Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter.
Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.
OCR for page 133
9
Joint Force Research and Development
This chapter discusses research and development that is not within the Anny's
exclusive purview. This research, which should be conducted by the other services or
under joint auspices, includes the development of strategic lift capabilities, long-range
supporting fire, and interoperable command and control systems.
STRATEGIC LIFT CAPABILITIES
The AAN concept is founded on the ability of an AAN battle force to be
deployed from the continental United States to a forward base area within
1,000 km of the mission area. Deployment from the United States to a staging area will
require that Army assets be transported by either the Air Force or the Navy or a
combination of the two. The committee found little DoD or service research focused on
upgrading the current strategic lift capability, which is limited by payload in the air and
ship speed on the sea. The Arrny has not stated requirements for heavy (> 500 tons)
airlift or fast (> 100 knots) sealift although research is under way in the civilian sector.
The Army, based on what it learns in the AAN process, should evaluate the need for
such capabilities.
The Air Force plans to improve its C-17 advanced military airlift aircraft as it
extends the lifespan of the fleet. The C-17 can transport more than 85 tons and has a
cruising speed of Mach 0.74 to Mach 0.77. The C-17's range is more than 4,000 km, and
the plane can land in less than 3,000 feet. In fact, the C-17 holds a world record for
taking off in 417 meters with a cargo of more than 22 tons and landing in 413 meters.
(Boeing, 1998) The number of C-17's planned in the inventory, however, will not be
adequate to meet the AAN requirement of strategically airlifting 1,000 to 2,000 15-ton
vehicles, up to 8,000 Coops, and their accompanying supplies in a 48-hour time frame
(see Chapter 51.
For the foreseeable future, the only military capabilities for strategic seaTift are
the fast seaTift ship and the large, medium-speed, roll-on/rol1-off (LMSR) ship. The fast
sealift ship, with limited roll-on/roll-off capability, moves at 30 knots and displaces
61,500 tons (USN, 1998~. The newer LMSR displaces 62,700 tons and moves at a speed
of 24 knots. It can carry 58 tanks, 48 other tracked vehicles, and more than 900 trucks or
other wheeled vehicles (DoD, 199Sb). An AAN support sealift must be able to carry
much larger Toads and travel at speeds of more than 100 knots.
Research being conducted by industry to improve both sea and airlift capabilities
has been limited by a lack of clients who are willing to support development. Industry
personnel contacted by the committee believe that the concepts of both heavy airlift and
133
OCR for page 134
134
REDUCING THE LOGISTICS BURDEN FOR THE ARMY AFTER NEXT
fast seaTift have been validated and that there are a few commercial applications for
them. But the number of commercial applications is too small to justify the commercial
investment, and a partnership arrangement will be necessary to make development cost
feasible for both the military and commercial market.
Professor Charles Owen at the TIlinois institute of Technology proposed a design
for a lighter-than-air carrier that could carry 3,500 passengers and 35,000 tons of cargo
(Nadis, 1997~. Unfortunately, this carrier would have a limited air speed and be subject
to the same constraints that face all lighter-than-air carriers. For AAN, the Army
requirement is to carry a nominal 500 tons at speeds slower than a C-130 but faster than
a lighter-than-air vehicle.
Other revolutionary proposals have also been made. Lockheed-Martin, for
example, has investigated placing floats on the C-130, which would give the C-130 the
capability of linking up with prepositioned floating logistics supplies and delivering
them to a battle area rapidly (Donaldson, ~ 997~. Depending on the geography and enemy
situation in the battle area, C-130 aircraft could be used for either operational or strategic
lift.
Domestic and international commercial shipping interests are working on the
development of high-speed ships. Both Russia and the United States have design projects
for ships that can carry as much as 10,000 tons at a speed of more than 100 knots with
ranges of more than 10,000 nautical miles. These ships could be used to transport
personnel and supplies from a floating depot or from the continental United States
(Donaldson, 1997~.
Heavy lift aircraft and fast ships also have considerable commercial potential.
Air transport or fast sea transport of high value commodities would substantially reduce
a manufacturer's inventory. Even if commercial aircraft and ships are available by 2025,
they will probably not have the unique characteristics required by the military. Now is
the time for the Anny to begin working with the Navy and the Air Force to ensure that
commercial developments take military requirements into account. This intervention
could involve partnerships and/or arrangements similar to the current Civilian Reserve
Air Fleet (CRAF) program. Under CRAF, civilian air carriers are committed to provid-
ing passenger and cargo capacity for the military when necessary in exchange for
government airlift business in peacetime (Rutherford, ~ 99S).
This approach would be in keeping with the recommendations in the STAR 21 study
(NRC, 1993a) concerning more conventional lift capabilities. The study stated:
The STAR Committee suggests that CRAF is a resource the Army can exploit
more fully in the future. To do so the Army should go beyond passively "making
do" with whatever capacity comes out of current or future CRAF arrangements.
The Army should work actively to influence CRAF capabilities. Such
influence can be exerted in two ways: (1) by persuasion of the parties involved (i.e.,
the commercial cargo carriers) and (2) by seeking legislative inducements that favor
capabilities the Army will need.
(NRC, 1993a)
This strategy is more urgently needed now than it was when the STAR 21 study
was completed in 1993 for two reasons. First, advances in technology have made
possible greater lift capability than was imagined in 1993; second, the AAN concept
requires rapid deployment of a lighter force. Air carriers are more likely to be able to
move a light force than large numbers of 70-ton tanks.
OCR for page 135
JOINT FOR CE RESEARCH AND DEVELOPMENT
135
In addition to lifting the force to a staging area by air, the Air Force may also be
called upon to resupply the battle force by parachute drop. The focus areas for research
are advanced parachutes, nonparachute decelerators, precision airdrop, and high-
performance computing. These technologies could move the AAN from "just-in-case
capability," through "just-in-time capability," to "precision resupply" capability.
LONG-RANGE SUPPORTING FIRE
The AAN battle force will have both battlefield mobility and battlefield lethality.
The first can require only Anny capabilities, but the second will certainly require support
from the other services. As the Anny has moved forward to define its AAN concepts for
2025, the other services have focused more on the intermediate time frame, 2010 to
2015.
Major concepts of Joint Vision 2010 are focused on "dominant maneuver" and
"precision engagement" (see Figure 9-~. Both concepts involve using all components of
the U.S. military across the selected battle space. Dominant maneuver is the "application
of information, engagement, and mobility capabilities to position and employ widely
dispersed joint air, land, sea, and space forces to accomplish assigned operational tasks."
Precision engagement is "a system of systems that enables...forces to locate the objective
or target, provide responsive command and control, fend] generate the desired effect..."
These two concepts are coupled with focused logistics and "fulI-dimensional
^ protection," the multiservice capability to control the battle space both horizontally and
vertically. In short, future military operations will require the integrated capabilities of
all of the services.
FIGURE 9-1 Joint Vision 2010 operational concepts. Source: DoD, 1996.
OCR for page 136
136
RED UCING THE L OGISTICS B URDEN FOR THE ARMY AFTER NEXT
As the Army continues to develop the AAN battle force concept, it must work
closely with the other services and DoD to determine which battle force needs should
and would be met by other services. Every precision round launched by another service
is a round that does not have to be carried to the battle area by the battle force. A
combination of fire support by other services and extended-range fire support by Army
units operating from the staging area could substantially reduce the logistics
requirements of the battle force.
INTEROPERABLE COMMAND AND CONTROL SYSTEMS
The success or failure of the AAN concept may well depend on its C4ISR
(command, control, communications, computing, intelligence, surveillance and recon-
naissance) capabilities. The four main concepts of Joint Vision 2010 assume an envelope
of "information superiority," which will require linkage and integration with systems of
other services. Although the Army should proceed to develop C4ISR capabilities for the
AAN battle force, these capabilities should be part of the collective joint information
superiority. Every capability that can be provided to the Army by another service oper-
ating under the concepts of Joint Vision 2010 reduces the need for the battle force to
carry equipment and personnel into the battle area. Focusing on joint responsibilities not
only can increase the combat effectiveness, but also can reduce the logistics burden of
the AAN battle force.
FINDINGS
The Army will depend on the Air Force and Navy to ferry the battle force and
sustaining supplies to the staging area, to provide coordinated fire support, and to assist
with C4ISR. It is also likely that much of the operational mobility requirement will be
satisfied by the Air Force. It is imperative that the Army participate in planning for this
support to ensure that operational and logistical needs of the AAN battle force can be
fulfilled.
Technology developments necessary to enable strategic lift of the AAN battle
force will probably overlap with technology requirements for operational, and possibly
tactical, mobility. The Army should identify the overlapping requirements and encourage
DoD to establish responsibilities among the services for satisfying these requirements as
soon as possible.
Representative terms from entire chapter:
aan battle