Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter.
Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.
OCR for page 1
Summary
C oal is the world's most abundant fossil fuel and the largest single source
of fuel for electricity production in the United States. More than 90
percent of the coal mined in the United States is used by commercial
power plants to generate electricity.
A by-product of coal combustion is the formation of coal combustion resi-
dues (CCRs), the noncombustible portion of the coal itself and residues from
various air pollution control technologies. The amount of CCRs produced annu-
ally is currently more than 120 million tons, which is enough to fill about one
million railroad coal cars. This amount will likely continue to increase as demand
for coal-based energy in the United States grows and as air pollution control
technologies for capturing residues are more widely used.
The management of large volumes of CCRs is a challenge, particularly for
utilities that must dispose offsite or find secondary uses for this material. Coal
combustion residues can be recycled for use into engineering applications or
products such as cement or wallboard, which relaxes disposal needs. The remain-
der must be disposed in landfills, surface impoundments, or mines. Each method
for disposing of CCRs has advantages and disadvantages in terms of cost and
potential impacts. Placement of CCRs in mines for mine reclamation, the focus of
this study, is not currently a major national practice. However, the use of CCR in
mine reclamation has been increasing (ACAA, 1995, 2005a; PADEP, 2004). The
committee concluded that putting CCRs in coal mines as part of the reclamation
process is a viable management option as long as (1) CCR placement is properly
planned and is carried out in a manner that avoids significant adverse environ-
mental and health impacts and (2) the regulatory process for issuing permits
1
OCR for page 2
2 MANAGING COAL COMBUSTION RESIDUES IN MINES
SIDEBAR S.1
Statement of Task
In response to a request from Congress, the National Research Council conduct-
ed a study that examined the health, safety, and environmental risks associated with
using coal combustion wastes (CCWs)a for reclamation in active and abandoned
coal mines. The study looked at the placement in abandoned and active, surface
and underground coal mines in all major coal basins. The study considered coal
mines receiving large quantities of coal combustion wastes. The committee focused
its efforts on coal combustion wastes from utility power plants and independent pow-
er producers, rather than small business, industries, and institutions. A profile of the
utility industry was taken into consideration in designing the study to focus on the
sources producing the greatest quantities of coal combustion wastes.
Specifically, the committee addressed the following points:
1. The adequacy of data collection from surface-water and groundwater
monitoring points established at CCW sites in mines.
2. The impacts of aquatic life in streams draining CCW placement areas and
the wetlands, lakes, and rivers receiving this drainage.
3. The responses of mine operators and regulators to adverse or unintended
impacts such as the contamination of groundwater and pollution of surface waters.
4. Whether CCWs and the mines they are being put in are adequately char-
acterized for such placement to ensure that monitoring programs are effective and
groundwater and surface waters are not degraded.
5. Whether there are clear performance standards set and regularly as-
sessed for projects that use CCW for "beneficial purposes" in mines.
includes clear provisions for public involvement. The main advantages of CCR
mine placement are (1) it can assist in meeting reclamation goals (such as
remediation of abandoned mine lands), and (2) it avoids the need, relative to
landfills and impoundments, to disrupt undisturbed sites. However, the place-
ment of CCRs in coal mines is a multidimensional issue that involves consider-
ation of potential human health and environmental impacts, as well as a compari-
son to the economic, health, and environmental impacts from other uses or
disposal options.
Concerns about the potential public health and environmental risks associ-
ated with using CCRs for reclamation in active and abandoned coal mines led
Congress to direct the Environmental Protection Agency (EPA) to commission
an independent study to examine this topic (Sidebar S.1). As a result, the National
Research Council established the Committee on Mine Placement of Coal Com-
bustion Wastes study to address issues outlined in the statement of task.
OCR for page 3
SUMMARY 3
6. The status of isolation requirements and whether they are needed.
7. The adequacy of monitoring programs including:
a. The status of long-term monitoring and the need for this monitoring
after CCW is placed in abandoned mines and active mines when place-
ment is completed and bonds released;
b. Whether monitoring is occurring from enough locations;
c. Whether monitoring occurs for relevant constituents in CCW as de-
termined by characterization of the CCW; and
d. Whether there are clear, enforceable corrective actions standards
regularly required in the monitoring.
8. The ability of mines receiving large amounts of CCW to achieve econom-
ically productive post-mine land uses.
9. The need for upgraded bonding or other mechanisms to assure that ade-
quate resources are available for adequate periods to perform monitoring and ad-
dress impacts after CCW placement or disposal operations are completed in coal
mines.
10. The provisions for public involvement in these questions at the permitting
and policy-making levels and any results of that involvement.
11. Evaluation of the risks associated with contamination of water supplies
and the environment from the disposal or placement of coal combustion wastes in
coal mines in the context of the requirements for protection of those resources by
the Resource Conservation and Recovery Act (RCRA) and the Surface Mining
Control and Reclamation Act (SMCRA).
aAlthough the term "coal combustion wastes" (CCWs) was used in the statement
of task, after much discussion the committee chose to use the term "coal combus-
tion residue" (CCR) for the purpose of this report. This term was chosen to avoid
implying that these materials are destined for particular fates.
POTENTIAL IMPACTS FROM COAL COMBUSTION RESIDUE
PLACEMENT IN MINES
Coal combustion residues (CCRs) may be effective in neutralizing acid mine
drainage and, therefore, reducing the overall transport of contaminants from acid-
generating mine sites. However, CCRs often contain a mixture of metals and
other constituents in sufficient quantities that they may pose public health and
environmental concerns if improperly managed. In a mine setting, subsurface
water flow is the primary mechanism for transporting contaminants from CCRs
to potential human and ecological receptors. Risks to human health and ecosys-
tems may occur when CCR-derived contaminants enter drinking water supplies,
surface water bodies, or biota. Impacts on downgradient water quality will de-
pend on the concentration of the contaminant, the flow rate and volume of con-
taminated water entering the flow system, and the ability of the aquifer or receiv-
OCR for page 4
4 MANAGING COAL COMBUSTION RESIDUES IN MINES
ing water body to dilute or attenuate the contamination. The concentration, vol-
ume, and flow rate of contaminated water, in turn, depend on the leachable mass
of toxic constituents in the CCR, the emplacement design, and the local
hydrogeologic setting.
Of the three methods currently available for disposal of CCRs (surface im-
poundments, landfilling, and minefilling), comparatively little is known about the
potential for minefilling to degrade the quality of groundwater and/or surface
waters particularly over longer time periods. Additionally, there are insufficient
data on the contamination of water supplies by placement of CCRs in coal mines,
making human risk assessments difficult. The committee was presented with
numerous testimonies in which public citizens, industry, and state regulatory
agencies disagreed about the extent of the degradation of water quality associated
with CCR placement in mines. The Environmental Protection Agency (EPA) has
not identified any cases in which water quality standards were not met as a direct
result of CCR mine placement. However, the committee's review of literature
and damage cases recognized by EPA supports the EPA's concerns about proper
management of CCRs.
Thus, the committee concludes that the presence of high contaminant levels
in many CCR leachates may create human health and ecological concerns at or
near some mine sites over the long term. The two most common CCR disposal
options, surface impoundments and landfills, provide insights into the types of
issues that can emerge when the soluble constituents of CCRs are not contained
within the waste management system. Although disposal conditions may differ
substantially from mine settings, landfills and surface impoundments are useful
for understanding the specific conditions under which CCRs can potentially im-
pact humans and ecosystems. The EPA has identified numerous cases of water
contamination related to CCR landfills and surface impoundments that, in many
cases, have caused considerable environmental damage. In some landfill settings,
groundwater has been degraded to the point that drinking water standards were
exceeded off-site. In other landfills and surface impoundments, contamination of
surface waters has resulted in considerable environmental damage; in the most
extreme cases, multiple species have experienced local extinctions. Such cases
are instructive because these impacts can be clearly related to CCR disposal, and
they help guide the selection of mining environments for CCR placement that are
most protective of human and ecological health.
PLANNING FOR CCR USE
A variety of steps are involved in planning for and managing the use of
CCRs as minefill. The report discusses practices that could reduce the potential
impacts associated with the use of CCRs in reclamation.
OCR for page 5
SUMMARY 5
CCR Disposal and Use Options
A variety of alternative uses and disposal options is available for CCR,
including its secondary use for the manufacture of products or its disposal in
landfills, surface impoundments, and mines. The chemical and physical charac-
teristics of a particular CCR stream, coupled with consideration of issues such as
the demands for alternate uses, costs and locations of disposal options, and the
local regulatory environment, are keys to determining the best option for CCRs.
In its 2000 regulatory determination, EPA concluded that CCRs used for benefi-
cial purposes other than minefilling should remain exempt from regulation as a
hazardous waste under the Resource Conservation and Recovery Act (RCRA).
They further determined that in many uses, CCRs would be bound or encapsu-
lated in construction materials and, therefore, were not likely to present a signifi-
cant risk to human health or the environment. Although the focus of this study is
the use of CCRs as minefill, the loss of valuable residues to the waste stream may
represent missed opportunities for waste reduction and environmentally sound
management. Therefore, the committee recommends that secondary uses of
CCRs that pose minimal risks to human health and the environment be
strongly encouraged.
Many CCRs are not suitable for secondary uses and must be disposed in
landfills, impoundments, or mines. In cases where placement in a mine site
during reclamation is determined to be a viable option, an integrated process of
CCR characterization, site characterization, management of placement activities,
and post-placement monitoring is required. The volume of CCR material to be
used and the relative risk that emerges from the site and material characterization
should help determine the level of additional effort that will be required to man-
age and monitor the mine site.
While recognizing the potential risk of negative environmental impacts associ-
ated with CCR minefilling, it has been shown that, in some cases, benefits can
accrue and should be considered in the permitting process. Some states have desig-
nated the use of CCR in the reclamation of coal mines as a beneficial use. The
evaluation of risks and benefits is always a complicated analysis, compounded by
determining who may bear the risks and who may accrue the benefits. The process
for permitting beneficial use varies among the states, and in many states, the desig-
nation of beneficial use may limit the regulation or oversight of CCR placement.
With regard to CCR placement in minefills, the committee concludes that while
potential advantages should not be ignored, the full characterization of possible
risks should not be cut short in the name of beneficial use.
Characterizing a Mine Site Disposal Option
Characterization of the CCR material and the mine placement site is essential
to engineering design, permitting decisions, reclamation management, and the
OCR for page 6
6 MANAGING COAL COMBUSTION RESIDUES IN MINES
development of monitoring programs. Successful predictions of CCR behavior in
the mine environment require a thorough understanding of the complex physical
and biogeochemical processes, associated primarily with subsurface flow, that
control the release and transport of CCR-derived constituents. The mobility of
CCR-derived constituents varies widely in the mine environment depending on
the physical and chemical characteristics of the CCRs and geologic materials,
and the pH, oxidation-reduction potential, and chemical composition of the water
encountered at a mine site. All of these factors must be considered in characteriz-
ing the mine site disposal option.
CCR Characterization
The characterization of CCRs involves analyses of bulk chemical and physi-
cal properties, including trace element leaching potential, cementitious proper-
ties, and any other ash characteristics (i.e., permeability upon compaction) that
might impact their behavior in the mine setting. To contribute to evaluation of
the risk of placing CCRs at mine sites, the committee recommends that
CCRs be characterized prior to significant mine placement and with each
new source of CCRs. The CCR characterization should continue periodi-
cally throughout the mine placement process to assess any changes in CCR
composition and behavior.
Leaching tests are commonly applied to assess the potential release of trace
elements from CCRs. The limitations of single-point batch tests are well recog-
nized, although they remain in widespread use and have a major role in the
regulation of CCR mine placement in many states. Alternative leaching methods
are being developed to address these limitations but, until they are more thor-
oughly evaluated, the committee suggests some simple improvements to current
leaching protocols. In particular, the CCR characterization methods used should
provide contaminant leaching information for the range of geochemical condi-
tions that will occur at the CCR placement site and in the surrounding area, both
during and after placement. Samples that exceed pre-determined leaching criteria
should be rejected for mine placement, although samples that meet the criteria
may still need additional evaluation depending on the potential risks of CCR
placement determined from the site characterization.
Site Characterization
Site characterization is a dynamic process of developing and continually
refining a site conceptual model that captures the relevant aspects affecting the
behavior of CCRs in the mine environment. When integrated with CCR charac-
terization data, site characterization provides the information necessary to locate
the best places within the mine for placing CCRs, to design the CCR emplace-
ment, and to develop the monitoring plans. Current site characterization require-
OCR for page 7
SUMMARY 7
ments under the Surface Mining Control and Reclamation Act (SMCRA) focus
on assessing the potential impacts of coal mining and reclamation but do not
specifically address the impacts of CCR placement.
The committee recommends that comprehensive site characterization
specific to CCR placement be conducted at all mine sites prior to substantial
placement of CCRs. Site characterization should encompass a full description of
the hydrogeological setting, including aquifer locations and groundwater flow
patterns, surface-water drainage and flow, and soil and overburden characteriza-
tion. Site characterization should define the mine site hydrogeology and geochem-
istry in both undisturbed areas and reclaimed mining areas and should also con-
sider local factors, such as surrounding land use, proximity to human and
ecological receptors, and designated future land use. In addition, site character-
ization should assess the potential for human exposure to drinking water impacts
that might occur related to CCR placement.
CCR Use in Reclamation Operations
The site and material characterization data, including the description of the
hydrogeological and biogeochemical setting of the mine and the bulk chemical
and physical properties of the CCRs, should be integrated to develop a plan for
CCR placement. The engineering design should consider the mass of material to
be placed as well as placement locations within the mine site. This plan should be
informed by the risks associated with the site and the CCR material present.
Reclamation
The use of CCR for minefill should be viewed in the context of general
reclamation management activities. The primary reclamation operations most
readily impacted by CCR placement are backfilling and grading, topsoil re-
placement, and revegetation. The disposal of CCRs in coal mines occurs under
highly variable conditions, ranging from small quantities to massive minefills,
from arid to wet regions, from remote to semiurban locations, from surface to
underground mines, and from active to abandoned mines. Thus, the committee
endorses the concept of site-specific management plans, including site-spe-
cific performance standards. A flexible approach to managing CCRs in mine
sites has advantages since it can embrace the unique characteristics of the
CCRs, the total mass of CCRs, and the environment into which they are placed.
However, the need to incorporate site-specific factors should not be a basis for
adopting management plans that lack rigor. Such plans should be developed in
compliance with enforceable standards for using CCRs in minefilling, as rec-
ommended below.
In addition, many issues should be considered when CCRs are used in recla-
mation. The following are some examples:
OCR for page 8
8 MANAGING COAL COMBUSTION RESIDUES IN MINES
· Do the characteristics of the site and CCR material make mine placement
a viable disposal option?
· Is simple backfilling mixed with mine spoil adequate or are more con-
trolled placement approaches needed?
· Should the cementitious properties of the ash be enhanced to minimize
interaction with groundwater?
· Should the CCRs be put down in small lifts and compacted to lessen its
hydraulic conductivity and reduce contaminant transport?
· Can CCRs be emplaced in a manner that neutralizes acidity at the mine
over the long term and reduces overall contaminant transport?
· Will placement of CCRs above the water table be sufficient to minimize
contaminant transport, given local recharge rates?
· Are additional bonding or other financial assurances necessary to cover
potential off-site contamination from CCRs?
Given the known impacts that can occur when CCRs react with water in
surface impoundments and landfills, special attention should be paid in reclama-
tion operations to the interactions of water with CCRs. Specifically, the commit-
tee recommends that CCR placement in mines be designed to minimize
reactions with water and the flow of water through CCRs. Several methods
are described for reducing the interaction of CCRs with water, including place-
ment well above the water table, compaction and cementation, and the use of
liners and low-permeability covers. In all cases, proper covers should be placed
over CCRs to prevent erosion as well as root penetration by plants and subse-
quent upward mobilization of CCR constituents. However, the committee recog-
nizes that none of these methods will totally prevent CCRs from coming into
contact with infiltrating water.
Monitoring
Monitoring is an essential tool to confirm predictions of contaminant behav-
ior and detect if and to what extent contaminants are moving into the surrounding
environment. Because SMCRA monitoring regulations are not very prescriptive,
states have a great degree of flexibility and control, and monitoring programs
required at CCR mine placement sites vary widely by state. Based on its reviews
of CCR post-placement monitoring at many sites visited during the course of this
study, the committee concludes that the number of monitoring wells, the spatial
coverage of wells, and the duration of monitoring at CCR minefills are generally
insufficient to accurately assess the migration of contaminants. Additionally, the
committee found quality assurance and control and information management
procedures for water quality data at CCR mine placement sites to be inadequate.
The committee believes that a more robust and consistent monitoring pro-
gram is needed in situations involving CCR mine placement. The committee
OCR for page 9
SUMMARY 9
recommends that the number and location of monitoring wells, the fre-
quency and duration of sampling, and the water quality parameters selected
for analysis be carefully determined for each site, in order to accurately
assess the present and potential movement of CCR-associated contaminants.
Such an approach would also allow the specifics of the monitoring plan to be
tailored to accommodate the unique combination of CCR characteristics, em-
placement techniques, and overall site characteristics, while considering esti-
mates of ecological and human health risks and the uncertainties in the site
conceptual model.
Although monitoring plans should be site-specific, downgradient wells
should be sited with an understanding of the travel times for contaminants to
reach these monitoring points. Depending on the individual site characteristics
and the distances to downgradient wells, a longer duration of groundwater moni-
toring may be necessary at some sites to adequately assess the temporal release of
contaminants, which can occur over several decades. To address these concerns,
several monitoring points should be established along predicted flow paths that
will yield early (i.e., during the established bonding period) information that can
be used to confirm predicted CCR leachate transport. At least one well or lysim-
eter, and preferably two, should be placed directly in the CCR to assess the field
leaching behavior and confirm predicted contaminant flux. As part of the moni-
toring plan, quality assurance and control plans should be developed prior to
CCR placement with clearly defined protocols for sampling and analysis, for data
validation, and for managing systematic errors in analytical procedures.
Performance Assessment
The committee recommends that the disposal of CCRs in coal mines be
subject to reasonable site-specific performance standards that are tailored to
address potential environmental problems associated with CCR disposal. In
areas where CCR leachate may interact with surface water (directly or through
groundwater interaction), more stringent requirements may be necessary to protect
aquatic life. Where violations of permit requirements or performance standards
occur, authority for appropriate penalties or corrective actions must be available to
mitigate the damage and prevent future violations.
CCR Use in Abandoned Mine Lands and Re-Mining Sites
Any regulatory standards for CCR use adopted under SMCRA for active
coal mining would most likely apply to remining activities but would not apply
directly to CCR use in abandoned mine lands. To ensure adequate protection of
ecological and human health, the committee recommends that placement of
CCRs in abandoned and remining sites be subject to the same CCR charac-
terization, site characterization, and management planning standards rec-
OCR for page 10
10 MANAGING COAL COMBUSTION RESIDUES IN MINES
ommended for active coal mines. However, when developing performance stan-
dards, adequate consideration should be given to the significant differences be-
tween active mines, abandoned mines, and the remining of previously abandoned
mine sites. At such abandoned mine sites, the CCR placement process begins
with a degraded site, and the same management options available in an active
mine site may not always be feasible. The plans should consider the benefits of
CCR use for reclamation at these degraded sites but should also factor in the
potential adverse impacts of CCRs.
OVERARCHING ISSUES AND CONCERNS
Research
The committee considered a variety of information in its deliberations in-
cluding: published technical reports; letters and reports (in both final and draft
form); data compilations (both formal and informal materials); and other materi-
als from citizens' groups, industry groups, and state and federal regulatory agen-
cies. Much remains unknown about the long-term behavior of CCRs and their
potential impacts in the mine setting. In addition, predictive characterization
tools (e.g., leaching tests) are not adequate to guide management decision mak-
ing. Available information is typically from short-term field or laboratory-based
studies. In many cases there were differences in interpretation of the data and, in
several cases, clear discrepancies in the data themselves. The committee often
found itself wanting additional information that was not available.
The committee recommends that research be conducted to provide more
information on the potential ecological and human health effects of placing
CCRs in coal mines. Specific attention in such a research program should be
directed at improved understanding of the following:
1. The environmental behavior of CCR at mine sites under differing climatic
and geologic settings, to identify the types of mine settings, CCRs, and placement
techniques that are most protective of human and ecological health. This research
should include studies to determine under what conditions CCRs can effectively
ameliorate the adverse effects of acid mine drainage in surface waters, particu-
larly over protracted time scales. This research should also include the applica-
tion of existing reactive transport models to CCR mine placement sites to evalu-
ate whether the transport and reaction processes in the model adequately describe
the processes taking place at CCR mine disposal sites, including those processes
that occur over protracted time scales.
2. The potential ecological and human health effects of placing CCR in coal
mines--this program should include studies to clarify the fate and transport of
contaminants from CCRs and the potential for human exposure from contami-
nated drinking water. It should include studies to determine the effects (or lack
OCR for page 11
SUMMARY 11
thereof) on biological communities over protracted time scales in mine place-
ment sites where nearby streams or wetlands are likely to be connected to ground-
water.
3. The continuous improvement and field validation of leaching tests for
better prediction of the mobilization of constituents from CCRs in mine set-
tings--specifically, post-placement field studies should be conducted that would
allow the comparison of leaching test results to detailed water quality monitoring.
Public Participation
In recognition of public concern over the potential for adverse environmental
and health impacts from improper CCR disposal, government agencies respon-
sible for regulating CCRs should ensure that the public receives adequate ad-
vance notice of any proposals to dispose of CCRs in mine sites. The committee
recommends that any proposal to dispose of substantial quantities of CCRs
in coal mines be treated as a "significant alteration of the reclamation plan"
under SMCRA. This will ensure that the public is afforded adequate notice and
an opportunity to comment officially on the CCR placement proposal.
Alternatives for Regulatory Authority
The SMCRA and RCRA are the basic federal laws for mine reclamation and
environmental protection that can be applied to placement of CCRs in coal mines.
Activities such as mining and environmental protection involve locally specific
conditions that can be difficult to address through national rules. Hence, many
federal programs are delegated to the states for their implementation to enable
more focused incorporation of local conditions and needs. Neither SMCRA nor
its implementing regulations, however, currently address the use or placement of
CCRs in an explicit manner. As a consequence, states vary in their approach and
in the rigor with which they address CCR use in mines.
After reviewing the laws and other relevant literature, the committee con-
cludes that although SMCRA does not specifically regulate CCR placement at
mine sites, its scope is broad enough to encompass such regulation during recla-
mation activities. Furthermore, while SMCRA and its implementing regulations
indirectly establish performance standards that could be used to regulate the
manner in which CCRs may be placed in coal mines, neither the statute nor those
rules explicitly address regulation of the use or placement of CCRs, and some
states have expressed concern that they do not have the authority to impose
performance standards specific to CCRs. Therefore, the committee recommends
that enforceable federal standards be established for the disposal of CCRs in
minefills. Enforceable federal standards will ensure that states have adequate,
explicit authority and that they implement adequate minimum safeguards. As
with current federal regulations, these rules should provide sufficient flexibility
OCR for page 12
12 MANAGING COAL COMBUSTION RESIDUES IN MINES
to allow states to adapt permit requirements to site-specific conditions, while
providing the needed focus on the protection of ecological and human health.
There are three primary regulatory mechanisms that could be used to develop
enforceable standards:
· Changes to SMCRA regulations to address CCRs specifically;
· Joint Office of Surface Mining (OSM) and EPA rules pursuant to the
authority of SMCRA and RCRA; or
· RCRA-D rules that are enforceable through a SMCRA permit.
Under SMCRA, the OSM and related state agencies that implement SMCRA
currently have the regulatory framework in place to deal with CCRs used in mine
reclamation, and have considerable expertise in review, permitting, and manage-
ment of mine lands. On the other hand, under RCRA, EPA and its counterpart
state and local agencies have developed significant technical and regulatory ex-
pertise in monitoring and oversight of waste disposal operations (e.g., landfills)
that involve groundwater and toxic substances. Regardless of the regulatory
mechanism selected, coordination between OSM and EPA efforts is needed and
would foster regulatory consistency with EPA's intended rule-making proposals
for CCR disposal in landfills and impoundments.
In all cases, guidance documents will also be necessary to help states imple-
ment their responsibility for managing CCR. However, guidance alone is not ad-
equate to achieve the needed improvements in state programs for CCR minefills.
Only through enforceable standards can acceptable minimum levels of environ-
mental protection from CCR placement in coal mines be guaranteed nationally.
CONCLUSIONS
The committee believes that placement of CCR in mines as part of coal mine
reclamation may be an appropriate option for the disposal of this material. In such
situations, however, an integrated process of CCR characterization, site charac-
terization, management and engineering design of placement activities, and de-
sign and implementation of monitoring is required to reduce the risk of contami-
nation moving from the mine site to the ambient environment. Enforceable federal
standards are needed for the disposal of CCRs in minefills to ensure that states
have specific authority and that states implement adequate safeguards.