| Copyright © 2009. National Academy of Sciences. All rights reserved. Terms of Use and Privacy Statement |
Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter.
Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.
OCR for page R1
NCHRP Web Document 1 2
(Project 3-47}
Contractor's Final Report
CAPACITY ANALYSIS OF INTERCHANGE
REDIP TERMINALS
FINAL REPORT
Prepared for
National Cooperative Highway Research Program
Transportation Research Board
National Research Council
Carroll I. Messer
Texas Trar~sportation Institute
and
James A. Bonneson
University of Nebraska-Lir~coIn
for
Texas A & M Research Foundation
TAMURF 7241
April 1997
OCR for page R2
He ..
, t
, ,,} ..
,4 .,
~OWLEDGMENT
; :was sponsored by the American
w{.S - e Highway and Tr~sportabon
; ~^m cooperator with the Federal
_, "d was conducted in He
Eve Highway Research Program
); which Is aired by the Transportabon
Reich Board BE of the Nabonal Research
C~ciL
.
1
DISCLAIMER
The opinion and conchlsions expressed or implied in
the report are those of the research agency. They are
not necessarily those of the TRB, the National
Research Councit AA~SHTO, or He U.S. Go~rer~ent.
This report has not been edited by TRB.