Appendix E: Glossary of Estimating Terms Used by Federal Agencies
Pages 39-42

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 39...
... The initials in parentheses after each definition indicate the agencies that use that term essentially as defined. The initials shown refer to the following agencies: AF Air Force Directorate of Engineering and Services; CE Army Corps of Engineers; DoE Department of Energy (Real Property and Facilities Management Division)
From page 40...
... (NASA3 ESTIMATE, CURRENT WORKING Current estimated cost of a project based on best available information including estimated or actual contract cost; contingencies; supervision and adrninistrat~on; inspection and overhead; engineering and design after contract award; other direct costs; pending costs; and government furnished materials and purchase orders.
From page 41...
... The engi- analyze estimates developed by proponents of a peering estimates for these submittals include project. Anindependent cost estimate also serves all labor and material costs for each item, in- as a basis for verifying risk assessments.
From page 42...
... Through use of plant engineering and design funds, Title I may be completed prior to inclusion of the project in the budget. If this should occur, the Title I design estimate becomes synonymous with the budget estimate.