| ||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||
| Copyright © 2009. National Academy of Sciences. All rights reserved. Terms of Use and Privacy Statement |
Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter.
Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.
OCR for page 77
Review of the U.S. Army Corps of Engineers Restructured Upper Mississippi River–Illinois Waterway Feasibility Study: Second Report
Appendix A
OCR for page 78
Review of the U.S. Army Corps of Engineers Restructured Upper Mississippi River–Illinois Waterway Feasibility Study: Second Report
This page intentionally left blank.
OCR for page 79
Review of the U.S. Army Corps of Engineers Restructured Upper Mississippi River–Illinois Waterway Feasibility Study: Second Report
TABLE A-1 Mississippi River and Illinois Waterway System - Traffic Delays per Tow Annual Average (hours)a
System
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
Mississippi River
Upper St. Anthony
0.03
0.03
0.03
0.02
0.01
0.03
0.03
0.02
0.01
0.03
0.03
0.03
Lower St. Anthony
0.03
0.06
0.06
0.03
0.03
0.02
0.04
0.03
0.02
0.03
0.04
0.02
Lock and Dam 1
0.05
0.07
0.16
0.15
0.19
0.18
0.17
0.03
0.02
0.04
0.03
0.05
Lock and Dam 2
0.73
0.58
0.60
0.49
0.39
0.53
0.55
0.56
0.56
0.55
0.48
0.62
Lock and Dam 3
0.70
0.57
0.59
0.52
0.45
0.51
0.52
0.47
0.42
0.47
0.42
0.53
Lock and Dam 4
0.51
0.45
0.39
0.39
0.29
0.39
0.40
0.42
0.40
0.52
0.41
0.38
Lock and Dam 5
0.44
0.46
0.50
0.44
0.42
0.41
0.56
0.45
0.39
0.45
0.40
0.42
Lock and Dam 5a
0.42
0.42
0.41
0.46
0.33
0.44
0.43
0.49
0.42
0.50
0.45
0.41
Lock and Dam 6
0.67
0.71
0.64
0.70
0.46
0.63
0.73
0.68
0.60
0.66
0.61
1.05
Lock and Dam 7
0.83
0.70
0.68
0.64
0.55
0.60
0.67
0.70
0.75
0.66
0.69
0.86
Lock and Dam 8
0.89
0.81
0.89
0.60
0.62
0.89
0.96
0.88
0.75
0.83
0.77
0.89
Lock and Dam 9
0.54
0.47
0.57
0.39
0.46
0.60
0.60
0.65
0.70
0.70
0.76
0.65
Lock and Dam 10
0.71
0.51
0.69
0.51
0.39
0.81
0.89
0.95
0.67
0.76
0.73
0.82
Lock and Dam 11
1.79
1.39
1.19
0.74
0.72
1.25
0.97
0.96
0.84
0.95
0.94
0.95
Lock and Dam 12
1.31
1.32
1.24
0.70
0.57
0.98
1.13
1.01
0.82
1.06
0.87
1.30
Lock and Dam 13
1.16
1.52
1.25
0.95
0.71
1.32
1.26
0.82
0.70
1.00
0.99
0.97
Lock and Dam 14
3.97
1.43
1.19
0.89
0.93
1.66
2.40
2.75
2.53
3.91
2.57
2.48
Lock and Dam 15
3.11
2.53
2.78
2.09
1.10
2.56
3.23
1.68
1.89
2.75
1.48
2.83
Lock and Dam 16
1.91
1.83
2.20
2.71
0.92
1.60
1.67
1.24
1.55
1.78
1.27
2.04
Lock and Dam 17
3.91
1.85
2.26
5.14
0.88
2.25
1.81
1.57
2.16
2.15
1.55
1.76
Lock and Dam 18
3.07
2.89
2.62
2.88
0.97
3.17
2.53
1.47
1.25
1.80
1.60
2.11
Lock and Dam 19
1.01
0.88
1.11
1.07
0.70
0.82
0.85
0.77
0.70
0.74
0.81
0.79
Lock and Dam 20
5.31
1.97
2.65
5.16
0.99
2.25
3.43
1.76
1.71
2.17
2.72
2.38
Lock and Dam 21
2.35
2.07
2.33
1.90
1.05
3.15
3.02
1.73
1.68
1.94
2.21
2.65
Lock and Dam 22
5.06
3.06
4.21
3.43
1.76
6.62
8.32
3.53
2.90
3.83
3.64
5.20
Lock and Dam 24
6.00
2.94
4.16
3.06
1.48
5.05
4.79
3.03
4.60
2.92
2.71
4.10
Lock and Dam 25
3.76
2.86
6.51
2.93
2.68
5.78
3.94
3.07
4.82
3.81
3.23
5.71
Melvin Price (26)
7.28
1.47
1.73
1.04
2.35
5.25
0.80
0.61
0.66
8.37
2.03
3.97
Lock and Dam 27
5.17
4.30
8.32
1.26
6.31
4.49
14.42
39.09
2.33
6.51
0.96
0.79
OCR for page 80
Review of the U.S. Army Corps of Engineers Restructured Upper Mississippi River–Illinois Waterway Feasibility Study: Second Report
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
Illinois Waterway System
LaGrange
1.47
0.52
1.17
0.22
1.51
3.54
6.32
3.67
2.11
2.79
4.61
2.47
Peoria
0.84
0.50
1.10
0.13
1.40
2.23
2.48
2.19
1.04
1.30
1.62
1.21
Starved Rock
0.85
0.91
0.84
1.12
1.54
1.70
0.95
1.38
1.16
1.29
1.35
1.53
Marseilles
1.35
1.14
1.24
1.35
1.60
2.18
1.02
1.61
1.52
1.68
1.72
2.02
Dresden Island
0.77
0.77
0.74
0.68
1.08
2.47
0.79
0.87
1.11
1.01
1.04
1.36
Brandon Road
0.93
0.89
0.94
1.24
1.67
2.38
0.95
1.19
1.34
1.28
1.45
1.73
Lockport
1.08
1.02
1.09
1.30
1.91
2.69
1.10
1.35
1.81
1.38
1.99
1.73
Thomas J.O’Brien
0.04
0.05
0.07
0.06
0.08
0.07
0.08
0.07
0.08
0.05
0.06
0.05
aAverage delay= average time from arrival to start of lockage. SOURCE: USACE, 2004.
Representative terms from entire chapter:
dadnakcol dadnakcol