Appendix E Selected Bibliography
Alkalai, L., and M. Underwood, eds. 1995. μElectronics Systems IPDT Technology Roadmap. Pasadena, Calif.: New Millenium Program Office, NASA Jet Propulsion Laboratory.
Arno, R.D. 1996. Sorting Reason from Rhetoric in Small Spacecraft Policy, a Strictly Unofficial Assessment. Working paper presented to the Workshop to Reduce Space Science Mission Costs, Arnold and Mabel Beckman Center, Irvine, California, October 16-18.
Baker, D.N., G. Chin, and R.F. Pfaff, Jr. 1991. NASA's Small Explorer Program. Physics Today 44(Dec):44-51.
Bearden, D. 1994. Small Satellite Cost Model (SSCM) Study. Briefing presented to the 1994 NASA Cost Estimating Symposium at NASA Lyndon B. Johnson Space Center, Houston, Texas, November 7-10.
Beins, J.C. 1994. Aircraft Direct Operating Cost Study: Advanced Subsonic Technology. Briefing presented to the 1994 NASA Cost Estimating Symposium at NASA Lyndon B. Johnson Space Center, Houston, Texas, November 7-10.
Book, S.A. 1993. Do Not Sum "Most Likely" Cost Estimates. Briefing presented to the 27th Annual DOD Cost Analysis Symposium, The Aerospace Corporation, El Segundo, Calif., September 7-10.
Book, S.A., and P.H. Young. 1994. General-Error Regression for USCM-7 CER Development. Briefing presented to the 28th Annual DOD Cost Analysis Symposium, Leesburg, Va., September 21-23.
Chromik, C. 1994. Lessons Learned: Tooling for Composite Airframe Structures. Briefing presented to the 1994 NASA Cost Estimating Symposium at NASA Lyndon B. Johnson Space Center, Houston, Texas, November 7-10.
Cyr, K.J. 1994. The Role of Cost Analysis on Manned Spacecraft Development. Society of Automotive Engineers Technical Paper Series 901863. Presented to Aerospace Technology Conference and Exposition, Long Beach, Calif., October 1-4.
Dean, E.B. 1994. Inserting Economics into Multidisciplinary Design Optimization. Briefing presented to the 1994 NASA Cost Estimating Symposium at NASA Lyndon B. Johnson Space Center , Houston, Texas, November 7-10.
Dean, E.B. 1994. Proposed Metrics for the High Speed Research Program. Briefing presented to the 1994 NASA Cost Estimating Symposium at NASA Lyndon B. Johnson Space Center, Houston, Texas, November 7-10.
Dixon, B. 1994. Overview of Resource Analysis Office (RAO). Briefing presented to the 1994 NASA Cost Estimating Symposium at NASA Lyndon B. Johnson Space Center, Houston, Texas, November 7-10.
Eller, E., D. Roussel-Doupre, R. Weiss, and O. Bruegman. 1996. New ideas for affordable space missions. Aerospace America 34(4):26-31.
Fleeter, R. 1996. Some thoughts on optimizing the cost of space projects. Launchspace Magazine 1(3): 14-15.
Fryer, C. 1994. Risk Management: RAO Instrument Risk-Cost Model. Briefing presented to the 1994 NASA Cost Estimating Symposium at NASA Lyndon B. Johnson Space Center, Houston, Texas, November 7-10.
Gallagher, M.A. 1994. Multi-Variable Instrument Cost Model (MICM) Enhancements. Briefing presented to the 1994 NASA Cost Estimating Symposium at NASA Lyndon B. Johnson Space Center, Houston, Texas, November 7-10.
Garrick, B.J., et al. 1987. Space Shuttle Probabalistic Risk Assessment, Proof-of-Concept Study, Auxiliary Power Unit and Hydraulic Power Unit Analysis Report. Prepared for the National Aeronautics and Space Administration. Washington, D.C.: McDonnell Douglas and PLG, Inc.
General Accounting Office. 1992. Space Missions Require Substantially More Funding than Initially Estimated. Report to the Chairman, Subcommittee on Investigations and Oversight, Committee on Science, Space and Technology, U.S. House of Representatives. NSAID-93-97. Washington, D.C.: U.S. General Accounting Office.
Gunning, D. 1994. Overview of Goddard Space Flight Center Parametric Manpower Model. Briefing presented to the 1994 NASA Cost Estimating Symposium at NASA Lyndon B. Johnson Space Center, Houston, Texas, November 7-10.
Heller, S., G. Ball, and J. Olivieri. 1994. Instrument Cost Growth and Lessons Learned. Briefing presented to the 1994 NASA Cost Estimating Symposium at NASA Lyndon B. Johnson Space Center, Houston, Texas, November 7-10.
Hoeser, S. 1990. The cost impacts of true spaceships. Journal of Practical Applications in Space 1(4):1-38.
Isakowitz, S. 1991. International Reference Guide to Space Launch Systems, 2nd ed. New York: American Institute of Aeronautics and Astronautics.
James, L.D. 1993. DOD Space Systems: Reducing the Cost. Maxwell AFB, Ala.: Air University Press.
Johnson, N. L., and Rodvold, D. M. 1994. Europe and Asia in Space: 1993-1994. Colorado Springs, Colo.: Kaman Sciences Corporation.
Jones, K.M. 1994. Ground Systems Cost Model, Version 1.1. Briefing presented to the 1994 NASA Cost Estimating Symposium at NASA Lyndon B. Johnson Space Center, Houston, Texas, November 7-10.
Kaplan, S., et al. 1993. Probabalistic Schedule and Cost Risk Analysis for KSC Shuttle Operations. SBIR Contract No. NAS10-11984, PLG-0934. Kennedy Space Center, Fla.: NASA.
Korsmeyer, D.J. 1994 Automation Life-Cycle Cost Modeling. Briefing presented to the 1994 NASA Cost Estimating Symposium at NASA Lyndon B. Johnson Space Center, Houston, Texas, November 7-10.
Lalli, V. 1996. SARGE: Standard Assurance Requirements and Guidelines for Experiments. Cleveland, Ohio: NASA Lewis Research Center.
Laue, H.H. 1995. Towards Improved Cost-Effectiveness on Spacecraft Operations. Paper presented at 46th International Astronautical Congress, Oslo, Norway, October 2-6.
London, J.R. 1994. LEO on the Cheap. Maxwell AFB, Ala: Air University Press.
Lusignan, B.B. 1996. An International Single Stage to Orbit. Center for International Cooperation in Space, Stanford University. Working paper presented to the Workshop to Reduce Space Science Mission Costs, Arnold and Mabel Beckman Center, Irvine, Calif., October 16-18.
Lusignan, B.B. 1996. The Mars Surface Robot Marsokhod. Center for International Cooperation in Space, Stanford University. Working paper presented to the Workshop to Reduce Space Science Mission Costs, Arnold and Mabel Beckman Center, Irvine, Calif., October 16-18.
Man, G.K., ed. 1995. NASA New Millennium Autonomy Technology Roadmap. Autonomy Integrated Product Development Team D-13479. Pasadena, Calif.: NASA Jet Propulsion Laboratory.
Milsted, M. 1994. Office of Space Flight Contractor Rates and Escalation Assessment. Briefing presented to the 1994 NASA Cost Estimating Symposium at NASA Lyndon B. Johnson Space Center, Houston, Texas, November 7-10.
Musser, G.S. 1995. Faster, Better, Cheaper. Interview with Domenick J. Tenerelli. Astronomical Society of the Pacific, from the Internet.
NASA (National Aeronautics and Space Administration). 1995. OSMA Training Presentation: Design for Reliability. Cleveland, Ohio: NASA Lewis Research Center.
NASA. 1996. Communications Systems Integrated Product Development Team (IPDT) Roadmap, Version 2.0a. New Millennium Program. Pasadena, Calif.: NASA Jet Propulsion Laboratory.
NASA. 1996. Instrument Technologies and Architectures Technology Roadmap. New Millennium Program. Pasadena, Calif.: NASA Jet Propulsion Laboratory.
NASA. 1996. Modular and Multifunctional Systems Integrated Product Development Team (MAMS IPDT) Technology Roadmaps. New Millenium Program, D-13447, Version 3-14-96. Pasadena, Calif.: NASA Jet Propulsion Laboratory.
NASA. 1996. Standard Assurance Requirements and Guidelines for Experiments. Cleveland, Ohio: NASA Lewis Research Center.
NASA News and Information Service. 1995. NASA's Discovery Program. Information Brochure, July.
NRC (National Research Council). 1994. Technology for Small Spacecraft. Panel on Small Spacecraft Technology, Committee on Advanced Space Technology, Aeronautics and Space Engineering Board. Washington, D.C: National Academy Press.
NRC. 1995. Managing the Space Sciences. Committee on the Future of Space Science, Space Studies Board. Washington, D.C.: National Academy Press.
NRC. 1995. A Scientific Assessment of a New Technology Orbital Telescope. Task Group on BMDO New Technology Orbital Observatory, Space Studies Board. Washington, D.C: National Academy Press.
NRC. 1995. The Role of Small Missions in Planetary and Lunar Exploration. Committee on Planetary and Lunar Exploration, Space Studies Board. Washington, D.C.: National Academy Press.
NRC. 1995. A Science Strategy for Space Physics. Committee on Solar and Space Physics and the Committee on Solar-Terrestrial Research, Space Studies Board. Washington, D.C.: National Academy Press.
NRC. 1996. Engineering Research and Technology Development on the Space Station. Committee on Use of the International Space Station for Engineering Research and Technology Development, Aeronautics and Space Engineering Board. Washington, D.C.: National Academy Press.
NRC. 1996. Review of NASA's Planned Mars Program. Committee on Planetary and Lunar Exploration, Space Studies Board. Washington, D.C.: National Academy Press.
National Space Development Agency of Japan. 1996. ADEOS: Advanced Earth Observing Satellite. Information brochure.
Olivieri, J.M. 1994. A Simplified Approach to High-Level Performance-Based Cost Estimating Relationships. Briefing presented to the 1994 NASA Cost Estimating Symposium at NASA Lyndon B. Johnson Space Center, Houston, Texas, November 7-10.
Pate-Cornell, E., and P.S. Fishbeck. 1993. PRA as a management tool: organizational factors and risk-based priorities for the maintenance of the tiles of the space shuttle orbiter. Reliability Engineering and Systems Safety. 40:239-257
Pate-Cornell, E., and P.S. Fishbeck. 1993. Probabilistic risk analysis and risk-based priority scale for the tiles of the space shuttle. Reliability Engineering and System Safety. 40:221-238.
Prince, A. 1994. Parametrics in Cost Proposal Preparation and Evaluation. Briefing presented to the 1994 NASA Cost Estimating Symposium at NASA Lyndon B. Johnson Space Center, Houston, Texas, November 7-10.
Redd, F.J., ed. 1996. Proceedings of the 10th Annual AIAA/Utah State University Conference on Small Satellites. Logan, Utah: Utah State University, Center for Space Engineering.
Sarsfield, L. 1996. Federal Investments in Small Spacecraft, Interim Report. DRU-1494-OSTP. Washington, D.C.: RAND Critical Technologies Institute .
Schoenfelder, T.E. 1994. One Pagers: An Overview of the Concept. Briefing presented to the 1994 NASA Cost Estimating Symposium at NASA Lyndon B. Johnson Space Center, Houston, Texas, November 7-10.
Sefcik, R. 1994. Estimating Costs of In-House Projects. Briefing presented to the 1994 NASA Cost Estimating Symposium at NASA Lyndon B. Johnson Space Center, Houston, Texas, November 7-10.
Sefcik, R. 1994. Estimating Joint US/Russian Projects: Lessons Learned from the Solar Dynamics on Mir Project. Briefing presented to the 1994 NASA Cost Estimating Symposium at NASA Lyndon B. Johnson Space Center, Houston, Texas, November 7-10.
Smith, K. 1994. Overview of MSFC Modeling Activities. Briefing presented to the 1994 NASA Cost Estimating Symposium at NASA Lyndon B. Johnson Space Center, Houston, Texas, November 7-10.
Stancati, M. 1996. Cost Estimation and Programmatic Risk Assessment. Working paper presented to the Workshop to Reduce Space Science Mission Costs, Arnold and Mabel Beckman Center, Irvine, Calif., October 16-18.
Taylor, D. 1994. Cost Data Exchange with the Air Force. Briefing presented to the 1994 NASA Cost Estimating Symposium at NASA Lyndon B. Johnson Space Center, Houston, Texas, November 7-10.
Twigg, L.T. 1994. NASA Langley Research Center Cost Estimating Office Organization Status. Briefing presented to the 1994 NASA Cost Estimating Symposium at NASA Lyndon B. Johnson Space Center, Houston, Texas, November 7-10.
Ullrich, P. 1996. Sciencecraft: New Millennium Approach. Presentation to the Joint Committee on Technology, National Research Council, May 31 .
Wertz, J., and W. Larson. 1996. Reducing Space Mission Cost. Boston: Kluwer Academic Publishers.
Winiewicz, C.M. 1994. Kennedy Space Center's Ground Operations Cost Model. Briefing presented to the 1994 NASA Cost Estimating Symposium at NASA Lyndon B. Johnson Space Center, Houston, Texas, November 7-10.