Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
95 The papers, books, reports, and websites referred to in the guidebook and its appendices are listed here. An annotated bibliography is also developed in this research which can be found in TCRP Web-Only Document 41, available at http://trb.org/news/blurb_detail.asp?id=9886. (2000). âCM/GC White Paper, Public Contracting Coalition.â OR. (2002). âDesign-Build White Paper, Public Contracting Coalition.â OR. 3D/International, Inc. (2005). CM at Risk. Available at http://www.3di.com/toolbox/cmatrisk.pdf (accessed April 1, 2005). AIA Minnesota (2006). âUnderstanding Project Delivery for the Design and Construction of Public Buildings.â AIA Minnesota, Minneapolis, MN. Allen, L. N., D. D. Gransberg, and K. R. Molenaar (2002). âPartnering Successful Design-Build Contracts in the Naval Facilities Engineering Command Southwest Division.â The Military Engineer, Vol. 94 (616), 47â48. American Institute of Architects (AIA) (2005). Construction Manager at-Risk State Statute Com- pendium. AIA Government Affairs, American Institute of Architects, Washington, DC, 125â129. American Institute of Architects, California Council (1996). Handbook on Project Delivery. Sacra- mento. American Institute of Architects, California Council, Sacramento, CA. Associated General Contractors (2004). Project Delivery Systems for Construction. Associated Gen- eral Contractors of America, Arlington, VA. Beard, J., Loulakis, M., and Wundram, E. (2001). Design-Build: Planning Through Development. RR Donnelley, Chicago, IL. Bearup, W., Kenig, M., and OâDonnell, J. (2007). âAlternative Delivery Methods, A Primer.â Pro- ceedings, ACI-NA Project Delivery Summit II, Airport Board Members and Commissioners Annual Conference. Airports Council International-North America, Chicago, IL. Chan, A., Yung, K., Lam, P., Tam, C., Cheung, S. (2001). âApplication of Delphi Method in Selection of Procurement Systems for Construction Projects.â Construction Management and Economics, Vol. 19, 699â718. Chang, K. (2004). âMultiattribute Weighting Models for Best-Value Selection in Public Sector Design-Build Projects.â Ph.D. dissertation, University of Colorado. Construction Industry Institute (CII) (1997). âProject Delivery Systems: CM at Risk, Design- Build, Design-Bid-Build.â Research Summary RS 133-1, CII, Austin, TX. Construction Industry Institute (CII) (2003). âOwnerâs Tool for Project Delivery and Contract Strategy Selection.â Research Summary RS 165-1, CII, Austin, TX. Debella, D. C., and Ries, R. (2006). âConstruction Delivery Systems: A Comparative Analysis of Their Performance within School Districts.â Journal of Construction Engineering and Man- agement, Vol. 132, No. 11, 1131â1138. El Wardani, M., Messner, J., Horman, M. (2006). âComparing Procurement Methods for Design- Build Projects.â Journal of Construction Engineering and Management, Vol. 132, No. 3, 230â238. A P P E N D I X A References
FTA (2003). Third Party Contracting RequirementsâCircular 4220.1E. FTA, U.S. DOT, Washington, D.C. FTA (2006). Annual Report on New Starts: Proposed Allocation of Funds for Fiscal Year 2007â Report of the Secretary of Transportation to the United States Congress Pursuant to 49 U.S.C. 5309(k)(1). FTA, U.S. DOT, Washington, DC. FTA (2007). âPMO Operating Procedures No. 40, Risk Management Products and Proceduresâ (internal document). FTA, U.S. DOT. Garvin, M. (2003). âRole of Project Delivery Systems in Infrastructure Improvement,â in Winds of Change: Integration and Innovation in ConstructionâProceedings of Construction Research Congress, March 19â21, 2003, Honolulu, HI. Eds. Keith R. Molenaar and Paul S. Chinowsky (CD-ROM). ASCE, Reston, VA. Ghavamifar, K., and Touran, A. (2008). âAlternative Project Delivery Systems: Applications and Legal Limits in Transportation Projects.â Journal of Professional Issues in Engineering Educa- tion and Practice, Vol. 134, No. 1, 106â111. Gordon, C. M. (1994). âChoosing Appropriate Construction Contracting Method,â Journal of Construction Engineering and Management, Vol. 120, No. 1, 196â210. Gordon & Rees LLP (2005). âThe Basics of Design Build,â Construction Group Newsletter, Gor- don & Rees LLP, San Francisco, CA. Graham, P. (2001). âEvaluation of Design-Build Practice in Colorado IR IM(CX) 025-3(113).â Colorado Department of Transportation, Denver, CO. Gransberg, D. D., and Barton, R. F. (2007a). âAnalysis of Federal Design-Build Request for Pro- posal Evaluation Criteria,â Journal of Management in Engineering, ASCE, Vol. 23 (2), April 2007, pp. 105â111. Gransberg, D. D., Badillo-Kwiatkowski, G. M., and Molenaar, K. R. (2003). âProject Delivery Comparison Using Performance Metrics.â Presentation at 2003 Transactions, AACE Inter- national, Orlando, FL, pp. DRM 02.01â02.06. Gransberg, D. D., and Molenaar, K. R. (2004). Analysis of Ownerâs Design and Construction Qual- ity Management Approaches in Design/Build Projects, Journal of Management in Engineering, 20(4). Gransberg, D. D. and Molenaar, K. R. (2007b). The Impacts of Design-Build on the Public Work- force, Research Paper 07-01, USC Keston Institute for Public Finance and Infrastructure Policy, University of Southern California, Los Angeles, CA. Halpin, D. W. (2006). Construction Management, 3rd ed. John Wiley and Sons, Inc., New York, New York. Harrington-Hughes, K. (2002). TCRP Research Results Digest 53: International Transit Studies Program Report on the Spring 2001 MissionâDesign-Build Transit Infrastructure Projects in Asia and Australia. Transportation Research Board of the National Academies, Washington, DC. Ibbs, C. W., Kwak, Y., Odabasi, A. (2003). âProject Delivery System and Project Change: A Quan- titative Analysis.â Journal of Construction Engineering and Management, Vol. 129, No. 4, 382â387. Irwin, D. (2003). âDeveloping the Design and Construction Contracting Plan for a Major Light Rail Extension Project.â Transportation Research Circular E-C058: The 9th Annual National Light Rail ConferenceâExperience, Economics, and EvolutionâFrom Starter Lines to Growing Systems. Transportation Research Board of the National Academies, Washington, D.C., 557â575. http://onlinepubs.trb.org/Onlinepubs/circulars/ec058/ec058.pdf. Kessler, F. (2005). âManaging Your Money: Project Delivery Methods.â MassTransit, April 2005, 26â39. http://www.nossaman.com/showarticle.aspx?show=913 (accessed March 20, 2007). Kumaraswamy, M. M., and Dissanayaka, S. M. (1998). âLinking Procurement Systems to Proj- ect Priorities,â Building Research and Information, Vol. 26, No. 4, 223â238. Konchar, M., and V. Sanvido (1998). âComparison of U.S. Project Delivery Systems.â Journal of Construction Engineering and Management, Vol. 124, No. 6, 435â444. 96 A Guidebook for the Evaluation of Project Delivery Methods
Loulakis, M. (2000). Project Delivery Systems: Evaluating Ownerâs Alternatives. A/E/C Training Technologies, Reston, VA. Loulakis, M. (2005). Construction Project Delivery Systems: Evaluating the Ownerâs Alternatives. (CD-ROM). A/E/C Training Technologies, Reston, VA. Mahdi, I. M., and Al-Reshaid, K. (2005). âDecision Support System for Selecting the Proper Project Delivery Method Using Analytical Hierarchy Process.â International Journal of Proj- ect Management, 23, 564â572. Minchin, E., Thakkar, K., Ellis, R. (2007). âMiami Intermodal CenterâIntroducing âCM-At-Riskâ to Transportation Construction.â In Molenaar, K. R., and Yakowenko, G., Eds., Alternative Project Delivery, Procurement, and Contracting Methods for Highways, 46â59. ASCE Press, Reston, VA. Mitchell, B. P. (1999). âThe Applicability of the Spearin Doctrine: Do Owners Warrant Plans and Specifications?â FindLaw for Legal Professionals. http://library.findlaw.com/1999/Aug/1/ 128038.html (accessed March 24, 2007). Molenaar, K. R. (2005). âProgrammatic Cost Risk Analysis for Highway Megaprojects.â Journal of Construction Engineering and Management, Vol. 131, No. 3, 343â353. Molenaar, K. R., and Scott, S. (2003). âExamining the Performance of Design-Build in the Pub- lic Sector.â In Loulakis, M., Ed., Design-Build for the Public Sector, 71â112. Aspen Business and Law, Aspen Publishers, New York, NY. Molenaar, K. R., Gransberg, D. D., Scott, S., Downs, D., and Ellis, R. (2005). âRecommended AASHTO Design-Build Procurement Guide.â Final Report for NCHRP Project 20-7(172). Transportation Research Board of the National Academies, Washington, DC. North Carolina State Construction Office (2005). âConstruction Management-At-Risk Selection Procedures.â http://interscope2.doa.state.nc.us/Guidelines/CM@RISK%20SELECTION% 20PROCEDURES.pdf (accessed January 31, 2005). Oyetunji, A. A, Anderson, S. D., (2006). âRelative Effectiveness of Project Delivery and Contract Strategies.â Journal of Construction Engineering and Management, Vol. 132, No. 1, 3â13. Parsons, Inc., Touran, A., and Golder Associates. (2004). âRisk Analysis Methodologies and Pro- cedures.â Prepared for the FTA. Riley, D. R., Diller, B. E., Kerr, D. (2005). âEffects of Delivery Systems on Change Order Size and Frequency in Mechanical Construction.â Journal of Construction Engineering and Manage- ment, Vol. 131, No. 9, 953â962. Saaty, T. L. (1990). Multicriteria Decision Making: The Analytical Hierarchy Process. RWS Publications, Pittsburgh, PA. Science Applications International Corporation (SAIC), AECOM Consult, and the University of Colorado at Boulder (2006). Design-Build Effectiveness StudyâAs Required by TEA-21 Sec- tion 1307(f). FHWA, U.S. DOT, Washington, DC. www.fhwa.dot.gov/reports/designbuild/ designbuild0.htm (accessed August 30, 2006). Scott, S. Molenaar, K. R., Gransberg, D. D., Smith, N. C. (2006). NCHRP Report 561: Best Value Procurement Methods for Highway Construction Projects. Transportation Research Board of the National Academies, Washington, DC. Skitmore, R. M., and Marsden, D. E. (1988). âWhich Procurement System? Towards a Universal Procurement Selection Technique.â Construction Management and Economics, 6, 71â89. Smith, N. and Davis, B. J. (2006). â50-State Survey of Transportation Agency Design-Build Authority.â Nossaman, Guthner, Knox & Elliot LLP. www.nossaman.com/showArticle. aspx?show=925 (accessed December 12, 2006). Temesi, J. (2006). âConsistency of Decision Maker in Pairwise Comparisons.â International Jour- nal of Management and Decision Making, Vol. 7, No. 2/3, 267â274. Touran, A., Bolster, P. J., and Thayer, S. W. (1994). Risk Assessment in Fixed Guideway Construction. DOT-T-95-01, FTA, U.S. DOT, Washington, D.C. Appendix A 97
Walewski, J. Gibson, Jr., G. E., Jasper, J. (2001). Project Delivery Methods and Contracting Approaches Available for Implementation by the Texas Department of Transportation. FHWA/TX-0-2129-1. Texas Department of Transportation, Austin, TX. Weber, M., and Borcherding, K. (1993). âBehavioral Influences on Weight Judgments in Multi- attribute Decision Making,â European Journal of Operational Research, Vol. 67, 1â12. Wiss, R. A., Roberts, R. T., Phraner, S. D. (2000). âBeyond Design-Build-Operate-Maintain: New Partnership Approach Toward Fixed Guideway Transit Projects.â In Transportation Research Record: Journal of the Transportation Research Board, No. 1704, Transportation Research Board, National Research Council, Washington, DC, 13â18. Woodman, G. K., Starke, J. S., and Schwartz, L. D. (1995). TCRP Legal Research Digest 4: Transit Labor Protection-A Guide to Section 13(c) Federal Transit Act. Transportation Research Board, National Research Council, Washington, DC. 98 A Guidebook for the Evaluation of Project Delivery Methods