... 3.1.1 Significantly Safer 3.1.2 Equally or More Cost Effective 3.1.1.1 Is the alternative technology significantly safer than the baseline technology? 3.1.2.1 3.1.3 Meets the Schedule for Complete Stockpile 3.1.3.1 Destruction 3.2 Regulatory Legal (Basic Category)
From page 60...
... 1 Will the location and/or nature of this technology disproportionately affect minority or low-income communities? Will the emissions resulting from operation of this technology comply with air permit emission limits for criteria pollutants?
From page 61...
... For technologies implemented in MD or IN, will management of treatment residues meet RCRA requirements for treatment, storage, and disposal? For technologies implemented in IN, will monitoring data from a comparable facility be available prior to the scheduled date of RCRA permit issuance?
From page 62...
... What is the probability of process upsets due to human error over the duration of the disposal program, which if unmitigated have the potential for agent release? What is the probability of agent release outside engineering controls given that a process upset has occurred?
From page 63...
... 3.4.4.2 Are mitigating systems effective at mitigating the process upset? 3.4.5.1 3.4.5.2 To what extent is manual operation adjacent to agent containing equipment required?
From page 64...
... What are the potential long-term health effects for plant workers from the alternative technology? Does the alternative technology effectively destroy HD chemical agent (MD CAC)
From page 65...
... 3.7.3 Facility systemization schedule 3.7.4 Facility operating schedule 3.7.5 Facility closure schedule 3.7.3.1 What is the time required for facility systemization? What is the effect of experience with this technology on the systemization schedule?
From page 66...
... What are the costs associated with facility construction? What are the costs associated with providing the required support for the facility?
From page 67...
... What is the cost of transportation of hazardous and nonhazardous material offsite? What is the cost of treatment and disposal of hazardous and nonhazardous material transported offsite?
From page 68...
... 3.9.5.2 What are the gaseous and liquid effluents from the ton container decontamination process?
From page 69...
... 3.10.8.1 Does existing proven process monitoring technology meet process control requirements? 3.10.8.2 Are all chemical reactions easily controlled?
From page 70...
... 3.10.9.2 What is the disposal method for facility decontamination solutions? 3.10.10.1 How effective is the decontamination of the ton containers?