Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter.
Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.
OCR for page 57
Supporting Materials and Worksheets 57
Worksheet 4: Logistical Considerations (continued)
Table 12. Alternative jet fuel project option--supply of alternative jet fuel
to airport.
Option:
Transportation Transportation Mode and Distance of Transportation Mode and Distance
Infrastructure Feedstock To: of Finished Alternative Jet Fuel
from Processing Plant To:
Intermediate Processing Plant Intermediate Airport
Storage (If Needed) Storage (If Needed)
Truck
Rail
Barge
Pipeline
Other
Existing or
new?
Storage Storage of Feedstock At: Storage of Finished Alternative Jet
Infrastructure Fuel At:
Intermediate Processing Plant Intermediate Airport
Location (If Storage (If Needed)
Needed)
Existing or
new?
Notes:
- For transportation options, indicate approximate distances. Also, indicate if the airport expects to build
any new transportation infrastructure in the foreseeable future.
- Indicate if the airport expects to build any new storage infrastructure in the foreseeable future.
Worksheet 4 grading (green, yellow, or red)
5.2.5 Worksheet 5: Financial Considerations
Instructions
1. Use one worksheet for each alternative jet fuel project option under consideration.
2. Start with Step 1 in Figure 8 and follow the arrows in the diagram according to the answers
to the questions.
3. Grade each option according to the results of the diagram in Figure 8 (see Section 3.5.4
for more information). Repeat exercise, as necessary, as more information becomes
available.
4. Fill in the appropriate circle in the "Green," "Yellow," or "Red" column in the "Financial"
row of "Worksheet 6: Evaluation Summary."