| Copyright © 2009. National Academy of Sciences. All rights reserved. Terms of Use and Privacy Statement |
Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter.
Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.
OCR for page 63
E
Example PDRI Element Descriptions
Note: The three element descriptions given in this appendix comprise one category and are provided for
illustrative purposes. Descriptions for the 61 other elements are contained in Cll Implementation Resource
155-2 (Construction Industry Institute, 1999J.
G. EQUIPMENT
G1. Equipment List
Project-specific equipment should be defined and listed. (Note: Building systems equipment is ad-
dressed in element F4, Mechanical Design, and F5, Electrical Design). In situations where owners are
furnishing equipment, the equipment should be properly defined and purchased. The list should define
items such as:
O Process
O Medical
O Food service/vending
O Trash disposal
O Distributed control systems
O Material handling
O Existing sources and characteristics of
O Relative sizes
equipment:
Weights
Location
Capacities
Materials of construction
Insulation and painting requirements
Equipment related access
Vendor, model, and serial number once identified
Equipment delivery time, if known
Other
63
OCR for page 64
64
APPENDIX E
G2. Equipment Location Drawings
Equipment location/arrangement drawings identify the specific location of each item of equipment in a
project. These drawings should identify items such as:
O Plan and elevation views of equipment and platforms
O Location of equipment rooms
O Physical support requirement (e.g., installation bolt patterns)
O Coordinates or location of all major equipment
O Other
G3. Equipment Utility Requirements
This evaluation should consist of a tabulated list of utility requirements for all major equipment items
such as:
O Power and/or all utility requirements
O Flow diagrams
O Design temperature and pressure
O Diversity of use
O Gas
O Water
O Other