The following HTML text is provided to enhance online
readability. Many aspects of typography translate only awkwardly to HTML.
Please use the page image
as the authoritative form to ensure accuracy.
Appendix B Cost Analysis of Selected Studies, 1986-1996
Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole. Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter.
Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.
OCR for page 99
-->
Appendix B
Cost Analysis of Selected Studies, 1986-1996
Average Cost ($1,000s)
Project Purpose
Number of Projects
Reconnaissance
Feasibility
Shoreline beach Protection
2
442.5
1,346.0
Navigation/shallow draft
5
196.2
602.0
Navigation/inland waterways
3
126.7
1,991.7
Navigation/deep draft
10
268.8
1,861.6
Navigation/other
1
220.0
660.0
Hurricane damage protection
4
503.8
1,026.5
Flood damage protection
27
301.0
1,548.2
Environmental
2
225.0
1,830.0
Total Average
54
291.6
1,830.0
Source: Corps data.