Skip to main content

Currently Skimming:

4 Facilities and Human Resources
Pages 19-20

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 19...
... As indicated to the panel, the SAC reported that "the NCNR exhibits the highest regard for safety culture at every level and is implementing the Technical Specifications as required."7 Coinciding with the NRC panel's current review of the NCNR in March 2011, Japan was struggling to control four nuclear power reactors crippled in a magnitude 9.0 earthquake. Explosions blew the roofs off three of the Japanese reactors.
From page 20...
... Additionally, refurbishing the control room and the planned development of a formal software quality program have broad applicability for contributing to safe operation and constitute a key element of a comprehensive security program. There is only one vendor for the fuel used in the NCNR reactor, and costs, which are increasing every year, will be substantially higher with the conversion to low enriched uranium.


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.