| Copyright © 2009. National Academy of Sciences. All rights reserved. Terms of Use and Privacy Statement |
Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter.
Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.
OCR for page 277
Prepublication Copy—Subject to Further Editorial Correction
Figures
277
OCR for page 278
OCR for page 279
Prepublication Copy—Subject to Further Editorial Correction
200
162
160
Number of sites
129
120
82
80
40 17
0
800 to 2200 2200 to 4000 4000 to 7000 > 7000
Biomass availability (dry tons per day) within 40 miles
FIGURE S-1 Number of sites in the United States with a potential to supply indicated
daily amounts of biomass within a 40-mile radius.
BIOCHEMICAL CONVERSION INDIRECT THERMOCHEMICAL CONVERSION
FEEDSTOCK
BIOMASS
Coal, Biomass, or Coal and Biomass
Plant sugar/starch Lignocellulose
PRETREATMENT
Liquefaction Pretreatment
Processing, drying
SACCHARIFICATION
CO2
Glucoamylase Cellulolytic Enzymes GASIFICATION
Syngas
FERMENTATION FISCHER – TROPSCH (FT) METHANOL SYNTHESIS
CO2 DISTILLATION
UPGRADING METHANOL TO GASOLINE
ETHANOL BIOBUTANOL
MTG
Example of second generation
cellulosic biofuel
GASOLINE
GASOLINE
DIESEL
FIGURE S-2 Steps involved in biochemical conversion of biomass and indirect
thermochemical conversion of coal, biomass, and coal plus biomass to liquid
transportation fuels.
279
OCR for page 280
Prepublication Copy—Subject to Further Editorial Correction
FIGURE S-3 Supply function for biomass feedstocks in 2020.
280
OCR for page 281
Prepublication Copy—Subject to Further Editorial Correction
Per Barrel Cost Gasoline Equivalent Product Cost (With No Carbon Price)
$180
Carbon Storage Cost
Additional Transportation Cost
$160 Non-Feedstock Oper Cst
Capital Cost
Feedstock Cost
Total Cost
$140
$120
$100
$80
$60
$40
$20
$0
-$20
-$40
FIGURE S-4 Costs of alternative liquid fuels produced from coal, biomass, or coal and
biomass with zero carbon price.
281
OCR for page 282
Prepublication Copy—Subject to Further Editorial Correction
Net CO2 (Tonnes per Gasoline Equivalent BBL)
1.20
1.00 1.06
0.88
0.80
0.60
0.49 0.47
0.40 0.44 0.42
0.42
0.37
0.20
0.00
(0.13)
(0.13)
(0.21)
(0.25)
(0.20)
(0.40)
(0.60)
(0.76)
(0.80)
FIGURE S-5 Estimated carbon dioxide (CO2) emissions over the life cycle of
alternative fuels, from the mining and harvesting of resources to the conversion process
to the consumption of fuels.
282
OCR for page 283
Prepublication Copy—Subject to Further Editorial Correction
Per Barrel Cost Gasoline Equivalent Product Prices
CO2 cost (ignoring indirect CO2 consequences)
Carbon Storage Cost
$180 Additional Transportation Cost
Non-Feedstock Oper Cst
Capital Cost
$160 $114
Feedstock Cost
Total Cost (without carbon price) $132 $134
$140 $126
$104
$121 $121 $105 $116
$120
$104 $95 $94
$95
$100 $88
$80
$60
$40
$20
$0
-$20
-$40
FIGURE S-6 Cost of alternative liquid fuels produced from coal, biomass, or coal and
biomass with a CO2 equivalent price of $50/tonne.
283
OCR for page 284
Prepublication Copy—Subject to Further Editorial Correction
FIGURE S-7 Estimated supply of cellulosic ethanol plus corn-grain ethanol at different
price points in 2020. The red solid and dotted lines show the supply of crude oil at
$60/bbl and $100/bbl for comparison.
284
OCR for page 285
Prepublication Copy—Subject to Further Editorial Correction
FIGURE S-8 Estimated supply of gasoline and diesel produced by thermochemical
conversion via Ficher-Tropsch with or without carbon capture and storage at different
price points in 2020.
285
OCR for page 286
Prepublication Copy—Subject to Further Editorial Correction
Global Transportation
by sector
70
Average Growth Year 2005-2030
1.4% 0.7%
60
2.5%
50
1.9%
MBDOE
40
2.0%
30
20
0.3%
10
0
1980 2005 2030
Year
Rail ? Light-Duty ?
? Heavy-Duty
FIGURE 1-1 Worldwide demand for energy for transportation, 1980-2030. SOURCE:
ExxonMobil (2008). Reprinted with permission.
FIGURE 1-2 CO2 emissions from fossil-fuel combustion by different end-use sectors.
Source: EPA (2008).
286
OCR for page 287
Prepublication Copy—Subject to Further Editorial Correction
Soil Organic Matter Change
Cultivation Stover harvest
Projected with cover crops
Soil organic matter
intercropping, or other
carbon input sources
Pre-cultivation
steady-state
Projected with no-till
Management
change
With No management changes
Time
FIGURE 2-1 Conceptual diagram of how agriculture has affected soil organic matter
and what may occur after various strategies for crop-residue removal.
8
Stover to retain (ton ac- )
1
Soil organic
6 Water 5.58
Wind
4 3.56 3.52
3.38
2.34
2 1.39
1.22
0.43
0.77 0.29
0.15
0.06
0
No-tillage or Moldboard plow No-tillage or
Moldboard plow
conservation tillage conservation tillage
Continuous corn Corn-soybean
FIGURE 2-3 Tillage and crop rotation effects on the amount of corn stover required to
protect soil resources against wind or water erosion and to sustain soil carbon (organic
matter) levels. Adapted from Wilhelm et al. (2007).
287
OCR for page 312
Prepublication Copy—Subject to Further Editorial Correction
Million gallons gasoline
200000
150000
Case 1 (H2
per year
Success)
100000
Reference
50000
0
2000 2010 2020 2030 2040 2050
Year
FIGURE 9-1 Oil consumption with maximum practical penetration of HFCVs compared
with reference case. SOURCE: NRC (2008).
million gallons gasoline/y
180000
160000
140000
120000
Case 4 (Portfolio)
100000
80000 Ref
60000
40000
20000
0
2000 2010 2020 2030 2040 2050
Year
FIGURE 9-2 Oil consumption for combined HFCVs, high-efficiency conventional
vehicles, and biofuels compared with reference case. SOURCE: NRC (2008).
312
OCR for page 313
Prepublication Copy—Subject to Further Editorial Correction
FIGURE A-1 America’s Energy Future Project.
313
OCR for page 314
Prepublication Copy—Subject to Further Editorial Correction
FIGURE I-1 Schematic of processing steps for converting corn to ethanol. SOURCE:
Schwietzke et al. (2008). This material is sourced from IEA Bioenergy:T41(2):2008:01 and is
reprinted with permission from IEA Bioenergy.
314
OCR for page 315
Prepublication Copy—Subject to Further Editorial Correction
FIGURE I-2 Schematic of processing steps for converting corn to ethanol used in
SuperPro Designer with example of summary of economic evaluation report.
315
OCR for page 316
Prepublication Copy—Subject to Further Editorial Correction
Ba ckse t
En zyme
8
Eth an ol
(C el lul as e, He mic ell ul ase , etc)
Ye ast
Wa ter
1
L ign oc ell ul osi c 5
Li qu id
Bi om ass
Stea m Stea m
Ce ntrifu ga ti on
2 Pre tr ea tm en t S acch ar ifica tio n F e rmen tatio n
7
Wate r
Di sti ll atio n a nd D ryi ng
3 4 Sol ids
6
R esi du al S ol id s
FIGURE I-3: Simple schematic of cellulosic-ethanol manufacturing process. Courtesy of M.
Ladisch and colleagues (Purdue University).
FIGURE I-4 SuperPro Designer network model for cellulosic-ethanol manufacturing
process.
316
OCR for page 317
Prepublication Copy—Subject to Further Editorial Correction
FIGURE I-5 Superpro economic analysis report sample
Economic Evaluation Report June 24, 2008
For 2008jun22 Poplar- Mid
1. EXECUTIVE SUMMARY (2008 prices)
Total Capital Investment 207923000.00 $
Capital Investment Charged to This Project 207923000.00 $
Operating Cost 81119000.00 $/yr
Production Rate 119454958.36 kg MP/yr
Unit Production Cost 0.68 $/kg MP
Total Revenues 116032000.00 $/yr
Gross Margin 30.09 %
Return On Investment 10.91 %
Payback Time 9.16 years
IRR (After Taxes) 22.27 %
NPV (at 5.0% Interest) 188837000.00 $
MP = Total Flow of Stream EtOH
2. MAJOR EQUIPMENT SPECIFICATION AND FOB COST (2008 prices)
Quantity/
Standby/ Name Description Unit Cost ($) Cost ($)
Staggered
9/0/0 V-101 Stirred Reactor 669000.00 6021000.00
Vessel Volume = 783714.15 gal
9/0/0 V-102 Stirred Reactor 651000.00 5859000.00
Vessel Volume = 754229.44 gal
9/0/0 V-103 Fermentor 676000.00 6084000.00
Vessel Volume = 796094.41 gal
1/0/0 DDR-101 Drum Dryer 160000.00 160000.00
Drum Area = 59.88 m2
1/0/0 DC-101 Decanter Centrifuge 2748000.00 2748000.00
Throughput = 4400.64 L/min
1/0/0 FSP-101 Flow Splitter 0.00 0.00
Size/Capacity = 207810.03 kg/h
1/0/0 SR-101 Shredder 182000.00 182000.00
Size/Capacity = 102938.72 kg/h
1/0/0 SB-101 Solids Bin 771000.00 771000.00
317
OCR for page 318
Prepublication Copy—Subject to Further Editorial Correction
Vessel Volume = 12110.44 m3
1/0/0 C-101 Distillation Column 4782000.00 4782000.00
Column Volume = 182.20 m3
1/0/0 V-104 Seed Fermentor 7200000.00 7200000.00
Vessel Volume = 13056.19 L
1/0/0 Burner Generic Box 9290000.00 9290000.00
Size/Capacity = 1352538.12 kg/h
2/0/0 HX-102 Heat Exchanger 23000.00 46000.00
Heat Exchange Area = 95.36 m2
2/0/0 HX-103 Heat Exchanger 14000.00 28000.00
Heat Exchange Area = 51.18 m2
1/0/0 MX-101 Mixer 0.00 0.00
Size/Capacity = 182244.79 kg/h
1/0/0 HX-105 Heat Exchanger 90000.00 90000.00
Heat Exchange Area = 5488.56 m2
1/0/0 MX-102 Mixer 0.00 0.00
Size/Capacity = 205863.81 kg/h
1/0/0 MX-103 Mixer 0.00 0.00
Size/Capacity = 127857.22 kg/h
1/0/0 Steam Turbine Generic Box 13530000.00 13530000.00
Size/Capacity = 1350432.04 kg/h
Unlisted Equipment 0.00
TOTAL 56791000.00
3. FIXED CAPITAL ESTIMATE SUMMARY (2008 prices in $)
3A. Total Plant Direct Cost (TPDC) (physical cost)
1. Equipment Purchase Cost 56791000.00
2. Installation 8480000.00
3. Process Piping 17037000.00
4. Instrumentation 11358000.00
5. Insulation 1704000.00
6. Electrical 8519000.00
7. Buildings 11358000.00
8. Yard Improvement 1136000.00
9. Auxiliary Facilities 0.00
TPDC 116383000.00
3B. Total Plant Indirect Cost (TPIC)
10. Engineering 11638000.00
11. Construction 29096000.00
TPIC 40734000.00
3C. Total Plant Cost (TPC = TPDC+TPIC)
TPC 157117000.00
3D. Contractor's Fee & Contingency (CFC)
12. Contractor's Fee 7856000.00
318
OCR for page 319
Prepublication Copy—Subject to Further Editorial Correction
13. Contingency 23552000.00
CFC = 12+13 31407000.00
3E. Direct Fixed Capital Cost (DFC = TPC+CFC)
DFC 188524000.00
4. LABOR COST - PROCESS SUMMARY
Unit Cost Annual Amount Annual Cost
Labor Type %
($/h) (h) ($)
Operator 0.00 0.00 0.00 0.00
Biomass Operators 20.00 1744.00 34880.00 0.88
Shift Operator 34.00 69760.00 2371840.00 59.53
Lab Technitians 45.00 5886.00 264870.00 6.65
Maintenance 40.85 23326.00 952867.00 23.92
Plant Supervisor 60.00 5995.00 359700.00 9.03
TOTAL 106711.00 3984157.00 100.00
5. MATERIALS COST - PROCESS SUMMARY
Unit Cost Annual Amount Annual Cost
Bulk Material %
($/kg) (kg) ($)
Cellulase 2.49 4026493.00 10004063.00 23.64
poplar 0.04 897625670.00 31416898.00 74.25
Water 0.00 691548911.00 30428.00 0.07
Yeast 2.30 373412.00 858848.00 2.03
Recovered Steam 0.00 9999000000.00 0.00 0.00
Air 0.00 1552967692.00 0.00 0.00
Sugar Water 0.00 1149931.00 0.00 0.00
Trychomonas 2.30 115.00 264.00 0.00
TOTAL 13146692225.00 42310502.00 100.00
NOTE: Bulk material consumption amount includes material used as:
- Raw Material
- Cleaning Agent
- Heat Tranfer Agent (if utilities are included in the operating cost)
6. VARIOUS CONSUMABLES COST (2008 prices) - PROCESS SUMMARY
THE CONSUMABLES COST IS ZERO.
319
OCR for page 320
Prepublication Copy—Subject to Further Editorial Correction
7. WASTE TREATMENT/DISPOSAL COST (2008 prices) - PROCESS SUMMARY
THE TOTAL WASTE TREATMENT/DISPOSAL COST IS ZERO.
8. UTILITIES COST (2008 prices) - PROCESS SUMMARY
Annual Cost
Utility Annual Amount Reference Units %
($)
Electricity 56,800,000 kWh 0.00 0.00 6 MW
Available Energy from Steam 475,974,147 kWh 0.00 0.00 54 MW
Usable Steam Energy (80%) 380,779,318 kWh 0.00 0.00 43 MW
Remaining Steam Energy 323,979,318 kWh 0.00 0.00 37 MW
Sales Price of Electricity 0.05 $/kWh 0.00 0.00
Revenue from Electicity 16,198,966 $ 0.00 0.00
Steam 0.00 kg 0.00 0.00
Steam (High P) 652362127.00 kg 0.00 0.00
Cooling Water 63753240963.00 kg 3187662.00 99.33
Chilled Water 0.00 kg 0.00 0.00
TOTAL 3209010.00 100.00
320
OCR for page 321
Prepublication Copy—Subject to Further Editorial Correction
9. ANNUAL OPERATING COST (2008 prices) - PROCESS SUMMARY
Cost Item $ %
Raw Materials 42311000.00 52.16
Labor-Dependent 3984000.00 4.91
Facility-Dependent 31616000.00 38.97
Consumables 0.00 0.00
Waste Treatment/Disposal 0.00 0.00
Utilities 3209000.00 3.96
Miscellaneous 0.00 0.00
Advertising/Selling 0.00 0.00
Running Royalties 0.00 0.00
Failed Product Disposal 0.00 0.00
TOTAL 81119000.00 100.00
10. PROFITABILITY ANALYSIS (2008 prices)
A. Direct Fixed Capital 188524000.00 $
B. Working Capital 4087000.00 $
C. Startup Cost 11311000.00 $
D. Up-Front R&D 0.00 $
E. Up-Front Royalties 4000000.00 $
F. Total Investment (A+B+C+D+E) 207923000.00 $
G. Investment Charged to This Project 207923000.00 $
321
OCR for page 322
Prepublication Copy—Subject to Further Editorial Correction
H. Revenue Stream Flowrates
Total flow of stream EtOH 119454958.00 kg/yr
Total flow in Steam 10153761372.00 kg/yr
Total Production of Recovered Steam 9,999,000,000 kg/yr
Total Energy Conternt of Recovered Steam 2,844,215,150,040KJ/yr
Total Requirements of Steam (High P) 652,362,126 kg/yr
Total Energy Conternt of Steam (High P) 1,130,708,220,559 kJ/yr
Total Energy Left over for Electricity 1,713,506,929,481 kJ/yr
I. Production Unit Cost
EtOH 0.68 $/kg
J. Selling / Processing Price
Total flow of stream EtOH 0.84 $/kg
Total flow in Steam 1.60 $/1000 kg
K. Revenues
EtOH 99833000.00 $/yr
Steam 16199000.00 $/yr
Total Revenues 116032000.00 $/yr
L. Annual Operating Cost
AOC 81119000.00 $/yr
M. Gross Profit (K-L) 34913000.00 $/yr
N. Taxes (35%) 12220000.00 $/yr
O. Net Profit (M-N) 22694000.00 $/yr
Gross Margin 30.09 %
Return On Investment 10.91 %
Payback Time 9.16 years
322