Skip to main content

Winter Highway Operations (2005) / Chapter Skim
Currently Skimming:

Design and Construction
Pages 22-22

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 22...
... GazEx was the only option for on-site systems; however, notable recent advancements include the remote "Avalanche Blaster Cache" and mortar technology being evaluated by the Wyoming DOT, along with the AvalHex recently introduced from France. There are several current highway avalanche research projects supported by FHWA and TRB including • Optimization of the Avalauncher avalanche control projectile, • Evaluation of remote control equipment for avalanche clean-up, • Infra-sonic monitoring of avalanche activity, and • Wind drift disrupters.


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.