Questions? Call 888-624-8373

PAPERBACK
list:$10.00
Web:$9.00
add to cart

PDF BOOK
your price: $8.00
add to cart

Rights & Permissions

topleft topright

Improving the Accuracy of Early Cost Estimates for Federal Construction Projects (1990)
Commission on Engineering and Technical Systems (CETS)

Page
43
bottomleft bottomright
Page
43

Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.

OCR for page 43
References Adrian, James. 1982. Construction Estimating. Englewood Clifts, NJ: Reston Publications. American Association of Cost Engineers. 1986. Cost Engineering Notebook. Morgantown, WV: American Association of Cost Engi- neers. American Society of Professional Estimators. 1987. Standard Estimating Practice. Alexandria, VA: American Society of Professional Esti- mators. Bowen, Bnan. 1984. Design and construction cost management. In Architects Handbook of Professional Practice. Washington, DC: American Institute of Architects. Bridges, Larry, and Rita Gregory. 1988. Accuracy of Cost Estimating Techniques (staff sum- mary sheet). Tyndall Air Force Base, Fly: Air Force Engineering and Services Center. Committee on Improving Preliminary Planning/ Programming in the Building Delivery Cycle. 1986. Programming Practices the Building Process. Washington, DC: National Acad- emy Press. Consulting Committee on Cost Engineering. 1983. Probabilistic Estimating in the Building Proc- ess (Federal Construction Council Technical Report No. 72~. Washington, DC: National Academy Press. Consulting Committee on Cost Engineering. 1987. Procedures Used By Federal Agencies to Prepare Budget Estimates for Construction (Federal Construction Council Technical Report No. 85~. Washington, DC: National Academy Press. Consulting Committee on Planning and Design Terminology. 1988. Glossary of Special Terms Used in Planning, Designing and Con- s~ucting Federal Facilities (Federal Construc- tion Council Technical Report No. 91~. Washington, DC: National Academy Press. Cost/Schedule Controls Task Force. 1986. Scope Definition and Control. Austin, TX: Con- smuction Industry Institute. Curran, Michael W. 1988. Range estimating: con- quenng the cost overrun. DE Technology, 49~3~. Hanscomb Associates, Inc. 1986. Indian Health Service Budget Cost Estimating System (In- struction Manual, Revision 3.0~. Rockville, MD: Department of Heals and Human Serv- ices. Helmer, Olaf. 1968. Analysis of the future: the delphi method. In Technological Forecasting for Industry and Government, James Bright, ed. Englewood Cliffs, NJ: Prentis-Hall. Jelen, Frederick C., and James H. Black. 1982. Cost and Optimization Engineering (2nd Edi- tion). New York, NY: McGraw-Hill. Parker, Donald E. 1984. Budgeting by Criteria Not Cost Per Square Foot (Conference Pa- per). Morgantown, WV: American Associa- tion of Cost Engineers. Parker, Donald E. 1987. Defining Project Scope for Effective Cost Control (Cost Engineers' 43

OCR for page 44
44 Notebook). Morgantown, WV: American Association of Cost Engineers. Public Buildings Service. 1981. Capitalized In- come Approach to Project Budgeting. Wash- ington, DC: U.S. General Services Admini- stration. Public Buildings Service. 1987. General Con- struction Cost Review Guide for Federal Of- fice Buildings—Fiscal Year 1988. Washing- ton, DC: U.S. General Services Administra- tion. RS Group, Inc. 1983. CCMAS Cost Guide (Cost Guide Primer and Cost Guide Direct Cost Modifiers). Washington, DC: United States Air Force/HQAFESC. REFERENCES Standing Committee on Contract Management. 1982. Preliminary planning for construction projects. In Transactions of the Federal Con- s~uction Council for 1980-81. Washington, DC: National Academy Press. Tri-Service Committee on Cost Estimating. 1988. Area Cost Factors and Unit Prices for FY 199~1991 Department of Defense Facilities Construction (Memo dated 10 March 1988 from Douglas Forbrother). Washington, DC: Office of the Assistant Secretary of Defense. Ante, Newton F., and Ronald A. Barry. 1985. Contemporary Estimating. American Power Conference Proceedings. Chicago, IL: Illi- nois Institute of Technology.

Representative terms from entire chapter:

cost guide