| ||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||
| Copyright © 2009. National Academy of Sciences. All rights reserved. Terms of Use and Privacy Statement |
Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter.
Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.
OCR for page 12
APPENDIX D
Site Visit Checklist
Purpose, philosophy, brief history and anticipated future of facility
Major equipment inventory (with cost, replacement cost, age, funding source etc.)
Total budget and charging rates
Funding sources (host institution, government, industry, other)
Staff: permanent/non-permanent (faculty, professional, technical, stu(lent/intern)
Annual number of uses per instrument
Annual number of users per instrument (host, local, distant, international)
Status of equipment Adequate, up-to-date?)
· For state-of-the-art facility, what additional equipment is needled?
Is support personnel/fun(ling adequate?
Most successful aspects of facility (up to five)
Ways to improve facility, presently non-optimal (up to five)
· Complementary facilities (host, local, distant, international)
Educational role versus research role
How does facility meet host, local, distant, international needs?
How does facility fit into national/international perspective?
Recommendations to the committee (up to five)
12
Representative terms from entire chapter:
source etc