is important
for the ECS program to continually seek external guid-
ance to help maintain the focus and quality of the pro-
gram. This is especially so for the SRRM project, which
has only recently come into clear focus (ECS,2003~.
Finding: ECS work in individual tasks is, in gen-
eral, good and focused.
Finding: The ECS program is in the early stages of
developing a concentration in programmatic risk
management within NASA, which should prove to
be central to the NASA mission.
Finding: In general, the ECS program appears to
address the right problems through a multidisci-
plinary research approach.
Finding: The ECS program, and SRRM in particu-
lar, is still evolving. External reviews can help the
program maintain focus and quality.
Recommendation: The ECS panel recommends that
the ECS program make use of external, indepen-
dent reviews to maintain the focus and quality of
the program.
The personnel working under the ECS program are,
with few exceptions, of very excellent quality and rep-
resent NASA well. The program generally makes use
of contractors and contractor facilities efficiently.
Challenge Areas
The ECS panel has identified two general areas that
cut across the ECS program where, if changes are
made, the ECS program as a whole would benefit. The
first is the institution of benchmarks by which to mea-
sure success and the second is an analysis of the sys-
tem-level impacts of task products. At the management
level, for instance, a benchmark of success for the
SRRM project could be the successful deployment of
41
the risk workstation that is currently being developed,
as detailed in the SRRM review below.
The implementation of benchmarks (so-called
"measurables") is also very important at the individual
task level. In general, benchmarks refer to quantitative
goals or expectations that serve as technical measures
of success. For instance, a measure of success at the
task level under SRRM might be successfully engag-
ing a target number of NASA mission program offices
and having them use the defect detection and preven-
tion tool or the technology infusion, maturity assess-
ment process. The SRRM project is already doing this
informally, but it is important to list these criteria as
formal benchmarks of success. The ECS panel did not
see evidence that measurables have been integrated into
all of the tasks. The panel acknowledges that the ECS
program is relatively new but believes that measurables
should be part of the planning for all individual tasks.
Recommendation: The ECS program should imple-
ment clearly defined benchmarks at the individual
task level in order to judge task progress.
The ECS panel was impressed by the top-level vi-
sion that the ECS managers presented (Gawdiak,
2002a; Jones, 2002; Pallix, 2002; Prusha, 2002). This
vision could be strengthened by analyzing the impact
these tasks will have on NASA missions. This system-
level analysis is important to guide NASA managers
on the scope of their tasks and the impact they may
have on large, distributed physical systems (computers
and hardware) as well as organizational systems for
management and decision making. It was not apparent
to the ECS panel that these plans are currently in place.
Recommendation: Each ECS task should have a
system-level analysis of the impact it could have on
NASA missions in order to determine the overall
scope and the possible agency-wide impact of each
ECS task.
SPECIFIC TASK DISCUSSIONS
The review panel evaluated individual tasks based
on presentations from researchers during site visits and
questionnaires completed by individual researchers. If
the ECS panel had follow-up questions, individual
members of the panel contacted the researchers directly
or NRC staff requested additional information, such as
OCR for page 42
42
AN ASSESSMENT OF NASA 'S PIONEERING REVOLUTIONARY TECHNOLOGY PROGRAM
published reports. Individual tasks are discussed under
their projects, below.
The ECS panel found some tasks within the ECS
portfolio that were world-class efforts. Tasks falling
under this category have the potential to yield signifi-
cant results for NASA and possibly for communities
outside NASA. The panel points out some of those
tasks below as examples.
The ECS panel found other tasks within the ECS
portfolio that could be strengthened to make the over-
all ECS program better. The tasks identified as "Wor-
thy Efforts That Could Be Strengthened" should not be
discontinued but should be altered in a way to further
benefit NASA.
While most of the ECS program is good, goal-ori-
ented work that supports the NASA mission, the ECS
panel identified two level 5 tasks that no longer appear
to be relevant. These are discussed in the SRRM and
KESS sections.
SYSTEM REASONING FOR RISK MANAGEMENT
The System Reasoning for Risk Management
(SRRM) project consists of two elements, Integrated
Risk Management Technologies and Integrated Sys-
tem Modeling and Reasoning. The objective of SRRM
is to develop a comprehensive risk management ap-
proach for safety and system failure, to be used in the
design and development of NASA aeronautics and
space systems (Prusha, 2002~. If successful, this work
will yield a risk management framework that can be
applied throughout program and system life cycles to
achieve greater safety and dependability of operation
than achieved by traditional design approaches still in
use today.
SRRM research is critical to future NASA missions
and has the potential for cross-NASA applicability, as
well as applicability in the broader technical commu-
nity outside NASA, but only if managed and imple-
mented effectively. The introduction of a comprehen-
sive risk management approach in the preliminary
design phase rather than afterwards would enable de-
sign trade-offs between performance, cost, schedule,
and safety throughout program and system life cycles.
If NASA considers safety early in the design cycle, it
can halt or alter the development of unsafe systems
early on. Improving safety later in the design process
can be extremely expensive.
The risk management framework supporting sys-
tem design and development can help achieve a proper
balance among system performance, schedule, cost,
and safety, such that all of these parameters are at an
acceptable level. System safety, in terms of the prob-
ability of catastrophic failure on the one hand and the
probability of mission success on the other, will be pro-
vided, along with appropriate confidence bounds to
delineate the uncertainties inherent in the estimates. A
risk management framework may also be used to ac-
cess the risk (probability and associated uncertainty) of
achieving various system performance levels, system
delivery dates, and cost.
The SRRM objectives appear to be both worth-
while and achievable with a reasonable investment of
time and resources, considering the current state of the
art in the various disciplines of design, mission, and
organizational risk management. Improved system per-
formance and safety appear to be within reach. Cur-
rently, programmatic risk assessment and risk manage-
ment research outside NASA is scattered. With the
expertise available to NASA in the SRRM project, it
would be appropriate for the SRRM project to assume
a greater role in the risk management process and tool
development efforts within NASA. In addition, by le-
veraging work conducted outside NASA, SRRM has
the opportunity to integrate best practices that are suit-
able to NASA missions and needs.
Finding: The SRRM project, conducted under the
ECS program, is addressing critical issues in pro-
grammatic risk management. The project has the
potential to advance the state of the art for NASA-
wide and external applications.
The ECS panel has attempted to assess how the
SRRM project has fared in terms of translating its top-
level objectives into a set of well-defined, achievable
goals. The panel has also examined how well these
goals have been addressed in specific project tasks, as
well as how these tasks as a whole will achieve overall
program objectives.
The ECS panel understands that the SRRM project
seeks to further the state of the art in important areas of
systems engineering for aeronautics and space systems.
It is assumed that the project would then organize its
activities in a systems engineering fashion, with top-
level project objectives flowing down to lower-level
task objectives.
Initially, the ECS panel could not see much evi-
dence that this orderly process was taking place, but to
be fair, it could also see serious programmatic reasons
OCR for page 43
PANEL ON ENGINEERING FOR COMPLEX SYSTEMS
for the delay in top-level project formulation. At first,
the project was called Design for Safety (DFS), but
very quickly, before significant project developments
could take place, its objectives and impact shrank sig-
nificantly owing to a reduction in budget. The panel
assumed that a considerable realignment of activities
took place because of these changes mandated from
above.
The ECS panel saw evidence that the SRRM
project included some tasks carried over from the DFS
program together with some newly defined tasks. Thus,
in assessing the work being conducted under the SRRM
project, it would be unfair for the panel to ignore the
background situation that has directly affected the pro-
gram mode of development.
The SRRM management team proactively stream-
lined its efforts during the course of this review by
twice revising its work breakdown structure. In this
sense, the panel has been reviewing a moving target.
With that said, the panel appreciates ECS management
efforts to identify and start implementation of needed
changes to the structure and organization of the SRRM
project.
Between June and October 2002, there were indi-
cations that the ECS management tried to put a more
disciplined approach into effect, especially in the
SRRM project. As of April 2003, the project plan for
SRRM (ECS, 2003) appeared to be sounder and better
organized than at the beginning of the panel's review.
In fact, the material presented in April 2003 by NASA
demonstrated to the panel that the reorganized SRRM
project, as well as the goals and objectives, was greatly
improved and more in line with NASA's mission. The
panel also saw evidence that the SRRM project had
taken into account and acted on guidance provided by
the PRT committee in the interim letter report issued in
January 2003 (NRC, 2003~. During the April 2003 re-
visit, NASA reported that the SRRM project had par-
ticipated in the internal NASA review of the Columbia
accident. Development and implementation of a ma-
ture risk management process might provide a frame-
work for accident investigation, as well as a process for
safety improvement.
At the start of the review, in June 2002, the ECS
panel had concerns about the ad hoc flavor of the tasks
(Gawdiak, 2002a; Prusha, 2002~. However, after the
April 2003 follow-up review of the redirected SRRM
project, the panel found that the changes made to the
project are good and appropriate. Details of the
43
project's new makeup and comments on specific tasks
are presented below.
Finding: The ECS panel concurs that the changes
made during the course of the review to the SRRM
project under the ECS program were correct and
appropriate.
The ECS panel wishes to point out some of the key
concepts that ECS management appears to have em-
braced. Specifically, the SRRM project has developed
a coherent strategy and roadmap for the development
of technology that will potentially apply to many
NASA programs. In this process, ECS management
identified how the individual tasks and research ele-
ments fit into a broader concept of risk management
that incorporates metrics of risk in the early design
phases and carries them all the way through final de-
sign and even implementation and operation. The panel
wishes to emphasize that all activities under the SRRM
project should be carried out in close consultation with
the risk assessment technical community at large, as
discussed in the next section.
Connections to the External Community
As part of the review process, the ECS panel was
asked to examine how well the technical program was
interacting with the community outside NASA. It found
that the interaction of the SRRM project with the risk
assessment and management community outside
NASA has been limited and can use improvement. As
presented, the tasks within the SRRM portfolio ap-
peared to be based mostly on internal NASA work and
knowledge despite the wealth of information available
outside NASA that would only enhance the program.
The panel observed little leverage of external work in
mission and organization risk management. This has
been especially true for the interaction (or lack thereof)
of level 4 and level 5 task PIs with other communities.
As one example, the Risk Management Collo-
quium is held every year in Palo Alto, California, in the
summer or early fall. This colloquium is cosponsored
by NASA headquarters Code Q and NASA Ames Re-
search Center. Several members of the SRRM team
presented at, and took part in, this meeting in 2002.
The panel encourages SRRM to take an even more ac-
tive role, such as organizing a special session on SRRM
objectives and needs. Since most of the NASA risk
OCR for page 44
44
AN ASSESSMENT OF NASA 'S PIONEERING REVOLUTIONARY TECHNOLOGY PROGRAM
management and assessment community from all of
the NASA centers would be present, along with some
invited outside experts, such a session would expose a
wide NASA audience to the SRRM project and goals.
In general, the ECS panel noted that the SRRM
dialogue with the risk assessment community at large
appears to have been limited and unorganized. It be-
lieves that there are ideas and expertise in the external
technical community that could greatly benefit SRRM
activities if better lines of communication and coop-
eration are established. There is some anecdotal evi-
dence that SRRM connections to the external commu-
nity are improving. The panel encourages SRRM to
continue pursuing formal and informal interactions.
Recommendation: SRRM project management and
task principal investigators should formally engage
the internal NASA community as well as the exter-
nal technical community as often as possible in or-
der to gain exposure to external expertise and ben-
efit from it.
Every technical community has a concept of what
risk means to it. These communities also have their
own methods for risk mitigation. To become the center
of gravity for multiple communities, including NASA,
and to maintain credibility in those design communi-
ties, ECS must demonstrate that it has knowledge of
the state of the art and best practices in each of those
communities. NASA can move toward demonstrating
this understanding and credibility through the use of
the Cross-Enterprise NASA Research Announcement
(NRA) open solicitation process.
Recommendation: The SRRM project, conducted
under the ECS program, should ensure that all task
deliverables (engineering tools, etc.) can be used
across the diversity of NASA projects and missions
in order to maximize their effect. This broad appli-
cability will require that researchers in the SRRM
project become familiar with the challenges faced and
methods used in many NASA projects and missions.
Research Portfolio
The ECS panel found that the level 4 and level 5
tasks appear to reasonably cover important areas of
need, as defined by NASA and top-level ECS goals. At
the start of this review, the ECS panel had concerns
that the SRRM project was attempting to fund too many
projects at a funding level too low to yield significant
results. During the course of this review, the SRRM
project correctly decided to reduce the number of tasks
it was supporting (ECS, 2002; Penix and Jones, 2003).
This appropriate action has yielded a much more effec-
tive but leaner SRRM organization. The ECS panel be-
lieves that this limited research, in view of limited fund-
. . .
sing, Is appropriate.
As already stated, it is important for NASA to re-
member that SRRM results should be applicable to all
NASA projects and missions. The project should also
ensure that even during the initial development of the
risk workstation that NASA has planned and is con-
ducting, serious efforts should be made to capture and
include all of the major risk factors in the trade-offs
encountered in mission or system design. The ECS
panel recognizes the difficulty of this undertaking.
However, if not done carefully, incomplete design
trades may produce misleading or incorrect informa-
tion, resulting in a false sense of security in the final
product.
The tasks being conducted under the SRRM project
appear to be defined with an appropriate level of pro-
gram risk in that they have a reasonable chance of suc-
cessful completion. The ECS panel emphasizes that
SRRM research inherently needs to proceed from a
solid basis of previous developments, and in an orderly
and systematic fashion. Therefore, the risk associated
with development and application of the risk mitiga-
tion work has a medium chance of successful comple-
tion but, if completed, a high payoff for the NASA
missions. SRRM is approaching and managing its risk
appropriately, mainly by assigning the right people to
the task in question or by soliciting help as needed.
People and Facilities
A positive aspect of the work being conducted un-
der the SRRM project is that the project is bringing
together people from multiple disciplines and perspec-
tives to jointly develop a common vocabulary and
achieve common goals. SRRM has apparently as-
sembled this group in a very deliberate manner. First, it
found the people in NASA it wants to work with and it
has also developed a program management structure.
SRRM has made an attempt to bring in people from the
outside through the use of various NRAs. These are
leaders in their fields who can easily fill any gaps in
expertise. The facilities were in good condition and
appropriate for the work being conducted.
OCR for page 45
PANEL ON ENGINEERING FOR COMPLEX SYSTEMS
Methodology
SRRM personnel have approached mission
projects within NASA in order to explore and possibly
create technology transition opportunities for SRRM
products. The ECS panel commends the SRRM project
for its successful use of this methodology. Once NASA
missions take on SRRM products or processes, the
SRRM work can reach a higher TRL more easily by
virtue of its real-world use by NASA missions.
Of several notable successes of the SRRM project,
one success is the use of the Technology Infusion,
Maturity Assessment (TIMA) process by the Primary
Atomic Reference Clock in Space mission. The same
TIMA process was also used to validate the LabView
software architecture for use in space. Finally, the De-
fect Detection and Prevention (DDP) program is being
used by the Mars Science Laboratory mission, slated to
fly in 2009. DDP is being used as a tool for program
management, which is based on an underlying risk
mitigation process.
These successes prove that SRRM has taken steps
to ensure that the methods and techniques it develops
can be migrated out to a user community. SRRM
should continue to make certain that the applications
propagate beyond these few programs to allow ECS to
become a center of gravity for NASA in probabilistic
risk-based design.
Recommendation: The SRRM project, under ECS,
should further concentrate on migrating its devel-
oped techniques and methodologies, such as Tech-
nology Infusion Maturity Assessment (TIMA), to a
user community within NASA in order to make ECS
a center of gravity within NASA for risk assessment.
Quality of Work
At the start of the SRRM project, the ECS panel
found that there was a mismatch between the types of
tasks being conducted under SRRM and the SRRM
project objectives (Prusha, 2002~. Since then, SRRM
has reduced the number of tasks being pursued and has
also apparently made active use of the NRA process.
As a result of these program changes, the SRRM
project improved dramatically over the course of the
review. The panel has determined that the current work
being conducted in the SRRM project is on the right
path and could become excellent quality and meet ac-
cepted peer-review standards.
45
Observations on Specific SRRM Tasks
Wor/~-C/ass Tasks
There are no tasks in this category for SRRM.
Comp/eled Work or areas Not Supporting the
NASA Mission
Probabilistic Analysis of HISS Power System This task is
being conducted as an SRRM level 2 task. Previous
work under this task gave some very good and useful
results on the power usage of the International Space
Station. The follow-on efforts aim to bring the power
system model to a higher resolution. The ECS panel
believes that there is a diminishing rate of return on
this activity and that there is no need to go beyond the
current understanding of the ISS power system. In this
sense, the work conducted under that task was very
good, but it is complete. ECS management has can-
celed this task and the ECS review panel agrees with
this decision.
KNOWLEDGE ENGINEERING FOR SAFETY
AND SUCCESS
The Knowledge Engineering for Safety and Suc-
cess (KESS) project concentrates on system-level
model and methods design for system and human orga-
nizational risk and failure analysis. The project is di-
vided into two level 3 elements: Human and Organiza-
tional Risk Management (HORM) and Knowledge
Management (KM).
Human and Organizational Risk Management
This level 3 element aims to identify, model, pre-
dict, and mitigate technical and program risks as a func-
tion of the structure and processes of teams and organi-
zations. This is a very ambitious undertaking. It
involves the creation of a novel synthesis of observa-
tional, cognitive, technical, and organizational meth-
odologies in the service of critically important NASA
goals. If successful, this element could become a core
competency within NASA.
The ECS panel found that the element summary
presented by ECS management is well written and pro-
vides clear directions for the research to follow. Gener-
ally, the portfolio mix of beginning versus mature tech-
OCR for page 46
46
AN ASSESSMENT OF NASA 'S PIONEERING REVOLUTIONARY TECHNOLOGY PROGRAM
nology tasks appears to be appropriate. The ECS panel
based its conclusion on the technology readiness level
(TRL) system that NASA employs.
Key parts of this effort include the development
and deployment of a useful multilevel model of risk
perception and management while optimizing organi-
zational performance. Some parts of this important set
of tasks are easier to conceive and execute than others.
While improvement in techniques and processes often
appears to be straightforward, the approach on funda-
mental issues is more daunting.
For instance, developing the organizational portion
of the risk management model would clearly be a ma-
jor outcome. However, given the current state of orga-
nizational modeling, the early development and vali-
dation of such a model (to be completed in FY2003)
seems overly optimistic. Important questions that re-
main to be answered are these:
What are the research hypotheses?
What would a model look like?
How would such a model be used?
In what sense would the model be computa-
tional?
How would it be validated?
The ECS panel knows that the research team is well
aware of these issues, yet seemingly infeasible mile-
stones are presented as part of the overall plan. It is
possible that the short development time may have been
imposed from above the element level to foster coher-
ence across programs. While timeliness is also a desir-
able goal, the ECS panel believes that the development
of novel models and validation methodologies should
be given enough time.
Recommendation: The Human and Organizational
Risk Management level 3 element within the ECS
program should establish a feasible time frame for
the development of novel models and methodolo-
gies in order to allow researchers an appropriate
amount of time to generate measurable results.
The ECS panel commends NASA for taking on
such a challenging task as developing complex organi-
zational models. A critically important aspect of the
modeling research is its multidisciplinary nature. The
ECS panel believes that the model development effort
can be improved by having social scientists work on
the same team with engineers, systems/equipment op-
erators, and computational model developers. This type
of interaction should be in addition to engaging in col-
legial dialogues. The diverse group could integrate the
individual expertise of its members into the joint enter-
prise and together be responsible for the outcome.
Closer ties with the multiagent systems researchers in
the CICT program would also help to create computa-
tional models of organizations that could be used to
predict risk factors.
Recommendation: To improve the model develop-
ment process, the Human and Organizational Risk
Management level 3 element within the ECS pro-
gram should increase the diversity of the research
team by including engineers, systems/equipment
operators, and computational model developers.
The effort within ECS should also establish closer
ties to the NASA CICT program to help in the cre-
ation of computational models.
One place where this multidisciplinary approach is
being tried is in the empirical analysis of problems that
may occur during shift handovers, as identified in the
level 5 task Understanding Shift Handovers in Mission
Control, for which a new choice capture tool has been
implemented in the level 5 task Choice Capture Tech-
nology for Mission Control. The work is important in
that it could improve the success of shift handovers, as
well as provide a means to evaluate the usability and
utility of the developed tool. Other aspects of multi-
disciplinary research that could be incorporated into
the Human and Organizational Risk Management ele-
ment include, for example, results from artificial intel-
ligence (especially multiagent systems), distributed
cognition, and natural language processing, particularly
in the design and deployment of controlled languages
as they are being developed by Boeing Corporation.
Since organizational dynamics figure prominently
in mishaps, it is very important that more effort be de-
voted to understanding and modeling organizations in
tasks under the Human and Organizational Risk Man-
agement element. For instance, organizational metrics
are not as well understood as team metrics and depend
on an organizational model for relating team and orga-
nizational performance. The ECS panel believes that it
is important for NASA to increase its knowledge of the
organizational processes, climates, and information
flows in order to detect and repair latent pathogens in
complex systems (Reason, 1990~. These so-called
pathogens were cited in recent accidents, including the
OCR for page 47
PANEL ON ENGINEERING FOR COMPLEX SYSTEMS
Columbia tragedy. Multiorganizational processes and
relationships, such as interorganizational relationships
and dynamics, should also be studied. Finally, some
account needs to be taken of the role of management
priorities in setting safety/risk policies and in their as-
sessment. At the start of the review, the ECS panel was
concerned that the technical and management links
between the three elements within ECS were not
strong. As of April 2003, it appeared to the panel that
the ECS program has established those linkages. The
panel believes that these linkages should be strength-
ened, especially between Human and Organizational
Risk Management and SRRM.
Recommendation: In terms of overlap between ar-
eas of expertise within ECS, it would be desirable
for the Human and Organizational Risk Manage-
ment element to be more explicitly integrated with
the products coming from the System Reasoning for
Risk Management project.
Knowledge Management
The Knowledge Management level 3 element of-
fers a number of exciting, well-integrated research ef-
forts that aim to capture and represent knowledge of
the structure and function of spacecraft hardware
throughout that hardware's life cycle. The results of
these efforts will be an integration of contractor and
agency knowledge bases that could be used by design-
ers, operators, and maintenance personnel, as well as
by automated diagnostic systems. Two examples of this
work are the level 4 task Wire Integrity Research and
the level 5 task Hybrid Reflectometer.
The ECS panel deemed that the Virtual Iron Bird
level 4 task is especially notable. The goal of the task is
to build a detailed virtual model of the space shuttle as
a means to visualize and interact with a virtual shuttle
before attempting operations on the vehicle itself that
have a high risk of damaging the shuttle. This project is
showing the way forward for other spacecraft designs.
Also notable under the Knowledge Management
element are two database collection tasks, Lifecycle
Systems Integration and Digital Modeling, that will
enable NASA to capture technical measurements and
specifications of the shuttle and other spacecraft de-
signs. These efforts will allow NASA to take into ac-
count uncertainties in structure and function that are
created by wear, maintenance, and undocumented
modifications.
47
There is some general overlap between the Knowl-
edge Management element within ECS and another
PRT program, the Computing Information and Com-
munications Technology (CICT) program. The ECS
panel looked carefully at this issue and found that stron-
ger collaboration between the two groups would create
an even more goal-directed program.
Recommendation: The Knowledge Management el-
ement within ECS should work together with Com-
puting, Information, and Communications Technol-
ogy (CICT) program researchers to prioritize
research on computational tools that underlie the
Knowledge Management element's efforts.
The ECS panel noted that one level 4 task, Inter-
Organizational Process Analysis, and its two subtasks,
Socio-Technical Approach for Identifying Ground Pro-
cessing Errors and Human Factors in Inter-Organiza-
tional Process Analysis, appear not to fit the focus of
the Knowledge Management level 3 element because
these two subtasks involve characteristics of organiza-
tions, which are supposed to be incorporated under the
level 3 element Human and Organizational Risk Man-
agement. Moreover, the ECS panel believes that the
level 4 task, as currently executed, is not likely to pro-
duce the desired general knowledge.
Recommendation: The level 4 task Inter-Organiza-
tional Process Analysis should be integrated under
the Human and Organizational Risk Management
level 3 element with better designed subtasks in or-
der to make the effort more effective.
Observations on Specific KESS Tasks
Wor/~-C/ass Tasks
Organizational Risk Perception and Management This
level 4 task, placed under the level 2 KESS project, is a
well-written overview of the domain and task direc-
tions for risk perception. The scientific background and
research progress of this task is also impressive.
Virtual iron Birds This level 4 task under the level 2
KESS project appears to be an innovative approach to
allowing users to visualize and interact with informa-
tion about the structure and function of complex sys-
tems. The results will support maintenance and modifi-
cation operations.
OCR for page 48
48
Worthy Efforts That Cold Be Strengthened
Organizational Metrics At the start of the review cycle,
this level 5 task under the level 2 KESS project demon-
strated a good beginning to an effort that consists of
NASA-relevant work. A weakness identified at that
time was that the project researchers should have been
more cognizant of the literature in the high reliability
field in order to give the technical community at large
more confidence in the ultimate result of the task. Also,
the panel felt that the PI should consider collaborating
or consulting with the high reliability community. As
of April 2003, in conjunction with the Human and Or-
ganizational Risk Management element, the team had
conducted a literature search of organizational culture,
safety culture, and high-reliability organizations. It also
apparently cross-linked this effort to other researchers
pursuing similar topics. The panel commends ECS for
taking all of these steps.
~nterorganization Process Analysis At the start of the re-
view, the panel was concerned that, given the current
working plans, this level 4 task under the level 2 KESS
project was not likely to produce the general knowl-
edge that is being sought. In early 2003, the task was
rescoped by ECS management and placed under the
direct support of the Digital Shuttle task. The panel
concurs with this action.
Human Factors in ~nterorganizationa~ Process Analysis This
level 5 task under the level 2 KESS project would ben-
efit by involving more basic science principles. As de-
scribed in the PI's response to the questionnaire, the
task "builds on the methods and tools of psychology,
anthropology, linguistics, and communication sci-
ences," and presumably employs "field and observa-
tional methods to characterize technical operations."
However, this level of generality is not helpful for un-
derstanding the strengths and weaknesses of an effort
at TRL 4-6, where the expectation of near-term posi-
tive outcomes needs to be based on earlier basic sci-
ence. For the work to succeed, it is critical to specify
the conceptual frameworks and corroborated results
from the previous research on which the task will build
and to which the task should be expected to contribute.
The absence of such well-articulated starting points is
of concern to the panel.
Wire integrity Research This level 4 task under the level
2 KESS project and the level 5 task under it, Hybrid
AN ASSESSMENT OF NASA 'S PIONEERING REVOLUTIONARY TECHNOLOGY PROGRAM
Reflectometer, are good work and should continue. The
effort aims to develop techniques that would automati-
cally diagnose the state of health of wiring on aging
spacecraft and is directly applicable to NASA's mis-
sions.
At the beginning of the review, the ECS panel be-
lieved that this research activity might be generalizable
beyond the shuttle and that it therefore needed to be
more basic. Also, the panel found that the project
should include more physics-based measurement re-
search on techniques applicable to multiple systems.
To strengthen the project, NASA should take more of a
leadership role in industry and academia in this tech-
nology field than it has been taking. The ECS program,
apparently the leader at this point in wire integrity re-
search within NASA, could expand its efforts, specifi-
cally by involving NASA's Office of Safety and Mis-
sion Assurance (Code Q).
As of April 2003, the panel was satisfied that the
task PI and management have significantly improved
their work by more actively engaging the external com-
munity and participating in the research on physics-
based measurement techniques. The ECS panel com-
mends the members of the Wire Integrity Team for
their good performance given the limited amount of
funding.
Areas Not Supporting the NASA Mission or
Completed Work
Sociotechnical Approach for Identifying Ground Processing
Risk This task is being conducted under the level 2
KESS project. The private contracting company that
NASA employs has little demonstrated familiarity with
sociotechnical systems theory. Also, it has no approach
for integrating social and technical risk. It is not clear
whether the off-the-shelf tool the contractor developed
and the experience it has with medication errors in hos-
pitals will generalize to the NASA-specific task. There
would not be opportunities for validating the resulting
error estimates, especially the interdependencies
between errors, using the task's current plan. In gen-
eral, the activities rely too heavily on unverifiable
judgments.
As of April 2003, this task was still ongoing. The
review panel understands that it intended to provide
support to the Digital Shuttle effort. However, the work
conducted under this task could seriously jeopardize
the overall success of the Digital Shuttle effort. Unless
OCR for page 49
PANEL ON ENGINEERING FOR COMPLEX SYSTEMS
drastic changes are made to the task, including chang-
ing the support contractors, the review panel recom-
mends that it be discontinued, as the quality of work is
not up to NASA standards.
Recommendation: The ECS panel recommends that
the level 5 task Socio-Technical Approach for Iden-
tifying Ground Processing Risk be discontinued or
its support contractors replaced with more quali-
fied personnel.
RESILIENT SYSTEMS AND OPERATIONS
The Resilient Systems and Operations (RSO)
project was formed to address safety and stability is-
sues in mission software, autonomous systems, and
human-machine interfaces (Pallix, 2002~. The project
comprises two level 3 elements, Intelligent and Adap-
tive Operations and Control and Resilient Software
Engineering. The Intelligent and Adaptive Operations
and Control element encompasses four level 4 tasks.
The Resilient Software Engineering element includes
two level 4 tasks and seven level 5 tasks.
The RSO project appears to be broad in scope, and
its two principal components appear to be central to the
NASA mission. The project has engaged some of the
nation's best talent in human-computer interaction, es-
pecially in software engineering. The ECS panel noted
particularly exemplary efforts in JAVA Pathfinder and
in the establishment of the NASA Ames Research Cen-
ter testbed for computer code verification. With this
said, the ECS panel did have concerns about the direct
applicability to NASA of some of the tasks, as dis-
cussed in the next section. As of April 2003, the RSO
project had made significant improvements, including
becoming more customer- and application-oriented.
Intelligent and Adaptive Operations and Control
The Intelligent and Adaptive Operations and Con-
trol element has a very well-balanced portfolio of level
4 tasks in terms of their probability of success. There is
a good mix of TRLs across the tasks. The TRL range is
from 1 to 2 for the task Autonomous Propulsion Sys-
tem Technologies and 4 to 7 for the task Adantive
Flight Control Research. Overall, the tasks are compa-
rable to and competitive with academic work in the
same category. From discussions it had with manage-
ment of this element, the ECS panel anticipates that the
element's work will take the positive step of concen-
49
bating more on autonomous operations for systems
than on system components, as it does now.
Resilient Software Engineering
The use of software is pervasive throughout all the
NASA missions. There has long been a challenge for
both NASA and industry to produce reliable software
in a timely, cost-effective manner. As such, the Resil-
ient Software Engineering element is central to
NASA's mission.
The potential benefits of better software develop-
ment techniques are very great: They could improve
the prospects for successful missions and ensure that
missions meet their cost objectives. However, it was
difficult for the ECS panel to determine if the tasks
being conducted under the Resilient Software Engi-
neering element are likely to have a significant impact
on software development within NASA given the long
history of research and work in these areas outside
NASA and the lack of specificity in identifying NASA
software challenges in task descriptions.
Software engineering in general and dependable
systems in particular are well-developed research dis-
ciplines ubiquitous in academia and industry. Resil-
ient Software Engineering element research in these
areas follows several currently popular approaches.
However, the rationale for NASA selecting these spe-
cific approaches over others was unclear to the review
panel at the beginning of the review, as was the appli-
cability of the tasks to NASA's most pressing software
problems.
At the start of the review, academic participation
in High Dependability Computing research, a level 4
task within Resilient Software Engineering, appeared
to have been heavily skewed toward the conventional
software engineering community and did not give suf-
ficient weight to researchers from other important com-
munities. These other communities include real-time
computing, dependable computing, and static program
analysis, all three of which could make valuable con-
tributions.
As of April 2003, the work under the Resilient
Software Engineering element had greatly improved.
While there is much work to be done, the top-level view
of the collection of tasks was much more focused and
the element's goals appeared to be relevant to NASA
or, at a minimum, to other work being done within the
ECS program, such as the SRRM project. The element
has also apparently expanded its involvement within
OCR for page 50
so
AN ASSESSMENT OF NASA 'S PIONEERING REVOLUTIONARY TECHNOLOGY PROGRAM
NASA by making contact with researchers at Marshall
Space Flight Center and outside NASA with the United
Space Alliance. It has also added at least one task in-
volving network dependability to the mix of tasks be-
ing pursued. Finally, the element adjusted its mix by
dropping some tasks that were complete or not per-
forming to expectations. The panel concurs that all of
these actions should improve the overall Resilient Soft-
ware Engineering element.
Finding: The Resilient Software Engineering ele-
ment tasks, while showing improvement over the
course of the review, appear to have limited partici-
pation by other software-related communities such
as real-time computing, dependable computing, and
static program analysis.
Research by the Intelligent Software Engineering
Tools task exhibits considerable overlap with that by
active academic and commercial research, as many of
the problems are shared by industry, including the high
cost of software development, the difficulty of large-
scale collaboration, and the need to ensure high de-
pendability. Since funding for the NASA effort is
scanty, the panel questions the benefit of duplicative
efforts. To maximize the impact of this work on NASA,
the panel recommends focusing the research on prob-
lems of high priority to NASA that are not adequately
addressed by outside research and commercial tools.
Recommendation: The Intelligent Software Engi-
neering Tools component of the Resilient Software
Engineering element within the RSO project of
ECS should continue to identify which of NASA's
high-priority software problems are unique to
NASA and which high-priority software problems
are not being addressed by industry research or the
academic community. Based on this identification,
management should then shift resources under the
Resilient Software Engineering element as needed.
The ECS panel encourages NASA to continue to
seek involvement from other software-related com-
munities, such as dependable computing and static
analysis.
The high dependability testbed included in the level 5
tasks High Dependability Computing, Testbed for Re-
usable Flight Software, and Dependable Networks for
Flight Testbed has the potential to make significant
contributions to NASA and beyond. Collaboration with
academics by making testbeds available to them is an
excellent and relatively new approach that allows aca-
demic researchers to work on problems immediately
relevant to NASA. The result of such a testbed collabo-
ration should be flight-qualified or near-flight-quali-
fied software that is made available to the general re-
search community. Such software is often difficult to
obtain from other sources.
Recommendation: The ECS panel suggests that
ECS management make the flight software code de-
veloped at the Ames Research Center testbed avail-
able to the general research community.
The ECS panel notes that the Ames Research Cen-
ter established such a software dependability labora-
tory in the past namely, the Digital Flight Control
Systems Verification Lab (DFCSVL), a facility that
existed at Ames about 20 years ago. The panel hopes
that the current effort can be sustained, since past simi-
lar work was discontinued. While the ECS panel is en-
thusiastic about the establishment of such a laboratory,
it urges project managers to carefully plan for
sustainability of the lab.
Because it involves complete systems, software
development under the Resilient Software Engineering
element is very complex. Examples of this complexity
are evident in the Jet Propulsion Laboratory's (JPL's)
Mission Data System (MDS) software, a project for
managing telemetry, flight, and experiment data on-
board a spacecraft, and the code for the Center Termi-
nal Radar Approach Control (TRACON) Automation
System (CTAS), a system providing controllers with
various aids for more effectively directing the flow of
aircraft at busy airports. In fact, the software may be
too complex for this (or any other) testbed to perform
the intensive verification and validation needed for
high-dependability software. It is unclear what benefit
could be gained from unit or subsystem testing of the
MDS or CTAS, because the development organizations
(JPL and Ames) are already performing such testing.
The reported goal of the new Ames laboratory is to
perform integrated testing.
It appears that the level 4 tasks Autonomous Pro-
pulsion System Technologies and Adaptive Flight Con-
trol Research, which do not have a significant verifica-
tion and validation component, could definitely benefit
iSee .
OCR for page 51
PANEL ON ENGINEERING FOR COMPLEX SYSTEMS
from the activities of the Ames laboratory. These tasks,
if successful, would be subject to extensive certifica-
tion and qualification requirements if the technology
developed is eventually applied to civil aircraft. The
ECS panel therefore encourages the project to concen-
trate the laboratory testbed research on these two level
4 tasks as these two tasks will in all likelihood benefit
the most.
Recommendation: The ECS panel suggests that
NASA management concentrate the Ames Research
Center software verification and validation labora-
tory testbed on the level 4 tasks Autonomous Pro-
pulsion System Technologies and Adaptive Flight
Control Research being conducted under the Resil-
ient Systems and Operations level 2 project.
Observations on Specific RSO Tasks
Wor/~-C/ass Tasks
Advanced Software Verification and Testing Tools This
level 5 task is contained under the RSO level 2 project.
It concentrates on statically analyzing software to find
bugs and has a clear motivation and approach. The
work also builds clearly on previous work at Ames
Research Center.
Worthy Efforts That Could Be Strengthened
Empirically Validated Software Dependability Model The
ECS panel questions whether this level 5 task, under
the level 3 Resilient Software Engineering element,
will yield the desired results. The validity and useful-
ness of the software dependability model that is being
used have not been explored, but the model is slated to
be transferred directly to development efforts. The TRL
listed for the task is based on high expectations that the
model will work in a new domain.
Perhaps the most important question here concerns
the data being used. Without adequate data, this re-
search, like much of the research that preceded it over
the last three decades, has a far lower probability of
success than the 75 percent estimated in the task de-
scription. Much of the data that might be used in this
program originated in the NASA Goddard Software
Engineering Laboratory (SEL). NASA has a wealth of
other data that could be made available to this effort.
51
made to provide the research team with data and the
background information necessary to assemble such
data.
Dependable Networks for Flight Testbed This level 5 task
under Resilient Software Engineering is being devel-
oped to assess the applicability of dependability tech-
nologies to potential next-generation ISS onboard in-
formation technology capabilities. At the start of the
review, the panel found that the task could be improved
by involving researchers from the distributed systems
and reliable computing communities. These communi-
ties have been working on similar issues for many
years. As of April 2003, ECS had taken significant
steps to involve researchers in these other areas. The
review panel is comfortable that the effort should yield
useful results.
intelligent Software Engineering Tools The comments the
ECS panel has for this level 4 task under the level 3
Resilient Software Engineering element also apply to
the level 5 tasks under it except for the level 5 task
Advanced Software Verification and Testing Tools,
which the ECS panel deems was world-class (criteria
listed in Chapter 2~.
At the start of the review, the ECS panel found that
the goals of the general tools projects could have been
more solidly formulated and given a clearer motiva-
tion. The panel was unable to determine at that time if
there were any novel ideas or approaches for these
tasks. In particular, it was unclear why NASA needed
to develop its own tools in light of the many commer-
cial and open-source projects cited in the project de-
scriptions.
Specifically, the motivation for the level 5 task
Formal Specifications Database, to create a database of
formal specifications, was not clear, nor did the panel
understand how such a database would be searched or
who the end user community would be.
During the course of the review, the ECS manage-
ment canceled the level 5 task Collaborative Software
Engineering Tools and descoped the other two tasks:
Formal Specifications Database and Formal Enough
Notations for Computer System Engineering. The ECS
panel believes that the ECS management took the cor-
rect action in this case. Furthermore, as discussed in
the preceding section, ECS has taken additional posi-
tive steps by engaging the internal NASA community
The highly qualified lead on this task will have a much to identify those NASA-specific problems that need to
higher likelihood of success if a concerted effort is be addressed.
OCR for page 52
52
REFERENCES
AN ASSESSMENT OF NASA 'S PIONEERING REVOLUTIONARY TECHNOLOGY PROGRAM
National Research Council (NRC). 2003. Interim Report of National Re-
search Council Review of NASA's Pioneering Revolutionary Technol-
ogy Program. Washington, D.C.: The National Academies Press. Avail-
able online at . Accessed
April 29, 2003.
Reason, James. 1990. Human Error. Cambridge, England: Cambridge Uni-
versity Press, pp. 173-216.
Venneri, Sam. 2001. NASA Aerospace Technology Enterprise, Strategic
Master Plan, April. Washington, D.C.: National Aeronautics and Space
Administration.
BRIEFINGS
Dennis Andrucyk, NASA Headquarters, "Office of Aerospace Technology
FY2004 President's Budget," material provided to the committee on
May 5, 2003.
Yuri Gawdiak, NASA Headquarters, "Summary SRRM WBS Modifica-
tions: April 2003 Update," material provided to the ECS panel in April
2003.
Yuri Gawdiak, NASA Headquarters, "ECS Program Strategies: Part I," pre-
sentation to the ECS panel on June 11, 2002(a).
Yuri Gawdiak, NASA Headquarters, "ECS NASA Research Council Re-
view," presentation to the committee and panels on June 11, 2002(b).
Patricia Jones, NASA Ames Research Center, "Knowledge Engineering for
Safety and Success," presentation to the ECS panel on June 12, 2002.
Joan Pallix, NASA Ames Research Center, "Resilient Systems and Opera-
tions," presentation to the ECS panel on June 12, 2002.
John Penix, NASA Ames Research Center, and Patricia Jones, NASA Ames
Research Center, "ECS Response to the NRC Review Committee's
Request for Additional Information," presentation to the ECS panel on
June 12, 2002.
Steve Prusha, Jet Propulsion Laboratory, "System Reasoning and Risk
Management," presentation to the ECS panel on June 11, 2002.
Representative terms from entire chapter:
ecs program