Appendix D Biographies of Committee Members
Pages 115-120

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 115...
... Clark, Sr., recently retired as president, chief operating officer, and chief executive officer of GPU Nuclear Corporation, which operates and maintains the Three Mile Island Nuclear Power Plant in Pennsylvania and the Oyster Creek Nuclear Power Plant in New Jersey. He was elected to the NAE in 1993 and was a member of the NRC Committee on Decontamination and Decommissioning of Uranium Enrichment Facilities.
From page 116...
... Crimi recently retired as vice president, Lockheed Martin Advanced Environmental Systems Company. He previously served as vice president of Nuclear Engineering Services, Waste Chem Corporation; manager of decommissioning services, General Electric Company; and manager of plant systems engineering, Advanced Reactor Systems at General Electric.
From page 117...
... Mr. Gilbert was the project director of the PB/ MK Team for design, construction management, and construction of the conventional facilities of the Department of Energy's Superconducting Super Collider and has served as principal-in-charge for major civil engineering projects, such as the Stanford Linear Accelerator Positron-Electron Project, Basalt Waste Isolation Project at Hanford, Nuclear Power Plants in Mined Caverns Study, Downtown Seattle Transit Project, Long Beach Naval Fuel Pier, and the Boston and San Francisco Effluent Outfall Tunnels.
From page 118...
... He was planning manager on the Heavy Water-New Production Reactor construction project and managed the Bechtel design and cost-estimating team in support of the DOE Richland studies on conversion of the WNP-1 reactor to defense materials production; directed development of comparative advanced conceptual designs, construction techniques, cost estimates, and schedules for the $6 million DOE New Production Reactor Study; was manager of Nuclear Fuel Cycle Economics; was Bechtel's technical manager for post-accident planning for the recovery of Three Mile Island Unit 2, including the testing of proposed decontamination techniques and removal of the damaged fuel; and was project engineer for the preliminary design of the Alabama Enrichment Plant, a $3 billion gaseous diffusion enrichment complex. He was a member of the NRC Committee on Decontamination and Decommissioning of Uranium Enrichment Facilities and the Committee on Technology Development for Decontamination and Decommissioning.
From page 119...
... Previous to his assignment at Rocky Flats, he was deputy manager of the Savannah River Operations Office, where he successfully oversaw construction of the Defense Waste Processing Facility, a $3 billion vitrification facility to stabilize and safely store more than 10 million gallons of highly radioactive liquid waste. He has served as an area manager of the DOE's Western Area Power Administration, director of the Denver Oil Shale Project Office, and director of the Geothermal Loan Guaranty Program.
From page 120...
... Mr. Smith was a member of the NRC Committee on Decontamination and Decommissioning of Uranium Enrichment Facilities and contributed to the NRC study that examined proposed plans for disposing of spent aluminum-uranium fuels from domestic and foreign research reactors.