Skip to main content

Currently Skimming:

IV Future Plans for the Study
Pages 53-54

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 53...
... As noted above, some critical data, analyses and plans were not available when this report was written: the performance assessment for closed tanks; plans for residual waste characterization; plans for tank annuli and tank-system piping; support for assumptions, estimated levels of conservatisms, and sensitivity analyses for performance assessment calculations; and longterm monitoring plans are examples of the missing information. In this interim report, the 53
From page 54...
... the roles of the Class C limits and the performance objectives in determining whether on-site disposal is acceptable; and (4) research and development needs, particularly in-tank and downstream processing consequences of chemical cleaning options, technologies to assist in tank waste removal, including robotic devices, and studies of the projected near- and long-term performance of tank fill materials, such as grout.


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.