Appendix B Cost Analysis of Selected Studies 1986-1996
Pages 99-99

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 99...
... Appendix B Cost Analysis of Selected Studies, 19X6-1996 Average Cost ($1,000s) Project Purpose Number of Reconnaissance Feasibility Projects Shoreline beach Protection 2 442.5 1,346.0 Navigation/ sha How drag 5 196.2 602.0 Navig ation /i n I and waterways 3 126.7 1,991.7 Navigationldeep draft 10 268.8 1,861.6 Navigation/other 1 220.0 660.0 Hurricane damage protection 4 503.8 1,026.5 Flood damage protection 27 301.0 1,548.2 Environmental 2 225.0 1,830.0 Total Average 54 291.6 1,830.0 SOURCE: Corps data.